Notice Information
Notice Title
Reinforced Earth SubContract Enquiry for A303 Sparkford to Ilchester
Notice Description
NOTIFICATION OF REINFORCED EARTH SUBCONTRACT PACKAGE A303 Sparkford to Ilchester Galliford Try, as the South West Regional Delivery Partner are delivering the A303 Sparkford to Ilchester dualling project in the county of Somerset on behalf of Highways England. The project involves the design and construction of 5.6km of new dual lane all-purpose carriageway, connecting the existing dual carriageway at the Sparkford and Podimore Bypasses, therefore creating a continuous dual carriageway between Mere and the Podimore Roundabout. The project is currently awaiting the approval of the Development Consent Order from the Secretary of State for Transport and this is expected to be given in early Spring 2020. Subject to receiving approval, the project is forecast to commence on site in late summer 2020 and will take around 2 years to complete. Package: Reinforced Earth Design & Supply We are seeking to procure a supplier to support the design process alongside our designer Sweco and supply the reinforced soil components and concrete face panels. Outline Scope of Works The project involves the construction of two bridges which are both to be constructed with reinforced soil abutments and wingwalls with concrete facing panels. Hazelgrove Bridge - single span bridge carrying the new A303 dual carriageway over a new single carriageway link road Steat Hill Bridge - single span bridge carrying a link road over the new A303 dual carriageway Programme Design works is ongoing on the project and we are seeking to complete the design to both bridges in Spring 2020. Construction works on both bridges will commence in late summer/autumn 2020 with completion in Spring 2021. Timings Deadline for Notifications of Interest 17:30hrs Wednesday 12th March 2020 Deadline for tender submission 17:30hrs Wednesday 18th March 2020 If this package is of interest to your company please contact the Managing QS [Adrian Paddock] by e-mail on adrian.paddock@gallifordtry.co.uk, by the above deadline for notifications of interest and a link to the subcontract enquiry documentation can be issued. Additional information: NOTIFICATION OF REINFORCED EARTH SUBCONTRACT PACKAGE A303 Sparkford to Ilchester Galliford Try, as the South West Regional Delivery Partner are delivering the A303 Sparkford to Ilchester dualling project in the county of Somerset on behalf of Highways England. The project involves the design and construction of 5.6km of new dual lane all-purpose carriageway, connecting the existing dual carriageway at the Sparkford and Podimore Bypasses, therefore creating a continuous dual carriageway between Mere and the Podimore Roundabout. The project is currently awaiting the approval of the Development Consent Order from the Secretary of State for Transport and this is expected to be given in early Spring 2020. Subject to receiving approval, the project is forecast to commence on site in late summer 2020 and will take around 2 years to complete. Package: Reinforced Earth Design & Supply We are seeking to procure a supplier to support the design process alongside our designer Sweco and supply the reinforced soil components and concrete face panels. Outline Scope of Works The project involves the construction of two bridges which are both to be constructed with reinforced soil abutments and wingwalls with concrete facing panels. Hazelgrove Bridge - single span bridge carrying the new A303 dual carriageway over a new single carriageway link road Steat Hill Bridge - single span bridge carrying a link road over the new A303 dual carriageway Programme Design works is ongoing on the project and we are seeking to complete the design to both bridges in Spring 2020. Construction works on both bridges will commence in late summer/autumn 2020 with completion in Spring 2021. Timings Deadline for Notifications of Interest 17:30hrs Wednesday 12th March 2020 Deadline for tender submission 17:30hrs Wednesday 18th March 2020 If this package is of interest to your company please contact the Managing QS [Adrian Paddock] by e-mail on adrian.paddock@gallifordtry.co.uk, by the above deadline for notifications of interest and a link to the subcontract enquiry documentation can be issued.
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-b5fd17-0c7e5760-67ba-4cc0-9dec-4331aca74bf4
- Publication Source
- Contracts Finder
- Latest Notice
- https://www.contractsfinder.service.gov.uk/Notice/62edba2a-20ba-4273-b48c-1e6684b2c77a
- Current Stage
- Tender
- All Stages
- Tender
Procurement Classification
- Notice Type
- Tender Notice
- Procurement Type
- Standard
- Procurement Category
- Works
- Procurement Method
- Open
- Procurement Method Details
- Open procedure (above threshold)
- Tender Suitability
- Not specified
- Awardee Scale
- Not specified
Common Procurement Vocabulary (CPV)
- CPV Divisions
45 - Construction work
-
- CPV Codes
45262620 - Supporting walls
Notice Value(s)
- Tender Value
- Not specified
- Lots Value
- Not specified
- Awards Value
- Not specified
- Contracts Value
- Not specified
Notice Dates
- Publication Date
- 18 Mar 20214 years ago
- Submission Deadline
- 24 Mar 2021Expired
- Future Notice Date
- Not specified
- Award Date
- Not specified
- Contract Period
- 31 Aug 2021 - 1 May 2022 6-12 months
- Recurrence
- Not specified
Notice Status
- Tender Status
- Active
- Lots Status
- Not Specified
- Awards Status
- Not Specified
- Contracts Status
- Not Specified
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- GALLIFORD TRY
- Contact Name
- Piers Eastwood
- Contact Email
- adrian.paddock@gallifordtry.co.uk
- Contact Phone
- Not specified
Buyer Location
- Locality
- BRISTOL
- Postcode
- BS1 4DJ
- Post Town
- Bristol
- Country
- England
-
- Major Region (ITL 1)
- TLK South West (England)
- Basic Region (ITL 2)
- TLK5 West of England
- Small Region (ITL 3)
- TLK51 Bristol, City of
- Delivery Location
- Not specified
-
- Local Authority
- Bristol, City of
- Electoral Ward
- Central
- Westminster Constituency
- Bristol Central
Further Information
Notice Documents
-
https://www.contractsfinder.service.gov.uk/Notice/62edba2a-20ba-4273-b48c-1e6684b2c77a
18th March 2021 - Opportunity notice on Contracts Finder
Open Contracting Data Standard (OCDS)
View full OCDS Record for this contracting process
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.
{
"tag": [
"compiled"
],
"id": "ocds-b5fd17-0c7e5760-67ba-4cc0-9dec-4331aca74bf4-2021-03-18T10:35:33Z",
"date": "2021-03-18T10:35:33Z",
"ocid": "ocds-b5fd17-0c7e5760-67ba-4cc0-9dec-4331aca74bf4",
"language": "en",
"initiationType": "tender",
"tender": {
"id": "A303/Stage 6/Reinforced Earth",
"title": "Reinforced Earth SubContract Enquiry for A303 Sparkford to Ilchester",
"description": "NOTIFICATION OF REINFORCED EARTH SUBCONTRACT PACKAGE A303 Sparkford to Ilchester Galliford Try, as the South West Regional Delivery Partner are delivering the A303 Sparkford to Ilchester dualling project in the county of Somerset on behalf of Highways England. The project involves the design and construction of 5.6km of new dual lane all-purpose carriageway, connecting the existing dual carriageway at the Sparkford and Podimore Bypasses, therefore creating a continuous dual carriageway between Mere and the Podimore Roundabout. The project is currently awaiting the approval of the Development Consent Order from the Secretary of State for Transport and this is expected to be given in early Spring 2020. Subject to receiving approval, the project is forecast to commence on site in late summer 2020 and will take around 2 years to complete. Package: Reinforced Earth Design & Supply We are seeking to procure a supplier to support the design process alongside our designer Sweco and supply the reinforced soil components and concrete face panels. Outline Scope of Works The project involves the construction of two bridges which are both to be constructed with reinforced soil abutments and wingwalls with concrete facing panels. Hazelgrove Bridge - single span bridge carrying the new A303 dual carriageway over a new single carriageway link road Steat Hill Bridge - single span bridge carrying a link road over the new A303 dual carriageway Programme Design works is ongoing on the project and we are seeking to complete the design to both bridges in Spring 2020. Construction works on both bridges will commence in late summer/autumn 2020 with completion in Spring 2021. Timings Deadline for Notifications of Interest 17:30hrs Wednesday 12th March 2020 Deadline for tender submission 17:30hrs Wednesday 18th March 2020 If this package is of interest to your company please contact the Managing QS [Adrian Paddock] by e-mail on adrian.paddock@gallifordtry.co.uk, by the above deadline for notifications of interest and a link to the subcontract enquiry documentation can be issued. Additional information: NOTIFICATION OF REINFORCED EARTH SUBCONTRACT PACKAGE A303 Sparkford to Ilchester Galliford Try, as the South West Regional Delivery Partner are delivering the A303 Sparkford to Ilchester dualling project in the county of Somerset on behalf of Highways England. The project involves the design and construction of 5.6km of new dual lane all-purpose carriageway, connecting the existing dual carriageway at the Sparkford and Podimore Bypasses, therefore creating a continuous dual carriageway between Mere and the Podimore Roundabout. The project is currently awaiting the approval of the Development Consent Order from the Secretary of State for Transport and this is expected to be given in early Spring 2020. Subject to receiving approval, the project is forecast to commence on site in late summer 2020 and will take around 2 years to complete. Package: Reinforced Earth Design & Supply We are seeking to procure a supplier to support the design process alongside our designer Sweco and supply the reinforced soil components and concrete face panels. Outline Scope of Works The project involves the construction of two bridges which are both to be constructed with reinforced soil abutments and wingwalls with concrete facing panels. Hazelgrove Bridge - single span bridge carrying the new A303 dual carriageway over a new single carriageway link road Steat Hill Bridge - single span bridge carrying a link road over the new A303 dual carriageway Programme Design works is ongoing on the project and we are seeking to complete the design to both bridges in Spring 2020. Construction works on both bridges will commence in late summer/autumn 2020 with completion in Spring 2021. Timings Deadline for Notifications of Interest 17:30hrs Wednesday 12th March 2020 Deadline for tender submission 17:30hrs Wednesday 18th March 2020 If this package is of interest to your company please contact the Managing QS [Adrian Paddock] by e-mail on adrian.paddock@gallifordtry.co.uk, by the above deadline for notifications of interest and a link to the subcontract enquiry documentation can be issued.",
"datePublished": "2020-03-05T15:25:25Z",
"status": "active",
"classification": {
"scheme": "CPV",
"id": "45262620",
"description": "Supporting walls"
},
"items": [
{
"id": "1",
"deliveryAddresses": [
{
"postalCode": "BA22 7JE"
},
{
"postalCode": "BA22 7JE"
}
]
}
],
"procurementMethod": "open",
"procurementMethodDetails": "Open procedure (above threshold)",
"tenderPeriod": {
"endDate": "2021-03-24T23:59:59Z"
},
"contractPeriod": {
"startDate": "2021-09-01T00:00:00+01:00",
"endDate": "2022-05-01T23:59:59+01:00"
},
"suitability": {
"sme": false,
"vcse": false
},
"mainProcurementCategory": "works",
"documents": [
{
"id": "1",
"documentType": "tenderNotice",
"description": "Opportunity notice on Contracts Finder",
"url": "https://www.contractsfinder.service.gov.uk/Notice/62edba2a-20ba-4273-b48c-1e6684b2c77a",
"datePublished": "2020-03-05T15:25:25Z",
"format": "text/html",
"language": "en",
"dateModified": "2021-03-18T10:35:33Z"
}
]
},
"parties": [
{
"id": "GB-SRS-supplierregistration.cabinetoffice.gov.uk/J5Wf5fFP",
"name": "galliford try",
"identifier": {
"legalName": "galliford try",
"scheme": "GB-SRS",
"id": "supplierregistration.cabinetoffice.gov.uk/J5Wf5fFP"
},
"address": {
"streetAddress": "5th Floor, Broad Quay House, Prince Street",
"locality": "Bristol",
"postalCode": "BS1 4DJ",
"countryName": "England"
},
"contactPoint": {
"name": "Piers Eastwood",
"email": "Adrian.paddock@gallifordtry.co.uk"
},
"roles": [
"buyer"
]
}
],
"buyer": {
"id": "GB-SRS-supplierregistration.cabinetoffice.gov.uk/J5Wf5fFP",
"name": "galliford try"
}
}