Notice Information
Notice Title
Kidlington Waste Removal
Notice Description
This contract has been directly awarded under the extreme urgency provisions, as set out in the Transparency Notice published on 6 January 2026 and in the Direct Award Justification of this notice, to mitigate a significant fire risk at the Kidlington waste site identified by Oxfordshire Fire and Rescue Service. A fire at this location would have serious consequences for public safety, including air quality impacts from smoke, disruption to critical infrastructure such as the A34 major highway, and risks to the local environment. The contract covers the full end-to-end clearance of approximately 21,000 tonnes of illegally deposited mixed waste at the site. This includes establishing, maintaining, and removing site facilities and access arrangements; testing, removing and disposing of all waste material at appropriately permitted facilities (including all required waste-transfer documentation); managing site leachate; managing odour; and providing site security throughout the works. The contract will commence on 19 January 2026. The contract's initial duration will align with the completion date set out in the first Accepted Programme of the ECC, which is 12th June 2026. The works will then be subject to a 12-month defects period. The authority may extend the contract to reflect any changes to the completion date under the Accepted Programme. The target cost for the works is PS6,084,563.52. Under the NEC Option C contract model, any changes to this target cost will be managed through the compensation-event process clearly set out in the ECC. Adjustments to the contract value or contract duration will only occur where compensation events are assessed and agreed in accordance with the contract conditions.
Procurement Information
Approximately 21,000 tonnes of mixed waste have been illegally deposited at the site. Independent advice from Oxfordshire Fire and Rescue Service (OFRS) confirms a rapidly increasing fire risk, driven by the volume and composition of the waste, the limited ability to safely access and control a fire if one were to start, and the lack of viable options to contain or manage firewater. A fire at this location would have a severe impact; including: * Lead to the closure of the A34, a major transport corridor between the South coast and the Midlands * Disrupt emergency services, local utilities and essential services * Cause pollution to the River Cherwell, which would impact on public water abstraction downstream on the River Thames and surrounding environment * Produce significant smoke affecting nearby communities These serious risks require immediate intervention to protect public safety, the environment and critical infrastructure because of the increasing risk of spontaneous combustion of the waste and the inability for the OFRS to access the site and tackle any fire. Work needs to start immediately not only to remove the fire risk but also to avoid the upcoming bird nesting season which could impact on site clearance works. The use of the extreme and unavoidable urgency provision is justified because: * The situation could not reasonably have been foreseen, arising from an unexpected significant increase in the likelihood of spontaneous combustion at the site identified by OFRS in December. * The urgency is not attributable to the contracting authority. EA does not clear illegal waste sites, such as this site at Kidlington, except in exceptional circumstances. The decision to clear this site was based on the exceptional circumstances created by the rapidly escalating fire and environmental risks . * The time limits for any competitive procurement procedure cannot be met without creating unacceptable risk to people, the environment, and critical infrastructure.
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-h6vhtk-060042
- Publication Source
- Find A Tender Service
- Latest Notice
- https://www.find-tender.service.gov.uk/Notice/009313-2026
- Current Stage
- Award
- All Stages
- Award
Procurement Classification
- Notice Type
- UK7 - Contract Details Notice
- Procurement Type
- Standard
- Procurement Category
- Services
- Procurement Method
- Direct
- Procurement Method Details
- Direct award
- Tender Suitability
- SME
- Awardee Scale
- SME
Common Procurement Vocabulary (CPV)
- CPV Divisions
90 - Sewage, refuse, cleaning and environmental services
-
- CPV Codes
90500000 - Refuse and waste related services
Notice Value(s)
- Tender Value
- Not specified
- Lots Value
- Not specified
- Awards Value
- £6,084,563 £1M-£10M
- Contracts Value
- £6,084,563 £1M-£10M
Notice Dates
- Publication Date
- 3 Feb 20262 weeks ago
- Submission Deadline
- Not specified
- Future Notice Date
- Not specified
- Award Date
- 6 Jan 20261 months ago
- Contract Period
- 20 Jan 2026 - 12 Jun 2027 1-2 years
- Recurrence
- Not specified
Notice Status
- Tender Status
- Complete
- Lots Status
- Complete
- Awards Status
- Active
- Contracts Status
- Active
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- ENVIRONMENT AGENCY
- Additional Buyers
- Contact Name
- Defra group Commercial
- Contact Email
- procurement@defra.gov.uk
- Contact Phone
- 03459335577
Buyer Location
- Locality
- LONDON
- Postcode
- SW1P 4DF
- Post Town
- South West London
- Country
- England
-
- Major Region (ITL 1)
- TLI London
- Basic Region (ITL 2)
- TLI3 Inner London - West
- Small Region (ITL 3)
- TLI35 Westminster and City of London
- Delivery Location
- Not specified
-
- Local Authority
- Westminster
- Electoral Ward
- St James's
- Westminster Constituency
- Cities of London and Westminster
Further Information
Notice Documents
-
https://www.find-tender.service.gov.uk/Notice/009313-2026
3rd February 2026 - Contract details notice on Find a Tender -
https://www.find-tender.service.gov.uk/Notice/004542-2026
19th January 2026 - Contract award notice on Find a Tender -
https://www.find-tender.service.gov.uk/Notice/000755-2026
6th January 2026 - Transparency notice on Find a Tender
Open Contracting Data Standard (OCDS)
View full OCDS Record for this contracting process
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.
{
"tag": [
"compiled"
],
"id": "ocds-h6vhtk-060042-2026-02-03T10:17:41Z",
"date": "2026-02-03T10:17:41Z",
"ocid": "ocds-h6vhtk-060042",
"initiationType": "tender",
"parties": [
{
"id": "GB-PPON-PNWW-1475-NYLN",
"name": "ENVIRONMENT AGENCY",
"identifier": {
"scheme": "GB-PPON",
"id": "PNWW-1475-NYLN"
},
"address": {
"streetAddress": "Seacole Building, 2 Marsham Street",
"locality": "London",
"postalCode": "SW1P 4DF",
"country": "GB",
"countryName": "United Kingdom",
"region": "UKI32"
},
"contactPoint": {
"email": "procurement@defra.gov.uk",
"telephone": "03459335577",
"name": "Defra group Commercial"
},
"roles": [
"buyer"
],
"details": {
"url": "https://defra-family.force.com/s/Welcome",
"classifications": [
{
"id": "publicAuthoritySubCentralGovernment",
"scheme": "UK_CA_TYPE",
"description": "Public authority - sub-central government"
}
]
}
},
{
"id": "GB-PPON-PNBD-3289-CDGX",
"name": "DEPARTMENT FOR ENVIRONMENT, FOOD AND RURAL AFFAIRS",
"identifier": {
"scheme": "GB-PPON",
"id": "PNBD-3289-CDGX"
},
"address": {
"streetAddress": "Seacole Building, 2 Marsham Street",
"locality": "London",
"postalCode": "SW1P 4DF",
"country": "GB",
"countryName": "United Kingdom",
"region": "UKI32"
},
"contactPoint": {
"email": "procurement@defra.gov.uk",
"telephone": "03459335577",
"name": "Defra group Commercial"
},
"roles": [
"procuringEntity"
],
"roleDetails": "Procurement Lead",
"details": {
"url": "https://defra-family.force.com/s/Welcome"
}
},
{
"id": "GB-PPON-PPLQ-9621-JRQL",
"name": "Acumen Waste Services Limited",
"identifier": {
"scheme": "GB-PPON",
"id": "PPLQ-9621-JRQL"
},
"address": {
"streetAddress": "Acumen House, Headlands Lane",
"locality": "Knottingley",
"postalCode": "WF11 0LA",
"country": "GB",
"countryName": "United Kingdom",
"region": "UKE45"
},
"contactPoint": {
"email": "info@acumenwaste.co.uk"
},
"roles": [
"supplier"
],
"details": {
"scale": "sme",
"vcse": false,
"publicServiceMissionOrganization": false,
"shelteredWorkshop": false
}
}
],
"buyer": {
"id": "GB-PPON-PNWW-1475-NYLN",
"name": "ENVIRONMENT AGENCY"
},
"tender": {
"id": "C32552",
"legalBasis": {
"id": "2023/54",
"scheme": "UKPGA",
"uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents"
},
"title": "Kidlington Waste Removal",
"description": "This contract has been directly awarded under the extreme urgency provisions, as set out in the Transparency Notice published on 6 January 2026 and in the Direct Award Justification of this notice, to mitigate a significant fire risk at the Kidlington waste site identified by Oxfordshire Fire and Rescue Service. A fire at this location would have serious consequences for public safety, including air quality impacts from smoke, disruption to critical infrastructure such as the A34 major highway, and risks to the local environment. The contract covers the full end-to-end clearance of approximately 21,000 tonnes of illegally deposited mixed waste at the site. This includes establishing, maintaining, and removing site facilities and access arrangements; testing, removing and disposing of all waste material at appropriately permitted facilities (including all required waste-transfer documentation); managing site leachate; managing odour; and providing site security throughout the works. The contract will commence on 19 January 2026. The contract's initial duration will align with the completion date set out in the first Accepted Programme of the ECC, which is 12th June 2026. The works will then be subject to a 12-month defects period. The authority may extend the contract to reflect any changes to the completion date under the Accepted Programme. The target cost for the works is PS6,084,563.52. Under the NEC Option C contract model, any changes to this target cost will be managed through the compensation-event process clearly set out in the ECC. Adjustments to the contract value or contract duration will only occur where compensation events are assessed and agreed in accordance with the contract conditions.",
"status": "complete",
"procurementMethod": "direct",
"procurementMethodDetails": "Direct award",
"procurementMethodRationale": "Approximately 21,000 tonnes of mixed waste have been illegally deposited at the site. Independent advice from Oxfordshire Fire and Rescue Service (OFRS) confirms a rapidly increasing fire risk, driven by the volume and composition of the waste, the limited ability to safely access and control a fire if one were to start, and the lack of viable options to contain or manage firewater. A fire at this location would have a severe impact; including: * Lead to the closure of the A34, a major transport corridor between the South coast and the Midlands * Disrupt emergency services, local utilities and essential services * Cause pollution to the River Cherwell, which would impact on public water abstraction downstream on the River Thames and surrounding environment * Produce significant smoke affecting nearby communities These serious risks require immediate intervention to protect public safety, the environment and critical infrastructure because of the increasing risk of spontaneous combustion of the waste and the inability for the OFRS to access the site and tackle any fire. Work needs to start immediately not only to remove the fire risk but also to avoid the upcoming bird nesting season which could impact on site clearance works. The use of the extreme and unavoidable urgency provision is justified because: * The situation could not reasonably have been foreseen, arising from an unexpected significant increase in the likelihood of spontaneous combustion at the site identified by OFRS in December. * The urgency is not attributable to the contracting authority. EA does not clear illegal waste sites, such as this site at Kidlington, except in exceptional circumstances. The decision to clear this site was based on the exceptional circumstances created by the rapidly escalating fire and environmental risks . * The time limits for any competitive procurement procedure cannot be met without creating unacceptable risk to people, the environment, and critical infrastructure.",
"lots": [
{
"id": "1",
"status": "complete",
"suitability": {
"sme": true
}
}
],
"documents": [
{
"id": "conflictOfInterest",
"documentType": "conflictOfInterest",
"description": "Not published"
}
],
"procurementMethodRationaleClassifications": [
{
"id": "urgency"
}
]
},
"awards": [
{
"id": "1",
"status": "active",
"value": {
"amountGross": 7301476.22,
"amount": 6084563.52,
"currency": "GBP"
},
"mainProcurementCategory": "services",
"aboveThreshold": true,
"suppliers": [
{
"id": "GB-PPON-PPLQ-9621-JRQL",
"name": "Acumen Waste Services Limited"
}
],
"items": [
{
"id": "1",
"additionalClassifications": [
{
"scheme": "CPV",
"id": "90500000",
"description": "Refuse and waste related services"
}
],
"deliveryAddresses": [
{
"region": "UKJ14",
"country": "GB",
"countryName": "United Kingdom"
},
{
"region": "UKJ14",
"country": "GB",
"countryName": "United Kingdom"
}
],
"relatedLot": "1"
}
],
"contractPeriod": {
"startDate": "2026-01-19T00:00:00Z",
"endDate": "2027-06-12T23:59:59+01:00",
"maxExtentDate": "2028-06-12T23:59:59+01:00"
},
"hasRenewal": true,
"renewal": {
"description": "The initial contract term will follow the first Accepted Programme in accordance with the NEC ECC. The Authority may extend the contract where required to reflect any extensions to the programme."
},
"relatedLots": [
"1"
],
"documents": [
{
"id": "000755-2026",
"documentType": "awardNotice",
"noticeType": "UK5",
"description": "Transparency notice on Find a Tender",
"url": "https://www.find-tender.service.gov.uk/Notice/000755-2026",
"datePublished": "2026-01-06T15:23:03Z",
"format": "text/html"
},
{
"id": "004542-2026",
"documentType": "awardNotice",
"noticeType": "UK6",
"description": "Contract award notice on Find a Tender",
"url": "https://www.find-tender.service.gov.uk/Notice/004542-2026",
"datePublished": "2026-01-19T17:41:34Z",
"format": "text/html"
}
],
"milestones": [
{
"id": "1",
"type": "futureSignatureDate",
"dueDate": "2026-01-19T23:59:59Z",
"status": "scheduled"
}
],
"title": "Kidlington Waste Removal",
"date": "2026-01-06T00:00:00Z"
},
{
"id": "2",
"status": "active",
"mainProcurementCategory": "services",
"suppliers": [
{
"id": "GB-PPON-PPLQ-9621-JRQL",
"name": "Acumen Waste Services Limited"
}
],
"items": [
{
"id": "1",
"additionalClassifications": [
{
"scheme": "CPV",
"id": "90500000",
"description": "Refuse and waste related services"
}
],
"deliveryAddresses": [
{
"region": "UKJ14",
"country": "GB",
"countryName": "United Kingdom"
}
],
"relatedLot": "1"
}
],
"relatedLots": [
"1"
]
}
],
"language": "en",
"contracts": [
{
"id": "2",
"awardID": "2",
"title": "Kidlington Waste Removal",
"status": "active",
"period": {
"startDate": "2026-01-20T00:00:00Z",
"endDate": "2027-06-12T23:59:59+01:00",
"maxExtentDate": "2028-06-12T23:59:59+01:00"
},
"hasRenewal": true,
"renewal": {
"description": "The contract term follows the first Accepted Programme, which sets completion on 12 June 2026. With the 12-month defects period, the contract end date is June 2027. If the programme is extended, the contract may be extended under NEC"
},
"value": {
"amountGross": 7301476.22,
"amount": 6084563.52,
"currency": "GBP"
},
"aboveThreshold": true,
"dateSigned": "2026-01-19T00:00:00Z",
"documents": [
{
"id": "A-11337",
"documentType": "contractSigned",
"url": "https://www.find-tender.service.gov.uk/Notice/Attachment/A-11337",
"format": "application/pdf"
},
{
"id": "009313-2026",
"documentType": "contractNotice",
"noticeType": "UK7",
"description": "Contract details notice on Find a Tender",
"url": "https://www.find-tender.service.gov.uk/Notice/009313-2026",
"datePublished": "2026-02-03T10:17:41Z",
"format": "text/html"
}
],
"agreedMetrics": [
{
"id": "1",
"title": "KPI 1 -- Health & Safety Performance",
"description": "RIDDOR reportable incidents and significant safety breaches. Target: Zero incidents; corrective actions within 48 hours. Reporting: Immediate notification; monthly and annual summaries. NEC Approach: serious breaches may trigger clause 91.2.",
"observations": [
{
"id": "frequency",
"period": {
"durationInMonths": 3
}
}
]
},
{
"id": "2",
"title": "KPI 2 -- Waste Disposal Compliance",
"description": "Percentage of waste sent to approved, licensed landfill or recycling facilities (as agreed). Target: 100% compliant disposal; corrective actions within 48 hours. Reporting: Monthly reporting with transfer notes; annual compliance summary. NEC Approach: treated as a Defect and corrected at Contractor's cost.",
"observations": [
{
"id": "frequency",
"period": {
"durationInMonths": 3
}
}
]
},
{
"id": "3",
"title": "KPI 3 -- Traffic & Access Management Compliance",
"description": "Measure: Compliance with the approved Traffic Management Plan (routing, timing, safety, community controls). Target: >= 98% compliance; corrective actions within 48 hours. Reporting: Monthly reporting via gate logs/GPS/spot checks; Quarterly summary. NEC Approach: repeated breaches treated as defects.",
"observations": [
{
"id": "frequency",
"period": {
"durationInMonths": 3
}
}
]
}
]
}
]
}