Notice Information
Notice Title
Phase Four Station Improvements
Notice Description
As part of the Subway Modernisation programme Strathclyde Partnership for Transport (SPT) tendered the refurbishment of St Georges Cross, Cowcaddens, West Street and Kinning Park Stations. The ITT issued was for two lots: 1. St Georges Cross and Kinning Park Stations; and 2. Cowcaddens and West Street Stations. A contract for each station has been awarded individually from each lot, resulting in four contracts in total. Tendering Organisations could bid for one or both lots. The refurbishment works will be as the scope outlined in this advert and detailed at stage two of this process. However, should further works be required to complete the refurbishment of each station, SPT reserves the right to award this work to the successful bidder(s) for the appropriate lots.
Lot Information
St Georges Cross and Kinning Park Stations
SPT require improvement works in respect of the following areas: Platform, vertical circulation, concourse, back of house Mechanical and Electrical replacement (lighting, emergency lighting, PAVA, fire alarms, HVAC etc.) Floors, walls, ceilings, station office, ticket desk, switch rooms Track access requirements at platform Working in a live rail environment A key feature of implementing the works is to do so while the stations remain operational. Liaising with Subway Engineering and Operations Departments will be key. An essential part of the liaison will be the timeous submission of method statements and risk assessments, and cooperation with operational and maintenance needs of the Subway. Should any further works be required to complete the refurbishment of these stations SPT reserve the right, at SPT's sole discretion to award this work to the successful bidder for this lot.
Cowcaddens and West Street StationsSPT require improvement works in respect of the following areas: Platform, vertical circulation, concourse, back of house Mechanical and Electrical replacement (lighting, emergency lighting, PAVA, fire alarms, HVAC etc.) Floors, walls, ceilings, station office, ticket desk, switch rooms Track access requirements at platform Working in a live rail environment A key feature of implementing the works is to do so while the stations remain operational. Liaising with Subway Engineering and Operations Departments will be key. An essential part of the liaison will be the timeous submission of method statements and risk assessments, and cooperation with operational and maintenance needs of the Subway. Should any further works be required to complete the refurbishment of these stations SPT reserve the right, at SPT's sole discretion to award this work to the successful bidder for this lot.
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-r6ebe6-0000529904
- Publication Source
- Public Contracts Scotland
- Latest Notice
- https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=OCT334190
- Current Stage
- Award
- All Stages
- Tender, Award
Procurement Classification
- Notice Type
- OJEU - F6 - Contract Award Notice (Utilities)
- Procurement Type
- Standard
- Procurement Category
- Works
- Procurement Method
- Selective
- Procurement Method Details
- Restricted procedure
- Tender Suitability
- Not specified
- Awardee Scale
- Large
Common Procurement Vocabulary (CPV)
- CPV Divisions
45 - Construction work
-
- CPV Codes
45453100 - Refurbishment work
Notice Value(s)
- Tender Value
- £7,000,000 £1M-£10M
- Lots Value
- Not specified
- Awards Value
- Not specified
- Contracts Value
- Not specified
Notice Dates
- Publication Date
- 11 Oct 20187 years ago
- Submission Deadline
- 20 Mar 2018Expired
- Future Notice Date
- Not specified
- Award Date
- 11 Oct 20187 years ago
- Contract Period
- Not specified - Not specified
- Recurrence
- Not specified
Notice Status
- Tender Status
- Complete
- Lots Status
- Complete
- Awards Status
- Not Specified
- Contracts Status
- Active
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- STRATHCLYDE PARTNERSHIP FOR TRANSPORT (UTILITIES)
- Contact Name
- Not specified
- Contact Email
- procurement@spt.co.uk
- Contact Phone
- +44 1413333556
Buyer Location
- Locality
- GLASGOW
- Postcode
- G2 5JF
- Post Town
- Glasgow
- Country
- Scotland
-
- Major Region (ITL 1)
- TLM Scotland
- Basic Region (ITL 2)
- TLM3 West Central Scotland
- Small Region (ITL 3)
- TLM32 Glasgow City
- Delivery Location
- TLM82 Glasgow City
-
- Local Authority
- Glasgow City
- Electoral Ward
- Anderston/City/Yorkhill
- Westminster Constituency
- Glasgow North
Further Information
Notice Documents
-
https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=FEB309718
Phase Four Station Improvements - As part of the Subway Modernisation programme Strathclyde Partnership for Transport (SPT) now wishes to tender the refurbishment of St Georges Cross, Cowcaddens, West Street and Kinning Park Stations. This ITT is for two lots: 1. St Georges Cross and Kinning Park Stations; and 2. Cowcaddens and West Street Stations. A contract for each station will be awarded individually from each lot, resulting in four contracts in total. Tendering Organisations can bid for one or both lots. The refurbishment works will be as the scope outlined in this advert and detailed at stage two of this process. However, should further works be required to complete the refurbishment of each station, SPT reserves the right to award this work to the successful bidder(s) for the appropriate lots. -
https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=OCT334190
Phase Four Station Improvements - As part of the Subway Modernisation programme Strathclyde Partnership for Transport (SPT) tendered the refurbishment of St Georges Cross, Cowcaddens, West Street and Kinning Park Stations. The ITT issued was for two lots: 1. St Georges Cross and Kinning Park Stations; and 2. Cowcaddens and West Street Stations. A contract for each station has been awarded individually from each lot, resulting in four contracts in total. Tendering Organisations could bid for one or both lots. The refurbishment works will be as the scope outlined in this advert and detailed at stage two of this process. However, should further works be required to complete the refurbishment of each station, SPT reserves the right to award this work to the successful bidder(s) for the appropriate lots.
Open Contracting Data Standard (OCDS)
View full OCDS Record for this contracting process
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.
{
"tag": [
"compiled"
],
"id": "ocds-r6ebe6-0000529904-2018-10-11T00:00:00Z",
"date": "2018-10-11T00:00:00Z",
"ocid": "ocds-r6ebe6-0000529904",
"initiationType": "tender",
"parties": [
{
"id": "org-2",
"name": "Strathclyde Partnership for Transport (UTILITIES)",
"identifier": {
"legalName": "Strathclyde Partnership for Transport (UTILITIES)"
},
"address": {
"streetAddress": "131, St Vincent Street",
"locality": "Glasgow",
"region": "UKM82",
"postalCode": "G2 5JF"
},
"contactPoint": {
"email": "procurement@spt.co.uk",
"telephone": "+44 1413333556",
"faxNumber": "+44 1413333224",
"url": "http://"
},
"roles": [
"buyer",
"centralPurchasingBody",
"reviewBody"
],
"details": {
"classifications": [
{
"id": "Urban railway, tramway, trolleybus or bus services",
"scheme": "TED_CE_ACTIVITY"
}
],
"url": "http://www.spt.co.uk"
}
},
{
"id": "org-3",
"name": "John Graham Construction Ltd, t/a Graham Construction",
"identifier": {
"legalName": "John Graham Construction Ltd, t/a Graham Construction"
},
"address": {
"streetAddress": "1 Seaward Place, Centurion Business Park",
"locality": "Glasgow",
"region": "UK",
"postalCode": "G41 1HH"
},
"contactPoint": {
"telephone": "+44 2892689500"
},
"roles": [
"supplier"
],
"details": {
"scale": "large",
"url": "http://"
}
}
],
"buyer": {
"name": "Strathclyde Partnership for Transport (UTILITIES)",
"id": "org-2"
},
"tender": {
"id": "17-250",
"title": "Phase Four Station Improvements",
"description": "As part of the Subway Modernisation programme Strathclyde Partnership for Transport (SPT) tendered the refurbishment of St Georges Cross, Cowcaddens, West Street and Kinning Park Stations. The ITT issued was for two lots: 1. St Georges Cross and Kinning Park Stations; and 2. Cowcaddens and West Street Stations. A contract for each station has been awarded individually from each lot, resulting in four contracts in total. Tendering Organisations could bid for one or both lots. The refurbishment works will be as the scope outlined in this advert and detailed at stage two of this process. However, should further works be required to complete the refurbishment of each station, SPT reserves the right to award this work to the successful bidder(s) for the appropriate lots.",
"status": "complete",
"items": [
{
"id": "1",
"additionalClassifications": [
{
"id": "45453100",
"scheme": "CPV"
}
],
"deliveryLocation": {
"description": "Glasgow"
},
"deliveryAddresses": [
{
"region": "UKM82"
},
{
"region": "UKM82"
}
],
"relatedLot": "1"
},
{
"id": "2",
"additionalClassifications": [
{
"id": "45453100",
"scheme": "CPV"
}
],
"deliveryLocation": {
"description": "Glasgow"
},
"deliveryAddresses": [
{
"region": "UKM82"
},
{
"region": "UKM82"
}
],
"relatedLot": "2"
}
],
"value": {
"amount": 7000000,
"currency": "GBP"
},
"procurementMethod": "selective",
"procurementMethodDetails": "Restricted procedure",
"mainProcurementCategory": "works",
"submissionMethod": [
"electronicSubmission"
],
"submissionMethodDetails": "https://www.publictendersscotland.publiccontractsscotland.gov.uk",
"tenderPeriod": {
"endDate": "2018-03-20T10:00:00Z"
},
"documents": [
{
"id": "FEB309718",
"documentType": "contractNotice",
"title": "Phase Four Station Improvements",
"description": "As part of the Subway Modernisation programme Strathclyde Partnership for Transport (SPT) now wishes to tender the refurbishment of St Georges Cross, Cowcaddens, West Street and Kinning Park Stations. This ITT is for two lots: 1. St Georges Cross and Kinning Park Stations; and 2. Cowcaddens and West Street Stations. A contract for each station will be awarded individually from each lot, resulting in four contracts in total. Tendering Organisations can bid for one or both lots. The refurbishment works will be as the scope outlined in this advert and detailed at stage two of this process. However, should further works be required to complete the refurbishment of each station, SPT reserves the right to award this work to the successful bidder(s) for the appropriate lots.",
"url": "https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=FEB309718",
"format": "text/html"
},
{
"id": "OCT334190",
"documentType": "awardNotice",
"title": "Phase Four Station Improvements",
"description": "As part of the Subway Modernisation programme Strathclyde Partnership for Transport (SPT) tendered the refurbishment of St Georges Cross, Cowcaddens, West Street and Kinning Park Stations. The ITT issued was for two lots: 1. St Georges Cross and Kinning Park Stations; and 2. Cowcaddens and West Street Stations. A contract for each station has been awarded individually from each lot, resulting in four contracts in total. Tendering Organisations could bid for one or both lots. The refurbishment works will be as the scope outlined in this advert and detailed at stage two of this process. However, should further works be required to complete the refurbishment of each station, SPT reserves the right to award this work to the successful bidder(s) for the appropriate lots.",
"url": "https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=OCT334190",
"format": "text/html"
}
],
"lots": [
{
"id": "1",
"title": "St Georges Cross and Kinning Park Stations",
"description": "SPT require improvement works in respect of the following areas: Platform, vertical circulation, concourse, back of house Mechanical and Electrical replacement (lighting, emergency lighting, PAVA, fire alarms, HVAC etc.) Floors, walls, ceilings, station office, ticket desk, switch rooms Track access requirements at platform Working in a live rail environment A key feature of implementing the works is to do so while the stations remain operational. Liaising with Subway Engineering and Operations Departments will be key. An essential part of the liaison will be the timeous submission of method statements and risk assessments, and cooperation with operational and maintenance needs of the Subway. Should any further works be required to complete the refurbishment of these stations SPT reserve the right, at SPT's sole discretion to award this work to the successful bidder for this lot.",
"status": "complete",
"hasOptions": false,
"secondStage": {
"minimumCandidates": 5,
"maximumCandidates": 5
},
"submissionTerms": {
"variantPolicy": "notAllowed"
},
"contractPeriod": {
"durationInDays": 360
},
"hasRenewal": false,
"awardCriteria": {
"criteria": [
{
"type": "quality",
"name": "Methodology",
"description": "35"
},
{
"type": "price",
"description": "40"
}
]
}
},
{
"id": "2",
"title": "Cowcaddens and West Street Stations",
"description": "SPT require improvement works in respect of the following areas: Platform, vertical circulation, concourse, back of house Mechanical and Electrical replacement (lighting, emergency lighting, PAVA, fire alarms, HVAC etc.) Floors, walls, ceilings, station office, ticket desk, switch rooms Track access requirements at platform Working in a live rail environment A key feature of implementing the works is to do so while the stations remain operational. Liaising with Subway Engineering and Operations Departments will be key. An essential part of the liaison will be the timeous submission of method statements and risk assessments, and cooperation with operational and maintenance needs of the Subway. Should any further works be required to complete the refurbishment of these stations SPT reserve the right, at SPT's sole discretion to award this work to the successful bidder for this lot.",
"status": "complete",
"hasOptions": false,
"secondStage": {
"minimumCandidates": 5,
"maximumCandidates": 5
},
"submissionTerms": {
"variantPolicy": "notAllowed"
},
"contractPeriod": {
"durationInDays": 360
},
"hasRenewal": false,
"awardCriteria": {
"criteria": [
{
"type": "quality",
"name": "Methodology",
"description": "35"
},
{
"type": "price",
"description": "40"
}
]
}
}
],
"lotDetails": {
"maximumLotsBidPerSupplier": 2147483647
},
"contractTerms": {
"hasElectronicPayment": true,
"hasElectronicOrdering": true,
"electronicInvoicingPolicy": "allowed"
},
"coveredBy": [
"GPA"
],
"otherRequirements": {
"reductionCriteria": "Tenderers require to complete an ESPD response. A qualification and technical envelope is required. The technical questions are as detailed in the lots description."
},
"secondStage": {
"invitationDate": "2018-06-01T00:00:00Z"
},
"selectionCriteria": {
"criteria": [
{
"type": "economic",
"minimum": "Tenderers must state their turnover for the previous three years. Tenderers must have a minimum Turnover of GBP5,000,000 (Five million GBP) to bid for one lot and a minimum turnover of GBP 10,000,000 (Ten million GBP)to bid for both lots. Prior to award a check will be made to ensure that the potential contractor is approved by Dun and Bradstreet for the size of contract to be awarded. This is a SBCC contract 2016 with amendments which will be published at ITT stage. Final tenders must be submitted on the basis of unconditional acceptance of the terms and conditions of contract specified by SPT. Tenderers will have the opportunity to raise queries on the terms and conditions through the clarification process and any proposed amendments acceptable to SPT will be communicated to all tenderers. SPT reserves the right not to make any changes to the terms and conditions as issued with the ITT Insurance of Works - Insurance Option C applies (likely to be a joint names policy). A replacement schedule will not be utilised. Insurance: Contractor's insurance - injury to persons or property Insurance cover (for any one event or series of events arising from one event): GBP10,000,000 Insurance - Liability of Employer Insurance will be required Minimum amount of indemnity for any one occurrence or series of occurrences arising out of one event GBP10,000,000"
}
]
},
"submissionTerms": {
"languages": [
"en"
],
"bidValidityPeriod": {
"durationInDays": 120
},
"requiresGuarantees": true
},
"classification": {
"id": "45453100",
"scheme": "CPV"
},
"hasRecurrence": false,
"legalBasis": {
"id": "32014L0025",
"scheme": "CELEX"
}
},
"language": "EN",
"description": "This contract has been awardedunder The Utilities Contracts (Scotland) Regulations 2016. This is a SBCC contract 2016 with amendments which will be published at ITT stage. Final tenders must were submitted on the basis of unconditional acceptance of the terms and conditions of contract specified by SPT. The Contractor is liable to the Client for any direct damage caused by the Contractor or by his servants or agents to the Client's existing property. The Contractor is also liable for loss of income to the Client should the Client be unable to run passenger trains as a result of the damage. These risks shall be covered by the Contactor's insurance cover. Scottish law will applies to this contract. The Contracting Authority does not intend to include any community benefit requirements in this contract for the following reason: Community benefits will not be evaluated as part of this contract. However, all contractors who submit an ESPD response should be provide a description of what community benefits, if any, will apply to the contract(s) if awarded. (SC Ref:560724)",
"links": [
{
"rel": "canonical",
"href": "https://api.publiccontractsscotland.gov.uk/v1/Notice?id=ocds-r6ebe6-0000529904"
},
{
"rel": "canonical",
"href": "https://api.publiccontractsscotland.gov.uk/v1/Notice?id=ocds-r6ebe6-0000529904"
}
],
"noticetype": "OJEU - F6 - Contract Award Notice (Utilities)",
"awards": [
{
"id": "17-250-1",
"title": "St Georges Cross and Kinning Park Stations",
"suppliers": [
{
"id": "org-3",
"name": "John Graham Construction Ltd, t/a Graham Construction"
}
],
"relatedLots": [
"1"
]
},
{
"id": "17-250-2",
"title": "Cowcaddens and West Street Stations",
"suppliers": [
{
"id": "org-3",
"name": "John Graham Construction Ltd, t/a Graham Construction"
}
],
"relatedLots": [
"2"
]
}
],
"contracts": [
{
"id": "17-250-1",
"awardID": "17-250-1",
"title": "St Georges Cross and Kinning Park Stations",
"status": "active",
"dateSigned": "2018-10-11T00:00:00Z"
},
{
"id": "17-250-2",
"awardID": "17-250-2",
"title": "Cowcaddens and West Street Stations",
"status": "active",
"dateSigned": "2018-10-11T00:00:00Z"
}
],
"relatedProcesses": [
{
"id": "1",
"relationship": [
"planning"
],
"scheme": "EU-OJ",
"identifier": "2018/S 030-066115"
}
]
}