Notice Information
Notice Title
UK7 - Contract Details Notice
Notice Description
The DIO has an Estate Lens Model under development. This Model provides analysis of the demand and supply for the entire MOD estate. The Model has been developed within the SAS system which allows data from various sources to be analysed. An interlinked model that provides scenario planning functionality is also in development. The Models require ongoing further stages of development to allow improved visualisation, improved maturity and to capture planned and aspirational changes.
Procurement Information
The MOD has a strategic objective to improve its Asset Management in particular demand management. One of the workstreams within this is the development of its understanding of the supply and demand of its estate. The Estate Lens Model has been developed over the past four years by the MOD in conjunction with a SME Supplier that specialises in infrastructure demand and space management. Surveys have been undertaken to test the validity of the Model. The Estate Lens Model is now fed by automated links to other MOD datasets. It is anticipated that further live links to key (but not all) MOD datasets will be achieved this coming calendar year. Further development work is required on an ongoing basis to develop the modelling and embed scenario planning so that we can move from understanding the current position to modelling future scenarios. The MOD wishes to develop its understanding of the trajectory for the Defence Estate and also to develop the Estates Lens modelling tools. We want to be able to move towards being able to devolve supply and demand to site level having provided strategic level analysis and direction. The extension of existing services provided by Think Idea is required because this is a specialist demand planning and spatial analysis area where the Supplier has developed in collaboration with the DIO and MOD TLBs a bespoke Estate Lens modelling process (including adjacency planning) for MOD sites. The Estate Lens is a unique system that has been developed over the last 4 years with the Supplier and regular engagement with DIO Estate Strategy, DEX and other MOD TLBs. DIO project team estimate it would take a new Supplier at least six months to start to understand the architecture / nuances of the Estate Lens and what is required to further develop it. These enhancements should include 1) better presentation of data, 2) enhancement of maturity and calculations, 3) ability to plan for change and scenario change, 4) to include further MOD data sets, 5) bring in new functionality and 6) complete site surveys to assist in understanding the model and developing it further. To deliver this the existing Supplier has: SS expertise in the analytics and modelling of the demand and supply of estate. This should include understanding spatial and predictive (inc time series) modelling and analysis. SS expertise in Government and Military/Defence ways of working and estate use / management. be able to complete Project Management and Site Surveys. This should be in accordance with DIO ways of working namely in an agile environment. have Agile Software Designers and Developers (as the Estate Lens Model and Scenario Planning Tool are bespoke to MOD) capable of developing Beta or Live models. be able to complete Agile Software Development of the Estate Lens Model and Scenario Planning Tool be specialists in working with Government Digital Design and Services guidelines and best practices. The Authority considers that a change in supplier would incur disproportionate expense and delay (of at least six months) whilst a new Supplier started to understand the current Estate Lens maturity and future development requirement. There are disproportionate risks associated with this. The Defence Infrastructure Organisation, on behalf of the Secretary of State for Defence (the "Authority"), intends to place a 2-year (second year being an Option) contract with Think Idea Limited, to complete the next phase of the Estate Lens development. As a covered procurement, it is considered that the direct award of the contract is lawful in accordance with Section 41(1) and Paragraph 7 of Schedule 5 of the Procurement Act 2023. The extension of existing services provided by Think Idea is required because introducing a new Supplier at this stage of the project will introduce disproportionate risks and costs whilst any new Supplier is procured and then learns the idiosyncrasies of the model. The professional estimate is that any newly introduced Supplier could take up to six months to reach operational effectiveness.
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-h6vhtk-04f7c8
- Publication Source
- Find A Tender Service
- Latest Notice
- https://www.find-tender.service.gov.uk/Notice/072722-2025
- Current Stage
- Award
- All Stages
- Award
Procurement Classification
- Notice Type
- UK10 - Contract Change Notice
- Procurement Type
- Standard
- Procurement Category
- Services
- Procurement Method
- Direct
- Procurement Method Details
- Direct award
- Tender Suitability
- SME
- Awardee Scale
- SME
Common Procurement Vocabulary (CPV)
- CPV Divisions
70 - Real estate services
-
- CPV Codes
70112000 - Development of non-residential real estate
Notice Value(s)
- Tender Value
- Not specified
- Lots Value
- Not specified
- Awards Value
- £799,840 £500K-£1M
- Contracts Value
- £799,840 £500K-£1M
Notice Dates
- Publication Date
- 11 Nov 20256 months ago
- Submission Deadline
- Not specified
- Future Notice Date
- Not specified
- Award Date
- 24 Mar 20251 years ago
- Contract Period
- 30 Apr 2025 - 31 Mar 2026 6-12 months
- Recurrence
- Not specified
Notice Status
- Tender Status
- Complete
- Lots Status
- Complete
- Awards Status
- Active
- Contracts Status
- Active
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- DEFENCE INFRASTRUCTURE ORGANISATION
- Contact Name
- Available with D3 Tenders Premium →
- Contact Email
- Available with D3 Tenders Premium →
- Contact Phone
- Available with D3 Tenders Premium →
Buyer Location
- Locality
- LICHFIELD
- Postcode
- WS14 9PY
- Post Town
- Walsall
- Country
- England
-
- Major Region (ITL 1)
- TLG West Midlands (England)
- Basic Region (ITL 2)
- TLG2 Shropshire and Staffordshire
- Small Region (ITL 3)
- TLG24 Staffordshire CC
- Delivery Location
- Not specified
-
- Local Authority
- Lichfield
- Electoral Ward
- Whittington & Streethay
- Westminster Constituency
- Tamworth
Further Information
Notice Documents
-
https://www.find-tender.service.gov.uk/Notice/072722-2025
11th November 2025 - Contract change notice on Find a Tender -
https://www.find-tender.service.gov.uk/Notice/067905-2025
23rd October 2025 - Contract change notice on Find a Tender -
https://www.find-tender.service.gov.uk/Notice/059819-2025
25th September 2025 - Contract change notice on Find a Tender -
https://www.find-tender.service.gov.uk/Notice/037727-2025
7th July 2025 - Contract change notice on Find a Tender -
https://www.find-tender.service.gov.uk/Notice/037721-2025
7th July 2025 - Contract details notice on Find a Tender -
https://www.find-tender.service.gov.uk/Notice/037706-2025
7th July 2025 - Contract change notice on Find a Tender -
https://www.find-tender.service.gov.uk/Notice/020939-2025
13th May 2025 - Contract details notice on Find a Tender -
https://www.find-tender.service.gov.uk/Notice/014323-2025
10th April 2025 - Contract award notice on Find a Tender -
https://www.find-tender.service.gov.uk/Notice/010855-2025
24th March 2025 - Transparency notice on Find a Tender
Open Contracting Data Standard (OCDS)
View full OCDS Record for this contracting process
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.
{
"tag": [
"compiled"
],
"id": "ocds-h6vhtk-04f7c8-2025-11-11T11:37:52Z",
"date": "2025-11-11T11:37:52Z",
"ocid": "ocds-h6vhtk-04f7c8",
"initiationType": "tender",
"parties": [
{
"id": "GB-PPON-PPWG-8368-RJMG",
"name": "Defence Infrastructure Organisation",
"identifier": {
"scheme": "GB-PPON",
"id": "PPWG-8368-RJMG"
},
"address": {
"streetAddress": "St George's House, DMS Whittington",
"locality": "Lichfield",
"postalCode": "WS149PY",
"country": "GB",
"countryName": "United Kingdom",
"region": "UKG24"
},
"contactPoint": {
"email": "DIOComrcl-EnSer@mod.gov.uk"
},
"roles": [
"buyer"
],
"details": {
"classifications": [
{
"scheme": "UK_CA_TYPE",
"id": "publicAuthorityCentralGovernment",
"description": "Public authority - central government"
}
]
}
},
{
"id": "GB-COH-02785280",
"name": "ThinkIdea Limited",
"identifier": {
"scheme": "GB-COH",
"id": "02785280"
},
"address": {
"streetAddress": "The Mill",
"locality": "Shrewsbury",
"postalCode": "SY5 7PZ",
"country": "GB",
"countryName": "United Kingdom",
"region": "UKG22"
},
"contactPoint": {
"email": "info@idea.eu"
},
"roles": [
"supplier"
],
"details": {
"scale": "sme",
"vcse": false,
"publicServiceMissionOrganization": false,
"shelteredWorkshop": false
}
},
{
"id": "GB-PPON-PYZW-6271-PLPJ",
"name": "ThinkIdea Limited",
"identifier": {
"scheme": "GB-PPON",
"id": "PYZW-6271-PLPJ"
},
"address": {
"streetAddress": "The Mill, Longnor",
"locality": "Shrewsbury",
"postalCode": "SY5 7PZ",
"country": "GB",
"countryName": "United Kingdom",
"region": "UKG22"
},
"contactPoint": {
"email": "info@idea.eu"
},
"roles": [
"supplier"
],
"details": {
"scale": "sme",
"vcse": false,
"publicServiceMissionOrganization": false,
"shelteredWorkshop": false
}
}
],
"buyer": {
"id": "GB-PPON-PPWG-8368-RJMG",
"name": "Defence Infrastructure Organisation"
},
"tender": {
"id": "714128451",
"legalBasis": {
"id": "2023/54",
"scheme": "UKPGA",
"uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents"
},
"title": "UK7 - Contract Details Notice",
"description": "The DIO has an Estate Lens Model under development. This Model provides analysis of the demand and supply for the entire MOD estate. The Model has been developed within the SAS system which allows data from various sources to be analysed. An interlinked model that provides scenario planning functionality is also in development. The Models require ongoing further stages of development to allow improved visualisation, improved maturity and to capture planned and aspirational changes.",
"status": "complete",
"procurementMethod": "direct",
"procurementMethodDetails": "Direct award",
"procurementMethodRationale": "The MOD has a strategic objective to improve its Asset Management in particular demand management. One of the workstreams within this is the development of its understanding of the supply and demand of its estate. The Estate Lens Model has been developed over the past four years by the MOD in conjunction with a SME Supplier that specialises in infrastructure demand and space management. Surveys have been undertaken to test the validity of the Model. The Estate Lens Model is now fed by automated links to other MOD datasets. It is anticipated that further live links to key (but not all) MOD datasets will be achieved this coming calendar year. Further development work is required on an ongoing basis to develop the modelling and embed scenario planning so that we can move from understanding the current position to modelling future scenarios. The MOD wishes to develop its understanding of the trajectory for the Defence Estate and also to develop the Estates Lens modelling tools. We want to be able to move towards being able to devolve supply and demand to site level having provided strategic level analysis and direction. The extension of existing services provided by Think Idea is required because this is a specialist demand planning and spatial analysis area where the Supplier has developed in collaboration with the DIO and MOD TLBs a bespoke Estate Lens modelling process (including adjacency planning) for MOD sites. The Estate Lens is a unique system that has been developed over the last 4 years with the Supplier and regular engagement with DIO Estate Strategy, DEX and other MOD TLBs. DIO project team estimate it would take a new Supplier at least six months to start to understand the architecture / nuances of the Estate Lens and what is required to further develop it. These enhancements should include 1) better presentation of data, 2) enhancement of maturity and calculations, 3) ability to plan for change and scenario change, 4) to include further MOD data sets, 5) bring in new functionality and 6) complete site surveys to assist in understanding the model and developing it further. To deliver this the existing Supplier has: SS expertise in the analytics and modelling of the demand and supply of estate. This should include understanding spatial and predictive (inc time series) modelling and analysis. SS expertise in Government and Military/Defence ways of working and estate use / management. be able to complete Project Management and Site Surveys. This should be in accordance with DIO ways of working namely in an agile environment. have Agile Software Designers and Developers (as the Estate Lens Model and Scenario Planning Tool are bespoke to MOD) capable of developing Beta or Live models. be able to complete Agile Software Development of the Estate Lens Model and Scenario Planning Tool be specialists in working with Government Digital Design and Services guidelines and best practices. The Authority considers that a change in supplier would incur disproportionate expense and delay (of at least six months) whilst a new Supplier started to understand the current Estate Lens maturity and future development requirement. There are disproportionate risks associated with this. The Defence Infrastructure Organisation, on behalf of the Secretary of State for Defence (the \"Authority\"), intends to place a 2-year (second year being an Option) contract with Think Idea Limited, to complete the next phase of the Estate Lens development. As a covered procurement, it is considered that the direct award of the contract is lawful in accordance with Section 41(1) and Paragraph 7 of Schedule 5 of the Procurement Act 2023. The extension of existing services provided by Think Idea is required because introducing a new Supplier at this stage of the project will introduce disproportionate risks and costs whilst any new Supplier is procured and then learns the idiosyncrasies of the model. The professional estimate is that any newly introduced Supplier could take up to six months to reach operational effectiveness.",
"lots": [
{
"id": "1",
"status": "complete",
"suitability": {
"sme": true
}
}
],
"documents": [
{
"id": "conflictOfInterest",
"documentType": "conflictOfInterest",
"description": "Not published"
}
],
"procurementMethodRationaleClassifications": [
{
"id": "singleSuppliersTechnicalReasons"
}
]
},
"awards": [
{
"id": "1",
"title": "DIO Estate Lens Enhancements 2025-27 with Option Year 26-27",
"status": "active",
"value": {
"amountGross": 959808,
"amount": 799840,
"currency": "GBP"
},
"mainProcurementCategory": "services",
"aboveThreshold": true,
"suppliers": [
{
"id": "GB-COH-02785280",
"name": "ThinkIdea Limited"
},
{
"id": "GB-PPON-PYZW-6271-PLPJ",
"name": "ThinkIdea Limited"
}
],
"items": [
{
"id": "1",
"additionalClassifications": [
{
"scheme": "CPV",
"id": "70112000",
"description": "Development of non-residential real estate"
}
],
"relatedLot": "1"
}
],
"contractPeriod": {
"startDate": "2025-04-25T00:00:00+01:00",
"endDate": "2027-03-31T23:59:59+01:00"
},
"hasOptions": true,
"options": {
"description": "Option Year Two"
},
"relatedLots": [
"1"
],
"documents": [
{
"id": "010855-2025",
"documentType": "awardNotice",
"noticeType": "UK5",
"description": "Transparency notice on Find a Tender",
"url": "https://www.find-tender.service.gov.uk/Notice/010855-2025",
"datePublished": "2025-03-24T11:06:22Z",
"format": "text/html"
},
{
"id": "014323-2025",
"documentType": "awardNotice",
"noticeType": "UK6",
"description": "Contract award notice on Find a Tender",
"url": "https://www.find-tender.service.gov.uk/Notice/014323-2025",
"datePublished": "2025-04-10T14:25:30+01:00",
"format": "text/html"
}
],
"milestones": [
{
"id": "1",
"type": "futureSignatureDate",
"dueDate": "2025-04-24T23:59:59+01:00",
"status": "scheduled"
}
],
"date": "2025-04-09T00:00:00+01:00",
"standstillPeriod": {
"endDate": "2025-04-23T23:59:59+01:00"
}
}
],
"language": "en",
"contracts": [
{
"id": "1",
"awardID": "1",
"status": "active",
"period": {
"startDate": "2025-05-01T00:00:00+01:00",
"endDate": "2026-03-31T23:59:59+01:00"
},
"hasOptions": true,
"options": {
"description": "Option Year 1 April 2026 to 31 March 2027. This may or may not be taken up, that Contrac value includes the Option Year value, which is PS400,000.00 ex vat."
},
"value": {
"amountGross": 959808,
"amount": 799840,
"currency": "GBP"
},
"aboveThreshold": true,
"dateSigned": "2025-04-29T00:00:00+01:00",
"agreedMetrics": [
{
"id": "1",
"title": "Completion of Estate Lens Model and Agreement on Outputs"
},
{
"id": "2",
"title": "Completion of Indivual Project Plans for each individual output"
},
{
"id": "3",
"title": "Completion of each Estate Lens Output"
},
{
"id": "4",
"title": "Social Value Theme 4 - Equal Opportunity",
"description": "Encorage Job Applications from Ex Forces"
},
{
"id": "5",
"title": "Social Value Theme 4 - Equal Opportunity",
"description": "Recruitment and Promotion Process using Blind CV's to encourage diadvantage groups"
},
{
"id": "6",
"title": "Social Value Theme 4 - Equal Opportunity",
"description": "Continued Professional Development"
},
{
"id": "7",
"title": "Social Value Theme 4 - Equal Opportunity",
"description": "Work Placements - Career Ready Programme"
}
],
"documents": [
{
"id": "020939-2025",
"documentType": "contractNotice",
"noticeType": "UK7",
"description": "Contract details notice on Find a Tender",
"url": "https://www.find-tender.service.gov.uk/Notice/020939-2025",
"datePublished": "2025-05-13T15:49:59+01:00",
"format": "text/html"
},
{
"id": "037706-2025",
"documentType": "contractNotice",
"noticeType": "UK10",
"description": "Contract change notice on Find a Tender",
"url": "https://www.find-tender.service.gov.uk/Notice/037706-2025",
"datePublished": "2025-07-07T11:46:06+01:00",
"format": "text/html"
},
{
"id": "037721-2025",
"documentType": "contractNotice",
"noticeType": "UK7",
"description": "Contract details notice on Find a Tender",
"url": "https://www.find-tender.service.gov.uk/Notice/037721-2025",
"datePublished": "2025-07-07T12:06:51+01:00",
"format": "text/html"
},
{
"id": "037727-2025",
"documentType": "contractNotice",
"noticeType": "UK10",
"description": "Contract change notice on Find a Tender",
"url": "https://www.find-tender.service.gov.uk/Notice/037727-2025",
"datePublished": "2025-07-07T12:16:27+01:00",
"format": "text/html"
},
{
"id": "059819-2025",
"documentType": "contractNotice",
"noticeType": "UK10",
"description": "Contract change notice on Find a Tender",
"url": "https://www.find-tender.service.gov.uk/Notice/059819-2025",
"datePublished": "2025-09-25T15:54:14+01:00",
"format": "text/html"
},
{
"id": "067905-2025",
"documentType": "contractNotice",
"noticeType": "UK10",
"description": "Contract change notice on Find a Tender",
"url": "https://www.find-tender.service.gov.uk/Notice/067905-2025",
"datePublished": "2025-10-23T15:31:01+01:00",
"format": "text/html"
},
{
"id": "072722-2025",
"documentType": "contractNotice",
"noticeType": "UK10",
"description": "Contract change notice on Find a Tender",
"url": "https://www.find-tender.service.gov.uk/Notice/072722-2025",
"datePublished": "2025-11-11T11:37:52Z",
"format": "text/html"
}
],
"proposedAmendments": [
{
"id": "037706-2025",
"date": "2025-07-08T23:59:59+01:00",
"standstill": false,
"rationale": "Inject of funding to include The Royal College of Defence Studies, Seaford House, London, as part of the scope of works. This modification is less than 10% of original contract value.",
"rationaleClassifications": [
{
"id": "belowThresholdNotSubstantial"
}
],
"period": {
"startDate": "2025-07-09T00:00:00+01:00"
},
"value": {
"amountGross": 981295.2,
"amount": 817746,
"currency": "GBP"
},
"aboveThreshold": true
},
{
"id": "037727-2025",
"date": "2025-07-08T23:59:59+01:00",
"standstill": false,
"rationale": "Inject of funding to include The Royal College od Defence Studies, Seaford House, London, into the scope of work.",
"rationaleClassifications": [
{
"id": "belowThresholdNotSubstantial"
}
],
"period": {
"startDate": "2025-07-09T00:00:00+01:00"
},
"value": {
"amountGross": 981295.2,
"amount": 817746,
"currency": "GBP"
},
"aboveThreshold": true
},
{
"id": "059819-2025",
"date": "2025-10-13T23:59:59+01:00",
"standstill": true,
"rationale": "Inject of additional work within scope of the contract.",
"rationaleClassifications": [
{
"id": "additionalGoodsServicesWorks"
},
{
"id": "belowThresholdNotSubstantial"
}
],
"period": {
"startDate": "2025-10-14T00:00:00+01:00"
},
"value": {
"amountGross": 539455.2,
"amount": 449546,
"currency": "GBP"
},
"aboveThreshold": true
},
{
"id": "067905-2025",
"date": "2025-10-27T23:59:59+00:00",
"standstill": false,
"rationale": "To call off Additional services of works currently under the contract.",
"rationaleClassifications": [
{
"id": "additionalGoodsServicesWorks"
}
],
"value": {
"amountGross": 638247.6,
"amount": 531873,
"currency": "GBP"
},
"aboveThreshold": true,
"period": {
"startDate": "2025-10-27T23:59:59+00:00"
}
},
{
"id": "072722-2025",
"date": "2025-11-11T23:59:59+00:00",
"standstill": false,
"rationale": "Below Threshold modification to add additional services in line with the scope of the contract.",
"rationaleClassifications": [
{
"id": "additionalGoodsServicesWorks"
},
{
"id": "belowThresholdNotSubstantial"
}
],
"period": {
"startDate": "2025-11-12T00:00:00+00:00"
},
"value": {
"amountGross": 646325.6,
"amount": 538605,
"currency": "GBP"
},
"aboveThreshold": true
}
]
}
]
}