A303 Sparkford to Ilchester Stage 6 Fibre Reinforced Concrete

GALLIFORD TRY

This public procurement record has 2 releases in its history.

TenderAmendment

18 Mar 2021 at 10:34

Tender

16 Apr 2020 at 13:41

Summary of the contracting process

The A303 Sparkford to Ilchester Stage 6 Fibre Reinforced Concrete tender is being managed by Galliford Try on behalf of Highways England in Somerset. This significant project involves the construction of a 5.6km dual lane carriageway designed to enhance connectivity between Mere and the Podimore Roundabout. Currently, the project is in the planning stage, awaiting approval for the Development Consent Order, which is expected in early Spring 2020. The anticipated start for the Fibre Reinforced Concrete works is set for autumn 2021, with a deadline for tender submissions on 30 April 2020.

This tender presents substantial opportunities for businesses, particularly those skilled in construction and reinforced-concrete works. Companies involved in managing, supplying labor, and providing materials for large-scale infrastructure projects would be well-suited to participate. Given the scale of the project, larger contractors and specialist subcontractors in the civil engineering domain may find suitable opportunities to expand their portfolio and secure significant contracts.

Find more tenders on our Open Data Platform.
How relevant is this notice?

D3 Tenders Premium

Win More Public Sector Contracts

AI-powered tender discovery, pipeline management, and market intelligence — everything you need to grow your public sector business.

Notice Title

A303 Sparkford to Ilchester Stage 6 Fibre Reinforced Concrete

Notice Description

NOTIFICATION OF SUBCONTRACT PACKAGE A303 Sparkford to Ilchester Galliford Try, as the South West Regional Delivery Partner are delivering the A303 Sparkford to Ilchester dualling project in the county of Somerset on behalf of Highways England. The project involves the design and construction of 5.6km of new dual lane all-purpose carriageway, connecting the existing dual carriageway at the Sparkford and Podimore Bypasses, therefore creating a continuous dual carriageway between Mere and the Podimore Roundabout. The project is currently awaiting the approval of the Development Consent Order from the Secretary of State for Transport and this is expected to be given in early Spring 2020. Subject to receiving approval, the project is forecast to commence on site in late summer 2020 and will take around 2 years to complete. Package: FRC Outline Scope of Works The FRC works consist of the management, labour, plant and materials required for Hazelgrove & Steart Hill bridge structures, all in accordance with the scope document contained and referred to within this enquiry document. The majority of the new A303 dual carriageway sits to the north of the existing A303 however the new and existing carriageways cross at approx. ch3300 & ch3750. Programme It is currently anticipated that the FRC works will commence in autumn 2021. Timings Deadline for Notifications of Interest 17:30hrs 23rd April 2020 Deadline for tender submission 17:30hrs 30th April 2020 If this package is of interest to your company please contact the Managing QS [Adrian Paddock] by e-mail on adrian.paddock@gallifordtry.co.uk, by the above deadline for notifications of interest and a link to the subcontract enquiry documentation can be issued. Additional information: NOTIFICATION OF SUBCONTRACT PACKAGE A303 Sparkford to Ilchester Galliford Try, as the South West Regional Delivery Partner are delivering the A303 Sparkford to Ilchester dualling project in the county of Somerset on behalf of Highways England. The project involves the design and construction of 5.6km of new dual lane all-purpose carriageway, connecting the existing dual carriageway at the Sparkford and Podimore Bypasses, therefore creating a continuous dual carriageway between Mere and the Podimore Roundabout. The project is currently awaiting the approval of the Development Consent Order from the Secretary of State for Transport and this is expected to be given in early Spring 2020. Subject to receiving approval, the project is forecast to commence on site in late summer 2020 and will take around 2 years to complete. Package: FRC Outline Scope of Works The FRC works consist of the management, labour, plant and materials required for Hazelgrove & Steart Hill bridge structures, all in accordance with the scope document contained and referred to within this enquiry document. The majority of the new A303 dual carriageway sits to the north of the existing A303 however the new and existing carriageways cross at approx. ch3300 & ch3750. Programme It is currently anticipated that the FRC works will commence in autumn 2021. Timings Deadline for Notifications of Interest 17:30hrs 23rd April 2020 Deadline for tender submission 17:30hrs 30th April 2020 If this package is of interest to your company please contact the Managing QS [Adrian Paddock] by e-mail on adrian.paddock@gallifordtry.co.uk, by the above deadline for notifications of interest and a link to the subcontract enquiry documentation can be issued.

Publication & Lifecycle

Open Contracting ID
ocds-b5fd17-68701afe-024c-4b0d-990a-db74c2fde115
Publication Source
Contracts Finder
Latest Notice
https://www.contractsfinder.service.gov.uk/Notice/1025414c-630d-4adb-a553-80d4527c7305
Current Stage
Tender
All Stages
Tender

Procurement Classification

Notice Type
Tender Notice
Procurement Type
Standard
Procurement Category
Works
Procurement Method
Open
Procurement Method Details
Open procedure (above threshold)
Tender Suitability
Not specified
Awardee Scale
Not specified

Common Procurement Vocabulary (CPV)

CPV Divisions

44 - Construction structures and materials; auxiliary products to construction (except electric apparatus)

45 - Construction work


CPV Codes

44114000 - Concrete

45262310 - Reinforced-concrete work

Notice Value(s)

Tender Value
Not specified
Lots Value
Not specified
Awards Value
Not specified
Contracts Value
Not specified

Notice Dates

Publication Date
18 Mar 20214 years ago
Submission Deadline
25 Mar 2021Expired
Future Notice Date
Not specified
Award Date
Not specified
Contract Period
31 Jul 2021 - 1 Jun 2022 6-12 months
Recurrence
Not specified

Notice Status

Tender Status
Active
Lots Status
Not Specified
Awards Status
Not Specified
Contracts Status
Not Specified

Contracting Authority (Buyer)

Main Buyer
GALLIFORD TRY
Contact Name
Adrian Paddock
Contact Email
adrian.paddock@gallifordtry.co.uk
Contact Phone
Not specified

Buyer Location

Locality
BRISTOL
Postcode
BS1 4DJ
Post Town
Bristol
Country
England

Major Region (ITL 1)
TLK South West (England)
Basic Region (ITL 2)
TLK5 West of England
Small Region (ITL 3)
TLK51 Bristol, City of
Delivery Location
TLK South West (England)

Local Authority
Bristol, City of
Electoral Ward
Central
Westminster Constituency
Bristol Central

Further Information

Notice Documents

Open Contracting Data Standard (OCDS)

View full OCDS Record for this contracting process

Download

The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.

{
    "tag": [
        "compiled"
    ],
    "id": "ocds-b5fd17-68701afe-024c-4b0d-990a-db74c2fde115-2021-03-18T10:34:11Z",
    "date": "2021-03-18T10:34:11Z",
    "ocid": "ocds-b5fd17-68701afe-024c-4b0d-990a-db74c2fde115",
    "language": "en",
    "initiationType": "tender",
    "tender": {
        "id": "HE013/Stage6/FRC",
        "title": "A303 Sparkford to Ilchester Stage 6 Fibre Reinforced Concrete",
        "description": "NOTIFICATION OF SUBCONTRACT PACKAGE A303 Sparkford to Ilchester Galliford Try, as the South West Regional Delivery Partner are delivering the A303 Sparkford to Ilchester dualling project in the county of Somerset on behalf of Highways England. The project involves the design and construction of 5.6km of new dual lane all-purpose carriageway, connecting the existing dual carriageway at the Sparkford and Podimore Bypasses, therefore creating a continuous dual carriageway between Mere and the Podimore Roundabout. The project is currently awaiting the approval of the Development Consent Order from the Secretary of State for Transport and this is expected to be given in early Spring 2020. Subject to receiving approval, the project is forecast to commence on site in late summer 2020 and will take around 2 years to complete. Package: FRC Outline Scope of Works The FRC works consist of the management, labour, plant and materials required for Hazelgrove & Steart Hill bridge structures, all in accordance with the scope document contained and referred to within this enquiry document. The majority of the new A303 dual carriageway sits to the north of the existing A303 however the new and existing carriageways cross at approx. ch3300 & ch3750. Programme It is currently anticipated that the FRC works will commence in autumn 2021. Timings Deadline for Notifications of Interest 17:30hrs 23rd April 2020 Deadline for tender submission 17:30hrs 30th April 2020 If this package is of interest to your company please contact the Managing QS [Adrian Paddock] by e-mail on adrian.paddock@gallifordtry.co.uk, by the above deadline for notifications of interest and a link to the subcontract enquiry documentation can be issued. Additional information: NOTIFICATION OF SUBCONTRACT PACKAGE A303 Sparkford to Ilchester Galliford Try, as the South West Regional Delivery Partner are delivering the A303 Sparkford to Ilchester dualling project in the county of Somerset on behalf of Highways England. The project involves the design and construction of 5.6km of new dual lane all-purpose carriageway, connecting the existing dual carriageway at the Sparkford and Podimore Bypasses, therefore creating a continuous dual carriageway between Mere and the Podimore Roundabout. The project is currently awaiting the approval of the Development Consent Order from the Secretary of State for Transport and this is expected to be given in early Spring 2020. Subject to receiving approval, the project is forecast to commence on site in late summer 2020 and will take around 2 years to complete. Package: FRC Outline Scope of Works The FRC works consist of the management, labour, plant and materials required for Hazelgrove & Steart Hill bridge structures, all in accordance with the scope document contained and referred to within this enquiry document. The majority of the new A303 dual carriageway sits to the north of the existing A303 however the new and existing carriageways cross at approx. ch3300 & ch3750. Programme It is currently anticipated that the FRC works will commence in autumn 2021. Timings Deadline for Notifications of Interest 17:30hrs 23rd April 2020 Deadline for tender submission 17:30hrs 30th April 2020 If this package is of interest to your company please contact the Managing QS [Adrian Paddock] by e-mail on adrian.paddock@gallifordtry.co.uk, by the above deadline for notifications of interest and a link to the subcontract enquiry documentation can be issued.",
        "datePublished": "2020-04-16T14:41:05+01:00",
        "status": "active",
        "classification": {
            "scheme": "CPV",
            "id": "44114000",
            "description": "Concrete"
        },
        "additionalClassifications": [
            {
                "scheme": "CPV",
                "id": "45262310",
                "description": "Reinforced-concrete work"
            }
        ],
        "items": [
            {
                "id": "1",
                "deliveryAddresses": [
                    {
                        "region": "South West",
                        "countryName": "United Kingdom"
                    },
                    {
                        "region": "South West",
                        "countryName": "United Kingdom"
                    }
                ]
            }
        ],
        "procurementMethod": "open",
        "procurementMethodDetails": "Open procedure (above threshold)",
        "tenderPeriod": {
            "endDate": "2021-03-25T23:59:59Z"
        },
        "contractPeriod": {
            "startDate": "2021-08-01T00:00:00+01:00",
            "endDate": "2022-06-01T23:59:59+01:00"
        },
        "suitability": {
            "sme": false,
            "vcse": false
        },
        "mainProcurementCategory": "works",
        "documents": [
            {
                "id": "1",
                "documentType": "tenderNotice",
                "description": "Opportunity notice on Contracts Finder",
                "url": "https://www.contractsfinder.service.gov.uk/Notice/1025414c-630d-4adb-a553-80d4527c7305",
                "datePublished": "2020-04-16T14:41:05+01:00",
                "format": "text/html",
                "language": "en",
                "dateModified": "2021-03-18T10:34:11Z"
            }
        ]
    },
    "parties": [
        {
            "id": "GB-SRS-supplierregistration.cabinetoffice.gov.uk/J5Wf5fFP",
            "name": "galliford try",
            "identifier": {
                "legalName": "galliford try",
                "scheme": "GB-SRS",
                "id": "supplierregistration.cabinetoffice.gov.uk/J5Wf5fFP"
            },
            "address": {
                "streetAddress": "5th Floor Broadquay House",
                "locality": "Bristol",
                "postalCode": "BS1 4DJ",
                "countryName": "England"
            },
            "contactPoint": {
                "name": "Adrian Paddock",
                "email": "Adrian.Paddock@gallifordtry.co.uk"
            },
            "roles": [
                "buyer"
            ]
        }
    ],
    "buyer": {
        "id": "GB-SRS-supplierregistration.cabinetoffice.gov.uk/J5Wf5fFP",
        "name": "galliford try"
    }
}