Planning

24/033 - South West Scotland Onshore System (SWSOS) Electrification Program

GASNETWORKS IRELAND

  • Contract Timeline

    Publication Date

    30th September 2024 15:10:56 PM

    Planning Deadline

    28th October 2024 12:00:00 PM   24 days remaining

  • Contract Summary

    Gas Networks Ireland (GNI) operates two compressor stations Brighouse Bay and Beattock, both in located in South Scotland, to transport natural gas from the UK through a pipeline system to Ireland. The natural gas compressors on these compressor station are driven by gas turbines between 6MW and 12MW of rated power. The primary objective of the Electrification Programme is to reduce the use of fuel gas in the operation of the Brighouse Bay and Beattock compressors stations and associated fugitive emissions thereby aiding the reduction of greenhouse gas emission intensity by 50% (from 2010 level) by 2030 as outlined in Gas Networks Ireland's Low Carbon Pledge. The Electrification Programme at both Brighouse Bay and Beattock compressor stations comprises three major components at both stations: 1. construction of a new compressor hall with an EMD and ancillary equipment; 2. construction of a new electrical connection to upgrade the supply capacity to power the new EMD; and 3. the installation of a vent recovery system to capture normally vented gas and return it to the gas network.

  • Contract Details

    Open Contracting ID

    ocds-h6vhtk-04a441

    Publication Source

    Find a Tender Service

    Procurement Stage

    Planning

    Procurement Method

    N/A

    Procurement Method Details

    N/A

    Procurement Category

    Works

    Tender Suitability

    Framework / DPS

  • Contract Classification

    CPV Code(s)

    45250000

    CPV Division(s)

    45 - Construction work

  • Awarding Authority

    GASNETWORKS IRELAND

    Buyer Name

    Tender Admin

    Buyer Email

    tenders@gasnetworks.ie

    Buyer Phone

    +44 214239065

    Buyer Address

    Gasworks Road

    Cork

    Ireland