The procurement process involves a tender titled "Under Track Crossing of Utilities - Old Oak Common (S4) Station - HS2 Re-Issue," initiated by Balfour Beatty VINCI Systra JV, a strategic alliance focused on delivering major infrastructure projects for HS2. The contract falls within the construction industry category for tunnelling works, specifically involving the construction of eight under-track crossings using precast concrete pipes. Key dates include a tender submission deadline of 7 February 2020 and a contract period commencing from 16 March 2020, lasting until 7 December 2020. The project is located in London, United Kingdom, and has a value ranging from £5,000,000 to £10,000,000, indicating a significant contract opportunity for construction firms.

This tender represents a substantial opportunity for businesses specialising in construction, particularly those with competencies in tunnelling, micro boring, deep drainage, and working in railway environments. Companies that can demonstrate capabilities in safety, health, environment, and quality management (HSEQ), as well as temporary works design and approvals, would be well-suited to compete. Shortlisted applicants will be evaluated on various criteria, including commercial and methodological aspects, which highlights the competitive nature of the bidding process. This project is ideal for contractors looking to expand their portfolio in major infrastructure projects and gain experience within the HS2 initiative.

Find more tenders on our Open Data Platform.
How relevant is this notice?

D3 Tenders Premium

Win More Public Sector Contracts

AI-powered tender discovery, pipeline management, and market intelligence — everything you need to grow your public sector business.

Notice Title

Under Track Crossing of Utilities - Old Oak Common (S4) Station - HS2 Re-Issue

Notice Description

If you have submitted a response to our previous advertisement, you do not need to respond to this advertisement as well. Under Track Crossing of Utilities 8 Nr pipejacks under the GWML and North Depot railway to carry diverted utilities The UTX will be formed of 8 No. 1.2m internal diameter precast concrete pipes jacked through the ground below the GWML and North Pole (IEP) railway lines. Seven of the bores are to be constructed from a temporary steel sheet piled launch pit located adjacent to OOCL within the decommissioned Hex depot. They will be jacked approximately 175m to a reception pit located within the Wormwood Scrubs common land just south of the boundary to the IEP depot. The eighth bore, which is nearest to Old Oak Common Lane, is to be driven from reception pit located within Wormwood Scrubs land. This 160m long bore will terminate in a reception pit constructed just north of the out of use Down/Up Wycombe Line, railway embankment and adjacent to Old Oak Common Lane Commence works on site July 2020 with the construction of launch and reception pits, including site establishment by the sub-contractor. Commence pipe jacking October 2020, complete December 2020. Prior to this works the sub- contractor shall complete detailed planning, SHEQ documentation approval with all parties, temporary works design and approvals, fabrication design and approvals. The selected Supply Chain Partner must be able to demonstrate: Thames Water approved contractor Micro boring Specialist Deep Drainage Temporary Works Working in railway environment Dimensional Control About the buyer's selection process: Respondents to this opportunity should be advised that shortlisted applicants will be invited to tender through an external ERP system. The exact scoring criteria are currently being developed by BBVS, and shortlisted suppliers will be invited to register for the ERP system in due course. What is clear at this stage is that tenders will be scored competitively across a range of criteria, such as, but not limited to: HSEQ, Commercial, Programme, Methodology (particularly with working in a track environment). About the buyer: In 2018, Balfour Beatty, VINCI and Systra (BBVS) created a strategic alliance to deliver major infrastructure projects for HS2, in particular the Terminus at Old Oak Common. BBVS are committed to delivering this project to align with the key principles of Integrity, Leadership, Respect & Safety. Respondents to this opportunity should be advised that shortlisted applicants will be invited to tender through an external ERP system. The exact scoring criteria are currently being developed by BBVS, and shortlisted suppliers will be invited to register for the ERP system in due course. What is clear at this stage is that tenders will be scored competitively across a range of criteria, such as, but not limited to: Commercial, Programme, Methodology, HSEQ, Capability and Capacity. In 2018, Balfour Beatty, VINCI and Systra (BBVS) created a strategic alliance to deliver major infrastructure projects for HS2, in particular the Interchange at Old Oak Common.

Publication & Lifecycle

Open Contracting ID
ocds-b5fd17-770a90ca-409d-43b7-9bb9-cc35f9dbbf1b
Publication Source
Contracts Finder
Latest Notice
https://www.contractsfinder.service.gov.uk/Notice/dc89cc47-f1e5-4a01-b523-e7c9cdaea94b
Current Stage
Tender
All Stages
Tender

Procurement Classification

Notice Type
Tender Notice
Procurement Type
Standard
Procurement Category
Works
Procurement Method
Not Specified
Procurement Method Details
Tender Suitability
Not specified
Awardee Scale
Not specified

Common Procurement Vocabulary (CPV)

CPV Divisions

45 - Construction work


CPV Codes

45221200 - Construction work for tunnels, shafts and subways

45221240 - Construction work for tunnels

45221247 - Tunnelling works

Notice Value(s)

Tender Value
£10,000,000 £10M-£100M
Lots Value
Not specified
Awards Value
Not specified
Contracts Value
Not specified

Notice Dates

Publication Date
24 Jan 20206 years ago
Submission Deadline
7 Feb 2020Expired
Future Notice Date
Not specified
Award Date
Not specified
Contract Period
16 Mar 2020 - 7 Dec 2020 6-12 months
Recurrence
Not specified

Notice Status

Tender Status
Active
Lots Status
Not Specified
Awards Status
Not Specified
Contracts Status
Not Specified

Contracting Authority (Buyer)

Main Buyer
BALFOUR BEATTY VINCI SYSTRA JV
Contact Name
Manish Tailor
Contact Email
supplychain@bbvsjv.com
Contact Phone
07738982498

Buyer Location

Locality
WATFORD
Postcode
WD24 4WW
Post Town
Watford
Country
England

Major Region (ITL 1)
TLH East (England)
Basic Region (ITL 2)
TLH2 Bedfordshire and Hertfordshire
Small Region (ITL 3)
TLH27 South West Hertfordshire
Delivery Location
TLI London

Local Authority
Watford
Electoral Ward
Tudor
Westminster Constituency
Watford

Further Information

Notice Documents

Open Contracting Data Standard (OCDS)

View full OCDS Record for this contracting process

Download

The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.

{
    "tag": [
        "compiled"
    ],
    "id": "ocds-b5fd17-770a90ca-409d-43b7-9bb9-cc35f9dbbf1b-2020-01-24T15:40:05Z",
    "date": "2020-01-24T15:40:05Z",
    "ocid": "ocds-b5fd17-770a90ca-409d-43b7-9bb9-cc35f9dbbf1b",
    "language": "en",
    "initiationType": "tender",
    "tender": {
        "id": "C4N47638723",
        "title": "Under Track Crossing of Utilities - Old Oak Common (S4) Station - HS2 Re-Issue",
        "description": "If you have submitted a response to our previous advertisement, you do not need to respond to this advertisement as well. Under Track Crossing of Utilities 8 Nr pipejacks under the GWML and North Depot railway to carry diverted utilities The UTX will be formed of 8 No. 1.2m internal diameter precast concrete pipes jacked through the ground below the GWML and North Pole (IEP) railway lines. Seven of the bores are to be constructed from a temporary steel sheet piled launch pit located adjacent to OOCL within the decommissioned Hex depot. They will be jacked approximately 175m to a reception pit located within the Wormwood Scrubs common land just south of the boundary to the IEP depot. The eighth bore, which is nearest to Old Oak Common Lane, is to be driven from reception pit located within Wormwood Scrubs land. This 160m long bore will terminate in a reception pit constructed just north of the out of use Down/Up Wycombe Line, railway embankment and adjacent to Old Oak Common Lane Commence works on site July 2020 with the construction of launch and reception pits, including site establishment by the sub-contractor. Commence pipe jacking October 2020, complete December 2020. Prior to this works the sub- contractor shall complete detailed planning, SHEQ documentation approval with all parties, temporary works design and approvals, fabrication design and approvals. The selected Supply Chain Partner must be able to demonstrate: Thames Water approved contractor Micro boring Specialist Deep Drainage Temporary Works Working in railway environment Dimensional Control About the buyer's selection process: Respondents to this opportunity should be advised that shortlisted applicants will be invited to tender through an external ERP system. The exact scoring criteria are currently being developed by BBVS, and shortlisted suppliers will be invited to register for the ERP system in due course. What is clear at this stage is that tenders will be scored competitively across a range of criteria, such as, but not limited to: HSEQ, Commercial, Programme, Methodology (particularly with working in a track environment). About the buyer: In 2018, Balfour Beatty, VINCI and Systra (BBVS) created a strategic alliance to deliver major infrastructure projects for HS2, in particular the Terminus at Old Oak Common. BBVS are committed to delivering this project to align with the key principles of Integrity, Leadership, Respect & Safety. Respondents to this opportunity should be advised that shortlisted applicants will be invited to tender through an external ERP system. The exact scoring criteria are currently being developed by BBVS, and shortlisted suppliers will be invited to register for the ERP system in due course. What is clear at this stage is that tenders will be scored competitively across a range of criteria, such as, but not limited to: Commercial, Programme, Methodology, HSEQ, Capability and Capacity. In 2018, Balfour Beatty, VINCI and Systra (BBVS) created a strategic alliance to deliver major infrastructure projects for HS2, in particular the Interchange at Old Oak Common.",
        "datePublished": "2020-01-24T15:40:05Z",
        "status": "active",
        "classification": {
            "scheme": "CPV",
            "id": "45221200",
            "description": "Construction work for tunnels, shafts and subways"
        },
        "additionalClassifications": [
            {
                "scheme": "CPV",
                "id": "45221247",
                "description": "Tunnelling works"
            },
            {
                "scheme": "CPV",
                "id": "45221240",
                "description": "Construction work for tunnels"
            }
        ],
        "items": [
            {
                "id": "1",
                "deliveryAddresses": [
                    {
                        "region": "London",
                        "countryName": "United Kingdom"
                    }
                ]
            }
        ],
        "minValue": {
            "amount": 5000000,
            "currency": "GBP"
        },
        "value": {
            "amount": 10000000,
            "currency": "GBP"
        },
        "tenderPeriod": {
            "endDate": "2020-02-07T23:59:59Z"
        },
        "contractPeriod": {
            "startDate": "2020-03-16T00:00:00Z",
            "endDate": "2020-12-07T23:59:59Z"
        },
        "suitability": {
            "sme": false,
            "vcse": false
        },
        "mainProcurementCategory": "works",
        "documents": [
            {
                "id": "1",
                "documentType": "tenderNotice",
                "description": "Opportunity notice on Contracts Finder",
                "url": "https://www.contractsfinder.service.gov.uk/Notice/dc89cc47-f1e5-4a01-b523-e7c9cdaea94b",
                "datePublished": "2020-01-24T15:40:05Z",
                "format": "text/html",
                "language": "en"
            },
            {
                "id": "2",
                "documentType": "tenderNotice",
                "description": "Please follow this link to view the notice.",
                "url": "https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=47638729"
            }
        ]
    },
    "parties": [
        {
            "id": "GB-CFS-130527",
            "name": "Balfour Beatty VINCI Systra JV",
            "identifier": {
                "legalName": "Balfour Beatty VINCI Systra JV"
            },
            "address": {
                "streetAddress": "Astral House Imperial Way",
                "locality": "Watford",
                "postalCode": "WD244WW",
                "countryName": "UK"
            },
            "contactPoint": {
                "name": "Manish Tailor",
                "email": "supplychain@bbvsjv.com",
                "telephone": "07738982498"
            },
            "roles": [
                "buyer"
            ]
        }
    ],
    "buyer": {
        "id": "GB-CFS-130527",
        "name": "Balfour Beatty VINCI Systra JV"
    }
}