Award

Refurbishment Ground Floor Barry Careers Centre

CAREERS WALES

This public procurement record has 2 releases in its history.

Summary of the contracting process

The procurement process undertaken by Careers Wales involves the refurbishment of the ground floor at the Barry Careers Centre, situated at 49 Holton Rd, Barry CF63 4HF. As a body governed by public law, Careers Wales is positioned in Cardiff, CF10 2HH, and is engaging in an open procurement method focusing on construction work. The contract has now progressed to the award stage, with Manning Construction Limited appointed as the supplier after the tender period which ended on 10th December 2025. This initiative falls under the 'works' procurement category, with key project dates indicating that construction commenced in December 2025 and completion was targeted for early February 2026.

This tender presents notable opportunities for businesses specialising in construction, particularly those experienced in site preparation, building installation, and completion work. It notably caters to companies capable of delivering a comprehensive refurbishment project including installation of partitions, internal decoration, and various mechanical and electrical works. Businesses with a robust adherence to health and safety regulations can successfully compete in this environment, as stringent CDM 2015 compliance is required. The involvement of expert asbestos surveyors and efficient project managers would be advantageous due to health risks associated with the site. The project's scale demands experienced contractors who can manage logistics and site security, ensuring a well-coordinated and safe refurbishment process.

Find more tenders on our Open Data Platform.
How relevant is this notice?

D3 Tenders Premium

Win More Public Sector Contracts

AI-powered tender discovery, pipeline management, and market intelligence — everything you need to grow your public sector business.

Notice Title

Refurbishment Ground Floor Barry Careers Centre

Notice Description

1.IntroductionThis PCI has been prepared to highlight principle health and safetyissues arising from the proposed fitting out of Careers Wales Barry, 49 Holton Rd, Barry CF63 4HFRegulation 4: (4) A client must provide pre-construction information as soon as is practicable to every designer and contractor appointed, or being considered for appointment, to the project.Regulation 11: (6) The principal designer must--Assist the client in the provision of the pre-construction information required by regulation4(4); and(b) so far as it is within the principal designer's control, provide pre-construction information, promptly and in a convenient form, to every designer and contractor appointed, or being considered for appointment, to the project.Regulation 12:(3) The principal designer must assist the principal contractor in preparing the construction phase plan by providing to the principal contractor all information the principal designer holds that is 4 of the PCI relevant to the construction phase plan including--(a) Pre-construction information obtained from the client;Any information obtained from designers under regulation 9(3)(b).The Principal Contractor shall use and develop this information as part of his duties and responsibilities under the CDM Regulations.Regulation 4(5): A client must ensure that--(a) before the construction phase begins, a construction phase plan is drawn up by the contractor if there is only one contractor, or by the principal contractor: .......Regulation 12:(1) During the pre-construction phase, and before setting up a construction site, the principal contractor must draw up a construction phase plan or make arrangements for a construction phase plan to be drawn up.(2) The construction phase plan must set out the health and safety arrangements and site rules taking account, where necessary, of the industrial activities taking place on the construction site and, where applicable, must include specific measures concerning work which falls within one or more of the categories set out in Schedule 3.This document should be read in conjunction with the associated PCI information referred to within.Description of projectThe refurbishment of part of Careers Wales Barry, 49 Holton Rd, Barry CF63 4HF. The works will consist of: -SoftstripSupply & Install floor coveringsSupply & install ceilingsSupply & install Partitions / Wall Lining / Doors SetsSupply & install Timber Skirting WorksTape & jointingInternal decorationElectrical/ small powerFire SignageLightingVentilationTea PointGlazed ManifestationTilingDisabled Toilet PackThe project is Notifiable under CDM 2015.The location of the site:49 Holton Rd, Barry CF63 4HFProject Dates: Early December 2025 (TBC)Proposed Completion: Early February 2025 (TBC)Client: Careers Wales, Churchill House, Cardiff, CF10 2HHPrincipal Designer: To be appointed designers by the Principle contractor in line with Careers Wales requirements.Other Consultants / Designers: To be appointed by Principle ContractorProposed use of structure / building: Under the Workplace (Health, Safety and Welfare) Regulation 1992 a workplace is defined as any premises or part of premises which are made available to any person as a place of work, and includes:any place within the premises to which such person has access while at work; andii. any room, lobby, corridor, staircase, road or other place used as a means of access from that place of work or where facilities are provided for use in connection with the place of work other than a public road.The site will be deemed a workplace under the aforementioned regulations and therefore must comply with the provisions of the regulationsExisting records and plansA list of available information relevant to this project can be found within the contract documentation. It should be noted that any record drawings and information provided by the client, project manager or design team may not be entirely accurate or provide a complete record. The principal contractor should verify the accuracy prior to commencing work.All principal contractors who have submitted an interest to tender for the project must arrange a site visit to survey and measure the site on a date and time agreed by Careers Wales. Please note due to the current Covid 19 situation and to keep human interaction to a minimum only two persons from each principle contractor are to a attended the pre-planned site visit.Asbestos R&D survey to be undertaken by the Principle ContractorTenders for this work can be submitted in Welsh. Tenders submitted in Welsh will not be treated less favourablythan those submitted in English. The closing dates for the Tender will be the same for those submitted in Welshand English. The timetable for responding to the bids in Welsh will be the same as those submitted in English

Publication & Lifecycle

Open Contracting ID
ocds-kuma6s-158530
Publication Source
Sell2Wales
Latest Notice
https://www.sell2wales.gov.wales/search/search_switch.aspx?ID=158530
Current Stage
Award
All Stages
Tender, Award

Procurement Classification

Notice Type
S2W Notice - Website Contract Award Notice
Procurement Type
Standard
Procurement Category
Works
Procurement Method
Open
Procurement Method Details
Not specified
Tender Suitability
Not specified
Awardee Scale
Not specified

Common Procurement Vocabulary (CPV)

CPV Divisions

45 - Construction work


CPV Codes

45000000 - Construction work

45100000 - Site preparation work

45300000 - Building installation work

45400000 - Building completion work

Notice Value(s)

Tender Value
Not specified
Lots Value
Not specified
Awards Value
£86,548 Under £100K
Contracts Value
Not specified

Notice Dates

Publication Date
16 Feb 20261 weeks ago
Submission Deadline
10 Dec 2025Expired
Future Notice Date
Not specified
Award Date
14 Jan 20261 months ago
Contract Period
Not specified - Not specified
Recurrence
Not specified

Notice Status

Tender Status
Not Specified
Lots Status
Not Specified
Awards Status
Not Specified
Contracts Status
Active

Contracting Authority (Buyer)

Main Buyer
CAREERS WALES
Contact Name
Mr Paul Powell
Contact Email
Not specified
Contact Phone
+44 2920846578

Buyer Location

Locality
CARDIFF
Postcode
CF10 2HH
Post Town
Cardiff
Country
Wales

Major Region (ITL 1)
TLL Wales
Basic Region (ITL 2)
TLL5 South East Wales
Small Region (ITL 3)
TLL52 Cardiff and Vale of Glamorgan
Delivery Location
Not specified

Local Authority
Cardiff
Electoral Ward
Cathays
Westminster Constituency
Cardiff South and Penarth

Supplier Information

Number of Suppliers
1
Supplier Name

MANNING CONSTRUCTION

Further Information

Notice Documents

Open Contracting Data Standard (OCDS)

View full OCDS Record for this contracting process

Download

The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.

{
    "tag": [
        "compiled"
    ],
    "id": "ocds-kuma6s-158530-2026-02-16T15:17:56Z",
    "date": "2026-02-16T15:17:56Z",
    "ocid": "ocds-kuma6s-158530",
    "initiationType": "tender",
    "parties": [
        {
            "id": "org-12",
            "name": "Careers Wales",
            "address": {
                "streetAddress": "Unit 4 Churchill House, 17 Churchill Way,",
                "locality": "CARDIFF",
                "postalCode": "CF10 2HH"
            },
            "contactPoint": {
                "name": "Mr Paul Powell",
                "telephone": "+44 2920846578",
                "url": "http://www.careerswales.gov.wales"
            },
            "roles": [
                "buyer"
            ],
            "details": {
                "classifications": [
                    {
                        "id": "BODY_PUBLIC",
                        "description": "Body governed by public law",
                        "scheme": "TED_CA_TYPE"
                    }
                ]
            }
        },
        {
            "id": "org-21",
            "name": "Careers Wales",
            "address": {
                "streetAddress": "Unit 4 Churchill House, 17 Churchill Way,",
                "locality": "CARDIFF",
                "postalCode": "CF10 2HH"
            },
            "contactPoint": {
                "name": "Mr Paul Powell",
                "telephone": "+44 2920846578",
                "url": "http://www.careerswales.gov.wales"
            },
            "roles": [
                "buyer"
            ]
        },
        {
            "id": "org-23",
            "name": "Manning Construction Limited",
            "address": {
                "streetAddress": "Brodawel, Coychurch,",
                "locality": "Bridgend",
                "postalCode": "CF355BU"
            },
            "roles": [
                "supplier"
            ]
        }
    ],
    "buyer": {
        "name": "Careers Wales",
        "id": "org-21"
    },
    "tender": {
        "id": "ocds-kuma6s-158530-tender-161688",
        "title": "Refurbishment Ground Floor Barry Careers Centre",
        "description": "1.IntroductionThis PCI has been prepared to highlight principle health and safetyissues arising from the proposed fitting out of Careers Wales Barry, 49 Holton Rd, Barry CF63 4HFRegulation 4: (4) A client must provide pre-construction information as soon as is practicable to every designer and contractor appointed, or being considered for appointment, to the project.Regulation 11: (6) The principal designer must--Assist the client in the provision of the pre-construction information required by regulation4(4); and(b) so far as it is within the principal designer's control, provide pre-construction information, promptly and in a convenient form, to every designer and contractor appointed, or being considered for appointment, to the project.Regulation 12:(3) The principal designer must assist the principal contractor in preparing the construction phase plan by providing to the principal contractor all information the principal designer holds that is 4 of the PCI relevant to the construction phase plan including--(a) Pre-construction information obtained from the client;Any information obtained from designers under regulation 9(3)(b).The Principal Contractor shall use and develop this information as part of his duties and responsibilities under the CDM Regulations.Regulation 4(5): A client must ensure that--(a) before the construction phase begins, a construction phase plan is drawn up by the contractor if there is only one contractor, or by the principal contractor: .......Regulation 12:(1) During the pre-construction phase, and before setting up a construction site, the principal contractor must draw up a construction phase plan or make arrangements for a construction phase plan to be drawn up.(2) The construction phase plan must set out the health and safety arrangements and site rules taking account, where necessary, of the industrial activities taking place on the construction site and, where applicable, must include specific measures concerning work which falls within one or more of the categories set out in Schedule 3.This document should be read in conjunction with the associated PCI information referred to within.Description of projectThe refurbishment of part of Careers Wales Barry, 49 Holton Rd, Barry CF63 4HF. The works will consist of: -SoftstripSupply & Install floor coveringsSupply & install ceilingsSupply & install Partitions / Wall Lining / Doors SetsSupply & install Timber Skirting WorksTape & jointingInternal decorationElectrical/ small powerFire SignageLightingVentilationTea PointGlazed ManifestationTilingDisabled Toilet PackThe project is Notifiable under CDM 2015.The location of the site:49 Holton Rd, Barry CF63 4HFProject Dates: Early December 2025 (TBC)Proposed Completion: Early February 2025 (TBC)Client: Careers Wales, Churchill House, Cardiff, CF10 2HHPrincipal Designer: To be appointed designers by the Principle contractor in line with Careers Wales requirements.Other Consultants / Designers: To be appointed by Principle ContractorProposed use of structure / building: Under the Workplace (Health, Safety and Welfare) Regulation 1992 a workplace is defined as any premises or part of premises which are made available to any person as a place of work, and includes:any place within the premises to which such person has access while at work; andii. any room, lobby, corridor, staircase, road or other place used as a means of access from that place of work or where facilities are provided for use in connection with the place of work other than a public road.The site will be deemed a workplace under the aforementioned regulations and therefore must comply with the provisions of the regulationsExisting records and plansA list of available information relevant to this project can be found within the contract documentation. It should be noted that any record drawings and information provided by the client, project manager or design team may not be entirely accurate or provide a complete record. The principal contractor should verify the accuracy prior to commencing work.All principal contractors who have submitted an interest to tender for the project must arrange a site visit to survey and measure the site on a date and time agreed by Careers Wales. Please note due to the current Covid 19 situation and to keep human interaction to a minimum only two persons from each principle contractor are to a attended the pre-planned site visit.Asbestos R&D survey to be undertaken by the Principle ContractorTenders for this work can be submitted in Welsh. Tenders submitted in Welsh will not be treated less favourablythan those submitted in English. The closing dates for the Tender will be the same for those submitted in Welshand English. The timetable for responding to the bids in Welsh will be the same as those submitted in English",
        "procurementMethod": "open",
        "mainProcurementCategory": "works",
        "submissionMethodDetails": "http://www.sell2wales.gov.wales",
        "tenderPeriod": {
            "endDate": "2025-12-10T12:00:00Z"
        },
        "eligibilityCriteria": "Clients consideration & Management Requirements Planning and managements including H&S goals: At all stages of planning and management of construction works should be undertaken giving due regard to health and safety, through liaison with and engagement of, the Project Manager and Principal Designer. The Principal Contractor is to ensure the following: * Contractors have sufficient numbers of experienced and competent site managers * The proposed site manager(s) are inducted, trained and fully conversant with their HSE management procedures * They have the necessary resource to allocate to these projects * They have sufficient mobilisation time to achieve the scheduled start on site * The programme is realistic to complete the projects in line with the anticipated handover date. Prior to practical completion and prior to handover; the Principal Contractor has maintained suitable and sufficient management and co-ordination procedures for health and safety. The construction site is the responsibility of the Principal Contractor until successful handover has been granted and any visitors need to be managed by the Principal Contractor, accordingly, including suitable site induction, areas of work etc H&S Goals The primary health and safety objective for this programme of works is to ensure that adequate actions and precautions are taken to prevent harm being caused to those carrying out construction work and others who may be affected. Communication and liaison between Client and others: All those in control of construction work are required to provide workers (including the self-employed) under their control, with any information that they require to carry out the work safely and without risk to health. The Principal Contractor shall ensure that all workers are provided with a suitable, site specific induction to inform them of the arrangements for health, safety and welfare at their work site. This should include any relevant findings resulting from risk assessment, including risks arising from activities of other operatives working nearby. Site rules should be explained along with the procedures to be followed in the event of any worker finding themselves in a position of serious and imminent danger. Arrangements for worker engagement on site should always be tailored to the size and nature of the project and risks involved. On smaller sites, informal arrangements for collecting workers' views can be effective, e.g. by arranging reviews of method statements immediately before the work itself is carried out. Contractors may need to make special arrangements for workers for whom English is a second language, or who are unable to read English. The Principal Contractor has a specific duty to make and maintain arrangements to enable effective co-operation and consultation between themselves, contractors and workers. Arrangements made in respect of co-operation and consultation with workers on site should be recorded by the Principal Contractor and included in the construction phase plan. Such arrangements will require regular review and updating, as circumstances on site change. Such arrangements need to cover all workers effectively, including those who may only be on site for brief periods. The arrangements should be proportionate to the size and complexity of the work, the scale of hazards and the size of the workforce. The Principal Contractor shall implement a range of mechanisms to ensure that on-site consultation is effective. This could include regular consultation meetings, consultation during inductions, daily briefings, toolbox talks etc. Security of site: The Principal Contractor shall have sole responsibility to ensure that the working area is secured and fenced off throughout the duration of the works. Welfare provision: Welfare arrangements are to be in accordance with Regulation 13 (4) (c) and Regulation 15 (11) of the CDM2015 and are to be commensurate with the site undertaking. Minimum requirements are as follows: * Toilets * Washing facilities * Hot and cold running water * Drying room * Mess room * Drinking Water, It is proposed that the Principal Contractor will not be given the use of the existing welfare facilities and the principle contractor would have to provide is own welfare units. Adequate first aid facilities are to be maintained on site and at least one appointed person is to be in attendance during site hours. Compliance shall be in accordance with \"The Health and Safety (First Aid) Regulations 1981\". As a minimum, a suitable first aid kit, eye wash and a burns kit should be provided. H&S client employees, customers, others Site hoarding requirement: The Principal Contractor must take necessary steps to prevent access by unauthorised persons and a suitable barrier/fencing should be erected proportional to the risk imposed to the front and rear of the building. Site hoarding, transport vehicle movement restrictions: The Principal Contractor is to make adequate provision for control of site transport and is to ensure that there is a suitable and sufficient Traffic Plan is developed to ensure that residents using the surrounding areas are not endangered by vehicle movements (e.g. deliveries, removal of waste). If possible, the deliveries should be programmed out of the rush hour. Specific arrangements will be explored and agreed at the pre-start meeting. All deliveries will require a banksman to be present. All Contractors staff will need to make arrangements for parking off-site. Existing procedures, permit-to-work systems: Where appropriate; a permit-to-work system is to be adopted for works on electrical services, hot works, works in confined spaces or any other high-risk activities identified. Daily 'hot work permits' will be required where welding, cutting, grinding and the use of naked flames is required. Plant, equipment or flammable materials must be covered with flame retardant materials (or removed) in areas where 'hot work permits' are in operation. In this case, continuous flammable atmosphere monitoring may be required, and a fire watch maintained both during and for a period after the hot works have ceased. The site manager would have to issue the permits. Fire precautions, emergency procedures: In the event of an incident (other than general first aid) the Principal Contractor must follow their company procedures, and ensure that the Client's representative is advised of any incident as quickly and as early as possible so that the Medical Centre can take appropriate action. The affected areas are to be secured and not disturbed until a thorough investigation has been carried out or approval has been given by the Client representative to continue accessing the area has been given. The avenues of escape and assembly points are to be indicated on a drawing in the Construction Phase Plan (CPP) for the site and the Principal Contractor shall describe the method they intend to use to raise the alarm in the event of Fire or other emergencies when a site evacuation may be required. The Principal Contractor's arrangements must include a 'cause and effect' analysis with adjacent premises and their operations. Emergency contact details for key staff (e.g. Fire Wardens / First Aiders etc.) must be incorporated in the CPP's emergency arrangements section. Emergency arrangements must also be displayed in all prominent working areas and form part of the induction / toolbox talk procedure. The PC is to maintain a site register and visitors book at all times. No Smoking will be permitted within the building and the external areas. Emergency Procedures and Means of Escape: Hospital with A&E: University Hospital of Wales, Heath Park Way, Cardiff CF14 4XW Tel: 02920747747 Fire Station: Barry Emergency Services Station, Port Road West, Barry CF62 3AZ Tel: 999 Police Station: Barry Police Station, Gladstone Road, Barry, CF63 1TD. Tel: 999 The principal contractor should develop their own site emergency plan as part of their CPP and also have their own suitable first aid personnel and equipment on site at all times",
        "awardPeriod": {
            "endDate": "2025-12-15T00:00:00Z"
        },
        "documents": [
            {
                "id": "ocds-kuma6s-158530-document-158530-NOV565180-1",
                "title": "Barry Technical Questions",
                "url": "https://www.sell2wales.gov.wales/Notice/Download/DocumentDownload.aspx?id=NOV565180&idx=1",
                "datePublished": "2025-11-26T08:31:18Z",
                "dateModified": "2025-11-26T08:31:18Z",
                "format": "application/vnd.openxmlformats-officedocument.wordprocessingml.document"
            },
            {
                "id": "ocds-kuma6s-158530-document-158530-NOV565180-2",
                "title": "Schedule of Works",
                "url": "https://www.sell2wales.gov.wales/Notice/Download/DocumentDownload.aspx?id=NOV565180&idx=2",
                "datePublished": "2025-11-26T08:31:18Z",
                "dateModified": "2025-11-26T08:31:18Z",
                "format": "application/pdf"
            },
            {
                "id": "ocds-kuma6s-158530-document-158530-NOV565180-3",
                "title": "Drawings",
                "url": "https://www.sell2wales.gov.wales/Notice/Download/DocumentDownload.aspx?id=NOV565180&idx=3",
                "datePublished": "2025-11-26T08:31:19Z",
                "dateModified": "2025-11-26T08:31:19Z",
                "format": "application/pdf"
            },
            {
                "id": "ocds-kuma6s-158530-document-158530-NOV565180-4",
                "title": "Drawings",
                "url": "https://www.sell2wales.gov.wales/Notice/Download/DocumentDownload.aspx?id=NOV565180&idx=4",
                "datePublished": "2025-11-26T08:31:19Z",
                "dateModified": "2025-11-26T08:31:19Z",
                "format": "application/pdf"
            },
            {
                "id": "ocds-kuma6s-158530-document-158530-NOV565180-5",
                "title": "Drawings",
                "url": "https://www.sell2wales.gov.wales/Notice/Download/DocumentDownload.aspx?id=NOV565180&idx=5",
                "datePublished": "2025-11-26T08:31:19Z",
                "dateModified": "2025-11-26T08:31:19Z",
                "format": "application/pdf"
            },
            {
                "id": "ocds-kuma6s-158530-document-158530-NOV565180-6",
                "title": "Drawings",
                "url": "https://www.sell2wales.gov.wales/Notice/Download/DocumentDownload.aspx?id=NOV565180&idx=6",
                "datePublished": "2025-11-26T08:31:19Z",
                "dateModified": "2025-11-26T08:31:19Z",
                "format": "application/pdf"
            },
            {
                "id": "ocds-kuma6s-158530-document-158530-NOV565180-7",
                "title": "Drawings",
                "url": "https://www.sell2wales.gov.wales/Notice/Download/DocumentDownload.aspx?id=NOV565180&idx=7",
                "datePublished": "2025-11-26T08:31:19Z",
                "dateModified": "2025-11-26T08:31:19Z",
                "format": "application/pdf"
            },
            {
                "id": "ocds-kuma6s-158530-document-158530-NOV565180-8",
                "title": "Drawings",
                "url": "https://www.sell2wales.gov.wales/Notice/Download/DocumentDownload.aspx?id=NOV565180&idx=8",
                "datePublished": "2025-11-26T08:31:19Z",
                "dateModified": "2025-11-26T08:31:19Z",
                "format": "application/pdf"
            },
            {
                "id": "ocds-kuma6s-158530-document-158530-NOV565180-9",
                "title": "Drawings",
                "url": "https://www.sell2wales.gov.wales/Notice/Download/DocumentDownload.aspx?id=NOV565180&idx=9",
                "datePublished": "2025-11-26T08:31:19Z",
                "dateModified": "2025-11-26T08:31:19Z",
                "format": "application/pdf"
            },
            {
                "id": "ocds-kuma6s-158530-document-158530-NOV565180-10",
                "title": "Drawings",
                "url": "https://www.sell2wales.gov.wales/Notice/Download/DocumentDownload.aspx?id=NOV565180&idx=10",
                "datePublished": "2025-11-26T08:31:19Z",
                "dateModified": "2025-11-26T08:31:19Z",
                "format": "application/pdf"
            },
            {
                "id": "ocds-kuma6s-158530-document-158530-NOV565180-11",
                "title": "Drawings",
                "url": "https://www.sell2wales.gov.wales/Notice/Download/DocumentDownload.aspx?id=NOV565180&idx=11",
                "datePublished": "2025-11-26T08:31:20Z",
                "dateModified": "2025-11-26T08:31:20Z",
                "format": "application/pdf"
            },
            {
                "id": "ocds-kuma6s-158530-document-158530-NOV565180-12",
                "title": "Drawings",
                "url": "https://www.sell2wales.gov.wales/Notice/Download/DocumentDownload.aspx?id=NOV565180&idx=12",
                "datePublished": "2025-11-26T08:31:20Z",
                "dateModified": "2025-11-26T08:31:20Z",
                "format": "application/pdf"
            },
            {
                "id": "ocds-kuma6s-158530-document-158530-NOV565180-13",
                "title": "Drawings",
                "url": "https://www.sell2wales.gov.wales/Notice/Download/DocumentDownload.aspx?id=NOV565180&idx=13",
                "datePublished": "2025-11-26T08:31:20Z",
                "dateModified": "2025-11-26T08:31:20Z",
                "format": "application/pdf"
            }
        ],
        "communication": {
            "atypicalToolUrl": "http://www.sell2wales.gov.wales"
        },
        "additionalClassifications": [
            {
                "id": "45000000",
                "description": "Construction work",
                "scheme": "CPV"
            },
            {
                "id": "45100000",
                "description": "Site preparation work",
                "scheme": "CPV"
            },
            {
                "id": "45300000",
                "description": "Building installation work",
                "scheme": "CPV"
            },
            {
                "id": "45400000",
                "description": "Building completion work",
                "scheme": "CPV"
            }
        ]
    },
    "noticetype": "S2W Notice - Website Contract Award Notice",
    "awards": [
        {
            "id": "ocds-kuma6s-158530-award-161688-14",
            "value": {
                "amount": 86548,
                "currency": "GBP"
            },
            "suppliers": [
                {
                    "id": "org-23",
                    "name": "Manning Construction Limited"
                }
            ],
            "items": [
                {
                    "id": "ocds-kuma6s-158530-awarditem-161688-14"
                }
            ]
        }
    ],
    "contracts": [
        {
            "id": "ocds-kuma6s-158530-award-161688-14",
            "awardID": "ocds-kuma6s-158530-award-161688-14",
            "status": "active",
            "dateSigned": "2026-01-14T00:00:00Z"
        }
    ],
    "bids": {
        "statistics": [
            {
                "id": "ocds-kuma6s-158530-bidsstatistic-161688-14",
                "measure": "bids",
                "value": 2
            }
        ]
    }
}