Notice Information
Notice Title
REPLACEMENT DISABLED ACCESS LIFT FOR SV GLENLEE (THE TALL SHIP GLENLEE)
Notice Description
The historic vessel, The Tall Ship Glenlee requires a replacement accessibility lift to be purchased and installed using funds from Museums Galleries Scotland Repair and Adaptation Fund. Contractor turnkey project requirement definition:- 1. Lift as presently configured with four access/ egress levels in weather deckhouse, 'tween decks, mezzanine deck, hold, DDA compliant. 2. Platform lift capable of carrying a minimum load of 450kg and have a capacity alternatively for 5 persons. 3. Power - single phase 220 V AC. 4. Capable of operation in up to 2 degrees of ship list and 1 degree change of fore and aft trim of ship. 5. Does not need to meet fire evacuation requirements. 6. Design must accommodate the limited pit depth of <150mm. 7. Meet or exceed 2006/42CE. 8. All works must comply with CDM regs. 9. Lift must be capable of a minimum of 20 operational cycles per hour. 10. Normal duty cycle is 8 hours per day with some operational days of up to 24 hours per day. 11. A five-year warranty on all parts and labour/ hours is required. 12. A five-year maintenance package is required. 13. A key control is required to avoid unauthorised operations. 14. Turnkey project for removal of all components of old lift installation and installation and commissioning of new lift. 15. All responsibility for measurements, design, removal of old equipment and materials arisings from site. 16. All transportation of equipment and materials, lifting and craneage are part of the turnkey contract. 17. All works must comply with relevant Health and Safety at Work Act requirements. 18. Insurance must be provided for a sum of GBP 10 million pounds for any one occurrence. 19. Product liability insurance in the sum of GBP 10 million pounds in the aggregate and professional indemnity insurance in the aggregate. Client site works: - Works on essential support steel substructures for lift in lower hull steelwork blasting inspection, any necessary strengthening and protective coating whilst old lift removed must be completed before new lift installation.
Lot Information
Lot 1
Contractor turnkey project requirement definition:- 1. Lift as presently configured with four access/ egress levels in weather deckhouse, 'tween decks, mezzanine deck, hold, DDA compliant. 2. Platform lift capable of carrying a minimum load of 450kg and have a capacity alternatively for 5 persons. 3. Power - single phase 220 V AC. 4. Capable of operation in up to 2 degrees of ship list and 1 degree change of fore and aft trim of ship. 5. Does not need to meet fire evacuation requirements. 6. Design must accommodate the limited pit depth of <150mm. 7. Meet or exceed 2006/42CE. 8. All works must comply with CDM regs. 9. Lift must be capable of a minimum of 20 operational cycles per hour. 10. Normal duty cycle is 8 hours per day with some operational days of up to 24 hours per day. 11. A five-year warranty on all parts and labour/ hours is required. 12. A five-year maintenance package is required. 13. A key control is required to avoid unauthorised operations. 14. Turnkey project for removal of all components of old lift installation and installation and commissioning of new lift. 15. All responsibility for measurements, design, removal of old equipment and materials arisings from site. 16. All transportation of equipment and materials, lifting and craneage are part of the turnkey contract. 17. All works must comply with relevant Health and Safety at Work Act requirements. 18. Insurance must be provided for a sum of GBP10 million pounds for any one occurrence. 19. Product liability insurance in the sum of GBP10 million pounds in the aggregate and professional indemnity insurance in the aggregate. Client site works: - Works on essential support steel substructures for lift in lower hull steelwork blasting inspection, any necessary strengthening and protective coating whilst old lift removed must be completed before new lift installation.
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-h6vhtk-05f7ca
- Publication Source
- Find A Tender Service
- Latest Notice
- https://www.find-tender.service.gov.uk/Notice/003536-2026
- Current Stage
- Tender
- All Stages
- Tender
Procurement Classification
- Notice Type
- Tender Notice
- Procurement Type
- Standard
- Procurement Category
- Goods
- Procurement Method
- Open
- Procurement Method Details
- Open procedure
- Tender Suitability
- Not specified
- Awardee Scale
- Not specified
Common Procurement Vocabulary (CPV)
- CPV Divisions
42 - Industrial machinery
-
- CPV Codes
42416000 - Lifts, skip hoists, hoists, escalators and moving walkways
42416100 - Lifts
42416120 - Goods lifts
42416130 - Mechanical lifts
42417000 - Elevators and conveyors
42419510 - Parts of lifts
Notice Value(s)
- Tender Value
- £70,000 Under £100K
- Lots Value
- £70,000 Under £100K
- Awards Value
- Not specified
- Contracts Value
- Not specified
Notice Dates
- Publication Date
- 15 Jan 20264 days ago
- Submission Deadline
- 16 Jan 2026Expired
- Future Notice Date
- Not specified
- Award Date
- Not specified
- Contract Period
- 30 Jan 2026 - 13 Mar 2026 1-6 months
- Recurrence
- Not specified
Notice Status
- Tender Status
- Active
- Lots Status
- Active
- Awards Status
- Not Specified
- Contracts Status
- Not Specified
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- THE TALL SHIP GLENLEE TRUST
- Contact Name
- Fiona Greer
- Contact Email
- fiona.greer@thetallship.com
- Contact Phone
- +44 1413573699
Buyer Location
- Locality
- GLASGOW
- Postcode
- G3 8RS
- Post Town
- Glasgow
- Country
- Scotland
-
- Major Region (ITL 1)
- TLM Scotland
- Basic Region (ITL 2)
- TLM3 West Central Scotland
- Small Region (ITL 3)
- TLM32 Glasgow City
- Delivery Location
- TLM82 Glasgow City
-
- Local Authority
- Glasgow City
- Electoral Ward
- Anderston/City/Yorkhill
- Westminster Constituency
- Glasgow North
Further Information
Open Contracting Data Standard (OCDS)
View full OCDS Record for this contracting process
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.
{
"tag": [
"compiled"
],
"id": "ocds-h6vhtk-05f7ca-2026-01-15T14:22:41Z",
"date": "2026-01-15T14:22:41Z",
"ocid": "ocds-h6vhtk-05f7ca",
"description": "NOTE: To register your interest in this notice and obtain any additional information please visit the Public Contracts Scotland Web Site at https://www.publiccontractsscotland.gov.uk/Search/Search_Switch.aspx?ID=818861. (SC Ref:818861)",
"initiationType": "tender",
"tender": {
"id": "ocds-h6vhtk-05f7ca",
"legalBasis": {
"id": "32014L0024",
"scheme": "CELEX"
},
"title": "REPLACEMENT DISABLED ACCESS LIFT FOR SV GLENLEE (THE TALL SHIP GLENLEE)",
"status": "active",
"classification": {
"scheme": "CPV",
"id": "42416100",
"description": "Lifts"
},
"mainProcurementCategory": "goods",
"description": "The historic vessel, The Tall Ship Glenlee requires a replacement accessibility lift to be purchased and installed using funds from Museums Galleries Scotland Repair and Adaptation Fund. Contractor turnkey project requirement definition:- 1. Lift as presently configured with four access/ egress levels in weather deckhouse, 'tween decks, mezzanine deck, hold, DDA compliant. 2. Platform lift capable of carrying a minimum load of 450kg and have a capacity alternatively for 5 persons. 3. Power - single phase 220 V AC. 4. Capable of operation in up to 2 degrees of ship list and 1 degree change of fore and aft trim of ship. 5. Does not need to meet fire evacuation requirements. 6. Design must accommodate the limited pit depth of <150mm. 7. Meet or exceed 2006/42CE. 8. All works must comply with CDM regs. 9. Lift must be capable of a minimum of 20 operational cycles per hour. 10. Normal duty cycle is 8 hours per day with some operational days of up to 24 hours per day. 11. A five-year warranty on all parts and labour/ hours is required. 12. A five-year maintenance package is required. 13. A key control is required to avoid unauthorised operations. 14. Turnkey project for removal of all components of old lift installation and installation and commissioning of new lift. 15. All responsibility for measurements, design, removal of old equipment and materials arisings from site. 16. All transportation of equipment and materials, lifting and craneage are part of the turnkey contract. 17. All works must comply with relevant Health and Safety at Work Act requirements. 18. Insurance must be provided for a sum of GBP 10 million pounds for any one occurrence. 19. Product liability insurance in the sum of GBP 10 million pounds in the aggregate and professional indemnity insurance in the aggregate. Client site works: - Works on essential support steel substructures for lift in lower hull steelwork blasting inspection, any necessary strengthening and protective coating whilst old lift removed must be completed before new lift installation.",
"value": {
"amount": 70000,
"currency": "GBP"
},
"lots": [
{
"id": "1",
"description": "Contractor turnkey project requirement definition:- 1. Lift as presently configured with four access/ egress levels in weather deckhouse, 'tween decks, mezzanine deck, hold, DDA compliant. 2. Platform lift capable of carrying a minimum load of 450kg and have a capacity alternatively for 5 persons. 3. Power - single phase 220 V AC. 4. Capable of operation in up to 2 degrees of ship list and 1 degree change of fore and aft trim of ship. 5. Does not need to meet fire evacuation requirements. 6. Design must accommodate the limited pit depth of <150mm. 7. Meet or exceed 2006/42CE. 8. All works must comply with CDM regs. 9. Lift must be capable of a minimum of 20 operational cycles per hour. 10. Normal duty cycle is 8 hours per day with some operational days of up to 24 hours per day. 11. A five-year warranty on all parts and labour/ hours is required. 12. A five-year maintenance package is required. 13. A key control is required to avoid unauthorised operations. 14. Turnkey project for removal of all components of old lift installation and installation and commissioning of new lift. 15. All responsibility for measurements, design, removal of old equipment and materials arisings from site. 16. All transportation of equipment and materials, lifting and craneage are part of the turnkey contract. 17. All works must comply with relevant Health and Safety at Work Act requirements. 18. Insurance must be provided for a sum of GBP10 million pounds for any one occurrence. 19. Product liability insurance in the sum of GBP10 million pounds in the aggregate and professional indemnity insurance in the aggregate. Client site works: - Works on essential support steel substructures for lift in lower hull steelwork blasting inspection, any necessary strengthening and protective coating whilst old lift removed must be completed before new lift installation.",
"awardCriteria": {
"criteria": [
{
"name": "Quality",
"type": "quality",
"description": "20"
},
{
"name": "Performance Criteria - Timely completion of project to meet funding requirements",
"type": "quality",
"description": "20"
},
{
"type": "price",
"description": "20"
}
]
},
"value": {
"amount": 70000,
"currency": "GBP"
},
"contractPeriod": {
"startDate": "2026-01-30T00:00:00Z",
"endDate": "2026-03-13T23:59:59Z"
},
"hasRenewal": false,
"submissionTerms": {
"variantPolicy": "notAllowed"
},
"hasOptions": false,
"status": "active"
}
],
"items": [
{
"id": "1",
"additionalClassifications": [
{
"scheme": "CPV",
"id": "42416000",
"description": "Lifts, skip hoists, hoists, escalators and moving walkways"
},
{
"scheme": "CPV",
"id": "42416100",
"description": "Lifts"
},
{
"scheme": "CPV",
"id": "42416120",
"description": "Goods lifts"
},
{
"scheme": "CPV",
"id": "42416130",
"description": "Mechanical lifts"
},
{
"scheme": "CPV",
"id": "42419510",
"description": "Parts of lifts"
},
{
"scheme": "CPV",
"id": "42417000",
"description": "Elevators and conveyors"
}
],
"deliveryAddresses": [
{
"region": "UKM82"
}
],
"deliveryLocation": {
"description": "The Tall Ship Glenlee, 150 Pointhouse Place, Glasgow, G3 8RS"
},
"relatedLot": "1"
}
],
"submissionMethod": [
"electronicSubmission",
"written"
],
"submissionMethodDetails": "http://www.thetallship.com",
"procurementMethod": "open",
"procurementMethodDetails": "Open procedure",
"procedure": {
"isAccelerated": true,
"acceleratedRationale": "We are ok with 15 days"
},
"coveredBy": [
"GPA"
],
"tenderPeriod": {
"endDate": "2026-01-16T12:00:00Z"
},
"submissionTerms": {
"languages": [
"en"
],
"bidValidityPeriod": {
"endDate": "2026-02-16T23:59:59Z"
}
},
"awardPeriod": {
"startDate": "2026-01-23T12:00:00Z"
},
"bidOpening": {
"date": "2026-01-23T12:00:00Z"
},
"hasRecurrence": false,
"amendments": [
{
"id": "1",
"unstructuredChanges": [
{
"oldValue": {
"date": "2026-01-16T12:00:00Z"
},
"newValue": {
"date": "2026-01-23T12:00:00Z"
},
"where": {
"section": "IV.2.2",
"label": "Time limit"
}
},
{
"oldValue": {
"date": "2026-01-30"
},
"newValue": {
"date": "2026-02-06"
},
"where": {
"section": "II.2.7",
"label": "Duration Start"
}
},
{
"oldValue": {
"date": "2026-03-13"
},
"newValue": {
"date": "2026-03-20"
},
"where": {
"section": "II.2.7",
"label": "Duration End"
}
},
{
"oldValue": {
"date": "2026-02-16"
},
"newValue": {
"date": "2026-02-23"
},
"where": {
"section": "IV.2.6",
"label": "Minimum time frame during which the tenderer must maintain the tender"
}
},
{
"oldValue": {
"date": "2026-01-23T12:00:00Z"
},
"newValue": {
"date": "2026-01-30T12:00:00Z"
},
"where": {
"section": "IV.2.7",
"label": "Conditions for opening of tenders"
}
}
],
"description": "No notes of interest so far"
}
]
},
"parties": [
{
"id": "GB-FTS-169469",
"name": "The Tall Ship Glenlee Trust",
"identifier": {
"legalName": "The Tall Ship Glenlee Trust"
},
"address": {
"streetAddress": "150 Pointhouse Place",
"locality": "Glasgow",
"region": "UK",
"postalCode": "G3 8RS",
"countryName": "United Kingdom"
},
"contactPoint": {
"name": "Fiona Greer",
"telephone": "+44 1413573699",
"email": "fiona.greer@thetallship.com",
"url": "http://www.thetallship.com"
},
"roles": [
"buyer"
],
"details": {
"url": "http://www.thetallship.com",
"buyerProfile": "https://www.publiccontractsscotland.gov.uk/search/Search_AuthProfile.aspx?ID=AA30775",
"classifications": [
{
"scheme": "TED_CA_TYPE",
"description": "Registered charity"
},
{
"id": "08",
"scheme": "COFOG",
"description": "Recreation, culture and religion"
}
]
}
},
{
"id": "GB-FTS-2494",
"name": "Glasgow Sheriff Court and Justice of the Peace Court",
"identifier": {
"legalName": "Glasgow Sheriff Court and Justice of the Peace Court"
},
"address": {
"locality": "Glasgow",
"countryName": "United Kingdom"
},
"roles": [
"reviewBody"
]
}
],
"buyer": {
"id": "GB-FTS-169469",
"name": "The Tall Ship Glenlee Trust"
},
"links": [
{
"rel": "canonical",
"href": "https://api.publiccontractsscotland.gov.uk/v1/Notice?id=ocds-r6ebe6-0000818861"
},
{
"rel": "canonical",
"href": "https://api.publiccontractsscotland.gov.uk/v1/Notice?id=ocds-r6ebe6-0000818861"
}
],
"language": "en"
}