Notice Information
Notice Title
SZC CWA - Pool Bunker Construction
Notice Description
The contract will deliver a commissioned, weathertight and operational Pool Bunker above the base slab. The facility will support assembly, welding and inspection activities before modules are transferred to the Nuclear Island. The scope of works includes: * Primary steel frame and crane runway beams. * Rainscreen cladding and industrial doors, with precast cladding retained as the alternative envelope. * Five-section retractable roof. * Secondary steelwork platforms, working levels and access arrangements. * Mechanical, electrical and public health services, including local exhaust ventilation, power, lighting and controls. * Passenger and goods hoists, stair cores and roof access. * Installation and commissioning of three free-issued gantry cranes. * Tented workshop, lightning protection and earthing. * Testing, commissioning, quality records and formal handover. The base slab and the separate site non-destructive testing contract are outside this sourcing strategy. Their interfaces will be defined in the tender documents and managed through the contract programme. The key scope deliverables are: * Completed design to RIBA stage 4 and coordinated construction information. * Approved contractor programme aligned to project milestones. * Constructed and commissioned Pool Bunker, including roof, cranes, platforms, access and building services. * Completed health, safety, quality and assurance records. * Demonstrated interfaces with the base slab, utilities and non-destructive testing arrangements. * Formal handover following operational readiness review. The timescales are as follows: The Pool Bunker is required to support the planned assembly, welding and inspection of pool and tank liner modules before transfer to the Nuclear Island. The current estimated site construction period is: * 40 weeks for the preferred rainscreen and Safe RAD solution. * 46 weeks for the 275 mm precast fallback solution. The current target is for the Pool Bunker to be completed and handed over by 28 February 2028, ready to support the planned assembly, welding and inspection of pool and tank liner modules. The programme is dependent on completion of the base slab and availability of the K10 area and will be revalidated once the K10 release date is confirmed.
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-b5fd17-56721387-b61e-4164-a5d2-3509e5e4cbc9
- Publication Source
- Contracts Finder
- Latest Notice
- https://www.contractsfinder.service.gov.uk/Notice/0a92843d-9da8-4c16-b682-33b5d72727db
- Current Stage
- Tender
- All Stages
- Tender
Procurement Classification
- Notice Type
- Tender Notice
- Procurement Type
- Standard
- Procurement Category
- Goods
- Procurement Method
- Not Specified
- Procurement Method Details
- Tender Suitability
- SME
- Awardee Scale
- Not specified
Common Procurement Vocabulary (CPV)
- CPV Divisions
-
- CPV Codes
45210000 - Building construction work
Notice Value(s)
- Tender Value
- £20,000,000 £10M-£100M
- Lots Value
- Not specified
- Awards Value
- Not specified
- Contracts Value
- Not specified
Notice Dates
- Publication Date
- 19 Nov 20263 days ago
- Submission Deadline
- 25 Nov 20262 days to go
- Future Notice Date
- Not specified
- Award Date
- Not specified
- Contract Period
- 6 May 2027 - 31 Oct 2028 1-2 years
- Recurrence
- Not specified
Notice Status
- Tender Status
- Active
- Lots Status
- Not Specified
- Awards Status
- Not Specified
- Contracts Status
- Not Specified
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- Sizewell C Limited
- Contact Name
- Available with D3 Tenders Premium →
- Contact Email
- Available with D3 Tenders Premium →
- Contact Phone
- Available with D3 Tenders Premium →
Buyer Location
- Locality
- LONDON
- Postcode
- W1T 4EZ
- Postcode Area
- West London
- Country
- England
-
- Major Region (ITL 1)
- TLI London
- Basic Region (ITL 2)
- TLI3 Inner London - West
- Small Region (ITL 3)
- TLI36 Camden
- Delivery Location
- Not specified
-
- Local Authority
- Camden
- Electoral Ward
- Bloomsbury
- Westminster Constituency
- Holborn and St Pancras
Further Information
Notice Documents
-
https://www.contractsfinder.service.gov.uk/Notice/0a92843d-9da8-4c16-b682-33b5d72727db
19th November 2026 - Opportunity notice on Contracts Finder -
https://www.competefor.co.uk/business/viewOpportunityDetailsSupplier.html?id=123460057
Please follow this link to view the notice.
Open Contracting Data Standard (OCDS)
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.