Notice Information
Notice Title
Asset Delivery (AD) Area 14 Maintenance & Response (M&R) Contract
Notice Description
This VEAT Notice relates to a Deed of Variation to a National Highways' Maintenance and Response Contract. This Contract currently provides and undertakes all cyclical and reactive maintenance, incident response, defect rectification and severe weather delivery on the trunk roads and motorways within Northumberland, Tyne and Wear, County Durham, North Yorkshire (National Highways Area 14) (the "Contract"). Duties also include maintenance of roadside technology, the provision of traffic management for the contractor, maintenance and incident response activities, and traffic management for others who may be working on the network. The variation will add the eastern section of the A69 from the Cumbria/Northumberland County boundary and the A19 Dishforth to Tyne Tunnel into the Contract which is currently maintained under a Design Build Finance & Operate ("DBFO") contract which are due to expire on 31 March 2026 and 23 February 2027. Consequently the total value of the Contract will increase by approximately 26%. It will also shorten the Contract which will have a new end date of 1 June 2028 instead of 31 March 2032 in order to align with the procurement process for the next Maintenance & Response contracts.
Lot Information
Lot 1
A Design Build Finance Operate (DBFO) contract covers Section of A69 from Northumberland county boundary. National Highways therefore must appoint an alternative maintenance contractor and it considers that the scope of these works is already included within this existing Maintenance and Response Contract which is adjacent geographically. Therefore these roads will be incorporated into the existing Maintenance and Response (M&R) Contract for Area 14 of the Strategic Road Network following the award of the Deed of Variation. This together with the need for national alignment of the expiry dates for all of the M&R contracts, ready for their re-procurement, means that the term of the Area 14 Contract will be shortened and will have a new end date of 1st June 2028 instead of 31st March 2032. The new overall estimated Contract value will become PS 165,630,000.
Procurement Information
The modifications to the Contract fall within the permissible grounds set out under Regulation 72(1)(e) of the Public Contracts Regulations 2015 in that the modifications are not substantial within the meaning of Regulation 72(8) of the Public Contracts Regulations 2015 because: The inclusion of Design Build Finance and Operate (DBFO) roads into the Contract does not render the Contract materially different compared to when it was originally procured. The type of work originally required of the Contract (i.e. maintenance and response) is the same as that which it will carry out on the previous DBFO stretches of the Strategic Road Network, it is just a case that the total lane coverage to be maintained under the Contract increases. The updated estimated Contract Value is also within the original estimate set out in the Contract notice for the Contract. Adding the additional roads would not have changed the outcome of the original procurement in any way. The Contract will be fully operated in accordance with their current terms and pricing; As the current Contract will be operated for the new roads on the same terms and pricing, this does not alter the economic balance of the Contract in favour of the contractor; The change does not considerably alter the scope of the Contract as the works and services provided will remain unchanged and the roads have been included in this Contract because they are adjacent in terms of geographical scope also. Any increase in scope is also mitigated by a shortening in Contract term and in any event, the updated estimated Contract Value is also within the original estimate set out in the Contract notice for the Contract (which was PS503,075,685); This is not a change in contractor. In addition, National Highways also considers that the exemption at Regulation 72(1)(a) would apply to the addition of the DBFO stretch of the A69 as the work will be carried out in accordance with the Contract's current terms, on current pricing, in accordance with the existing change mechanism within it and the new Contract value will be within the original estimated Contract value. National Highways considers that 72(1)(b) would also apply. This permits additional services or supplies that have become necessary and were not included in the initial procurement where a change of contractor cannot be made for economic or technical reasons and another supplier/procurement would cause significant inconvenience or substantial duplication of costs for the contracting authority; and where any increase in price does not exceed 50% of the value of the original Contract. The Deed of Variation ensures continuity of service on the Strategic Road Network and aligns with National Highways' wider asset delivery and procurement strategy, thereby safeguarding public value and network integrity. The Contract is being shortened to better align with the re-procurement strategy for all Maintenance & Response contracts. It would provide significant technical difficulties and duplication of procurement costs for National Highways to procure a contractor simply for this short stretch of network given the current re-procurement strategy.
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-h6vhtk-0585b8
- Publication Source
- Find A Tender Service
- Latest Notice
- https://www.find-tender.service.gov.uk/Notice/047885-2025
- Current Stage
- Award
- All Stages
- Award
Procurement Classification
- Notice Type
- Award Notice
- Procurement Type
- Standard
- Procurement Category
- Works
- Procurement Method
- Limited
- Procurement Method Details
- Award procedure without prior publication of a call for competition
- Tender Suitability
- Not specified
- Awardee Scale
- Large
Common Procurement Vocabulary (CPV)
- CPV Divisions
45 - Construction work
71 - Architectural, construction, engineering and inspection services
-
- CPV Codes
45233130 - Construction work for highways
45233139 - Highway maintenance work
45233140 - Roadworks
45233141 - Road-maintenance works
45233210 - Surface work for highways
45310000 - Electrical installation work
71300000 - Engineering services
Notice Value(s)
- Tender Value
- Not specified
- Lots Value
- Not specified
- Awards Value
- Not specified
- Contracts Value
- £165,630,000 £100M-£1B
Notice Dates
- Publication Date
- 12 Aug 20256 months ago
- Submission Deadline
- Not specified
- Future Notice Date
- Not specified
- Award Date
- 31 Mar 20178 years ago
- Contract Period
- Not specified - Not specified
- Recurrence
- Not specified
Notice Status
- Tender Status
- Complete
- Lots Status
- Not Specified
- Awards Status
- Active
- Contracts Status
- Active
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- NATIONAL HIGHWAYS
- Contact Name
- Not specified
- Contact Email
- info@nationalhighways.co.uk
- Contact Phone
- +44 03001235000
Buyer Location
- Locality
- GUILDFORD
- Postcode
- GU1 4LZ
- Post Town
- Guildford
- Country
- England
-
- Major Region (ITL 1)
- TLJ South East (England)
- Basic Region (ITL 2)
- TLJ2 Surrey, East and West Sussex
- Small Region (ITL 3)
- TLJ25 West Surrey
- Delivery Location
- Not specified
-
- Local Authority
- Guildford
- Electoral Ward
- Stoke
- Westminster Constituency
- Guildford
Further Information
Open Contracting Data Standard (OCDS)
View full OCDS Record for this contracting process
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.
{
"tag": [
"compiled"
],
"id": "ocds-h6vhtk-0585b8-2025-08-12T10:06:33+01:00",
"date": "2025-08-12T10:06:33+01:00",
"ocid": "ocds-h6vhtk-0585b8",
"initiationType": "tender",
"tender": {
"id": "ocds-h6vhtk-0585b8",
"legalBasis": {
"id": "32014L0024",
"scheme": "CELEX"
},
"title": "Asset Delivery (AD) Area 14 Maintenance & Response (M&R) Contract",
"status": "complete",
"classification": {
"scheme": "CPV",
"id": "45233139",
"description": "Highway maintenance work"
},
"mainProcurementCategory": "works",
"description": "This VEAT Notice relates to a Deed of Variation to a National Highways' Maintenance and Response Contract. This Contract currently provides and undertakes all cyclical and reactive maintenance, incident response, defect rectification and severe weather delivery on the trunk roads and motorways within Northumberland, Tyne and Wear, County Durham, North Yorkshire (National Highways Area 14) (the \"Contract\"). Duties also include maintenance of roadside technology, the provision of traffic management for the contractor, maintenance and incident response activities, and traffic management for others who may be working on the network. The variation will add the eastern section of the A69 from the Cumbria/Northumberland County boundary and the A19 Dishforth to Tyne Tunnel into the Contract which is currently maintained under a Design Build Finance & Operate (\"DBFO\") contract which are due to expire on 31 March 2026 and 23 February 2027. Consequently the total value of the Contract will increase by approximately 26%. It will also shorten the Contract which will have a new end date of 1 June 2028 instead of 31 March 2032 in order to align with the procurement process for the next Maintenance & Response contracts.",
"lots": [
{
"id": "1",
"description": "A Design Build Finance Operate (DBFO) contract covers Section of A69 from Northumberland county boundary. National Highways therefore must appoint an alternative maintenance contractor and it considers that the scope of these works is already included within this existing Maintenance and Response Contract which is adjacent geographically. Therefore these roads will be incorporated into the existing Maintenance and Response (M&R) Contract for Area 14 of the Strategic Road Network following the award of the Deed of Variation. This together with the need for national alignment of the expiry dates for all of the M&R contracts, ready for their re-procurement, means that the term of the Area 14 Contract will be shortened and will have a new end date of 1st June 2028 instead of 31st March 2032. The new overall estimated Contract value will become PS 165,630,000.",
"hasOptions": false
}
],
"items": [
{
"id": "1",
"additionalClassifications": [
{
"scheme": "CPV",
"id": "45233130",
"description": "Construction work for highways"
},
{
"scheme": "CPV",
"id": "45233139",
"description": "Highway maintenance work"
},
{
"scheme": "CPV",
"id": "45233140",
"description": "Roadworks"
},
{
"scheme": "CPV",
"id": "45233141",
"description": "Road-maintenance works"
},
{
"scheme": "CPV",
"id": "45233210",
"description": "Surface work for highways"
},
{
"scheme": "CPV",
"id": "45310000",
"description": "Electrical installation work"
},
{
"scheme": "CPV",
"id": "71300000",
"description": "Engineering services"
}
],
"deliveryAddresses": [
{
"region": "UK"
}
],
"deliveryLocation": {
"description": "Northumberland, Tyne and Wear, County Durham, North Yorkshire"
},
"relatedLot": "1"
}
],
"procurementMethod": "limited",
"procurementMethodDetails": "Award procedure without prior publication of a call for competition",
"coveredBy": [
"GPA"
],
"procurementMethodRationaleClassifications": [
{
"scheme": "TED_PT_AWARD_CONTRACT_WITHOUT_CALL",
"id": "D_OUTSIDE_SCOPE",
"description": "The procurement falls outside the scope of application of the directive"
}
],
"procurementMethodRationale": "The modifications to the Contract fall within the permissible grounds set out under Regulation 72(1)(e) of the Public Contracts Regulations 2015 in that the modifications are not substantial within the meaning of Regulation 72(8) of the Public Contracts Regulations 2015 because: The inclusion of Design Build Finance and Operate (DBFO) roads into the Contract does not render the Contract materially different compared to when it was originally procured. The type of work originally required of the Contract (i.e. maintenance and response) is the same as that which it will carry out on the previous DBFO stretches of the Strategic Road Network, it is just a case that the total lane coverage to be maintained under the Contract increases. The updated estimated Contract Value is also within the original estimate set out in the Contract notice for the Contract. Adding the additional roads would not have changed the outcome of the original procurement in any way. The Contract will be fully operated in accordance with their current terms and pricing; As the current Contract will be operated for the new roads on the same terms and pricing, this does not alter the economic balance of the Contract in favour of the contractor; The change does not considerably alter the scope of the Contract as the works and services provided will remain unchanged and the roads have been included in this Contract because they are adjacent in terms of geographical scope also. Any increase in scope is also mitigated by a shortening in Contract term and in any event, the updated estimated Contract Value is also within the original estimate set out in the Contract notice for the Contract (which was PS503,075,685); This is not a change in contractor. In addition, National Highways also considers that the exemption at Regulation 72(1)(a) would apply to the addition of the DBFO stretch of the A69 as the work will be carried out in accordance with the Contract's current terms, on current pricing, in accordance with the existing change mechanism within it and the new Contract value will be within the original estimated Contract value. National Highways considers that 72(1)(b) would also apply. This permits additional services or supplies that have become necessary and were not included in the initial procurement where a change of contractor cannot be made for economic or technical reasons and another supplier/procurement would cause significant inconvenience or substantial duplication of costs for the contracting authority; and where any increase in price does not exceed 50% of the value of the original Contract. The Deed of Variation ensures continuity of service on the Strategic Road Network and aligns with National Highways' wider asset delivery and procurement strategy, thereby safeguarding public value and network integrity. The Contract is being shortened to better align with the re-procurement strategy for all Maintenance & Response contracts. It would provide significant technical difficulties and duplication of procurement costs for National Highways to procure a contractor simply for this short stretch of network given the current re-procurement strategy."
},
"awards": [
{
"id": "047885-2025-1",
"relatedLots": [
"1"
],
"status": "active",
"hasSubcontracting": true,
"suppliers": [
{
"id": "GB-FTS-157665",
"name": "CH2M HILL United Kingdom"
},
{
"id": "GB-FTS-157666",
"name": "Costain Limited"
}
]
}
],
"parties": [
{
"id": "GB-FTS-139911",
"name": "National Highways",
"identifier": {
"legalName": "National Highways"
},
"address": {
"streetAddress": "Bridge House, Walnut Tree Close",
"locality": "Guildford",
"region": "UK",
"postalCode": "GU1 4LZ",
"countryName": "United Kingdom"
},
"contactPoint": {
"telephone": "+44 03001235000",
"email": "info@nationalhighways.co.uk"
},
"roles": [
"buyer",
"reviewBody"
],
"details": {
"url": "http://www.nationalhighways.co.uk",
"classifications": [
{
"scheme": "TED_CA_TYPE",
"id": "NATIONAL_AGENCY",
"description": "National or federal agency/office"
},
{
"scheme": "COFOG",
"id": "01",
"description": "General public services"
}
]
}
},
{
"id": "GB-FTS-157665",
"name": "CH2M HILL United Kingdom",
"identifier": {
"legalName": "CH2M HILL United Kingdom"
},
"address": {
"locality": "London",
"region": "UK",
"postalCode": "W6 7EF",
"countryName": "United Kingdom"
},
"roles": [
"supplier"
],
"details": {
"scale": "large"
}
},
{
"id": "GB-FTS-157666",
"name": "Costain Limited",
"identifier": {
"legalName": "Costain Limited"
},
"address": {
"locality": "Maidenhead",
"region": "UK",
"postalCode": "SL6 4UB",
"countryName": "United Kingdom"
},
"roles": [
"supplier"
],
"details": {
"scale": "large"
}
}
],
"buyer": {
"id": "GB-FTS-139911",
"name": "National Highways"
},
"contracts": [
{
"id": "047885-2025-1",
"awardID": "047885-2025-1",
"status": "active",
"value": {
"amount": 165630000,
"currency": "GBP"
},
"dateSigned": "2017-04-01T00:00:00+01:00"
}
],
"links": [
{
"rel": "prev",
"href": "https://ted.europa.eu/udl?uri=TED:NOTICE:024945-2016:TEXT:EN:HTML"
}
],
"language": "en"
}