The procurement process involves the Defra Network eTendering Portal, seeking contractors for the project titled "B341A ISOLATORS Completion Works" in the engineering works and construction sector. The contract is located in the South East region of the United Kingdom, with a total value of £52,827. The tender period ended on 2 August 2018, while the contract was awarded on 3 August 2018, with completion scheduled for 3 September 2018. This procurement was conducted using a selective method, specifically as a call-off from a framework agreement.

This tender represents an excellent opportunity for businesses involved in engineering and construction services, particularly those with expertise in specialised systems and installation work. Small and medium-sized enterprises (SMEs) that offer innovative solutions and have experience in similar projects would be particularly well-suited to compete for this contract. Engaging in this project could enhance a business's portfolio and provide a pathway for future contracts within the public sector.

Find more tenders on our Open Data Platform.
How relevant is this notice?

D3 Tenders Premium

Win More Public Sector Contracts

AI-powered tender discovery, pipeline management, and market intelligence — everything you need to grow your public sector business.

Notice Title

B341A ISOLATORS Completion Works

Notice Description

1. Increase the water pressure through the hose sufficient for wash down on all isolators. Include for specification, installation, commissioning, and demonstration to end user of pressurised water supply and equipment. OUtline spec: a. Pressures and flows: to be calculated for the furthest Isolator from the pressurisation unit. b. Pressure: Around 1.5 to 2 barg c. Flow: Around 12-15 l/min d. Check ratings of all existing pipe, hoses, filters, nozzles to which the new proposed pressurisation unit will be connected. e. Specify system location and installation standards. f. Please submit a proposal for approval, which covers the areas 1-5 above. We are willing to be guided and advised by you/ your designers/ your suppliers on typical specifications for this type of system. Our outline specification is for guidance only on the type of system we think we require. 2. HAZOP29 Agree with end user (FW & SW) and supply 8-off suitable stands with lockable casters for 10L Aspirators for drinking water supply. 3. Secure fixtures of heat lamps to enable easier reattachment to the ceiling hooks during isolator use. 4. Each Isolator must slope to drain to enable removal of waste water. Specify, agree with user, install a system to create the slope, procure and install on all isolators 5. Specify, agree with user and provide cleaning tools to be able to clean the inside top of isolator during wash down procedure. 6. Specify, agree with end user and provide 2-off drain hoses and couplings to connect to the bottom outlet of any isolator. Modify isolator drain outlets to suit coupling. The hoses must be long enough to reach from any isolator to the drain in the lobby. 7. Carry out site acceptance testing of isolator from B265 suite 'c'. Document No: E4502-D002-B50 as noted in Earlier BCP. 8. Review with Merrick measurement of isolator dP during site visit. (Merrick readings were approximately 15 pa different to that of the isolator.) 9. Replace HEPA's in Isolator 4 with old HEPA's for wash test. After test re-install the clean HEPA's and recommission 10. Update of B50's fumigation software and test. (Defect FOC) 11. Investigate with Merrick and propose resolution of Chiller break-downs. 12. HAZOP18 Specify and agree with users a quick coupling system and hoses for the Isolator supply and extract connections. Agree with users number and length of hoses and supply these. Modify all flexible extract vent ducts to have male connections. Modify all flexible supply vent ducts to have female connections. Modify connection couplings on isolators to suit. Supply 12 extract hoses and 12 supply hoses. 13. HAZOP21 update drawing to show differential pressure indication across bag filter downstream of attenuator. 14. HAZOP33 Provide P&IDs showing all instrumentation and control signals for isolators and AHU/exhaust systems. The concern is that the current diagrams do not show sufficient information. 15. Update all O&M's and provide electronic copy in approved DEFR

Publication & Lifecycle

Open Contracting ID
ocds-b5fd17-7a5dbfe8-a69d-44ac-ba60-a5810ae5a9fc
Publication Source
Contracts Finder
Latest Notice
https://www.contractsfinder.service.gov.uk/Notice/40c41e51-859e-4780-9ad5-e07d03b33525
Current Stage
Award
All Stages
Award

Procurement Classification

Notice Type
Award Notice
Procurement Type
Framework
Procurement Category
Services
Procurement Method
Selective
Procurement Method Details
Call-off from a framework agreement
Tender Suitability
SME
Awardee Scale
Large

Common Procurement Vocabulary (CPV)

CPV Divisions

45 - Construction work


CPV Codes

45220000 - Engineering works and construction works

Notice Value(s)

Tender Value
£52,827 Under £100K
Lots Value
Not specified
Awards Value
£52,827 Under £100K
Contracts Value
Not specified

Notice Dates

Publication Date
16 Oct 20187 years ago
Submission Deadline
2 Aug 2018Expired
Future Notice Date
Not specified
Award Date
2 Aug 20187 years ago
Contract Period
2 Aug 2018 - 3 Sep 2018 1-6 months
Recurrence
Not specified

Notice Status

Tender Status
Complete
Lots Status
Not Specified
Awards Status
Active
Contracts Status
Not Specified

Contracting Authority (Buyer)

Main Buyer
DEFRA NETWORK ETENDERING PORTAL
Contact Name
Available with D3 Tenders Premium →
Contact Email
Available with D3 Tenders Premium →
Contact Phone
Available with D3 Tenders Premium →

Buyer Location

Locality
LONDON
Postcode
SW1P 3JR
Post Town
South West London
Country
England

Major Region (ITL 1)
TLI London
Basic Region (ITL 2)
TLI3 Inner London - West
Small Region (ITL 3)
TLI35 Westminster and City of London
Delivery Location
TLJ South East (England)

Local Authority
Westminster
Electoral Ward
St James's
Westminster Constituency
Cities of London and Westminster

Supplier Information

Number of Suppliers
1
Supplier Name

INTERSERVE FACILITIES

Open Contracting Data Standard (OCDS)

View full OCDS Record for this contracting process

Download

The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.

{
    "tag": [
        "compiled"
    ],
    "id": "ocds-b5fd17-7a5dbfe8-a69d-44ac-ba60-a5810ae5a9fc-2018-10-16T09:47:58+01:00",
    "date": "2018-10-16T09:47:58+01:00",
    "ocid": "ocds-b5fd17-7a5dbfe8-a69d-44ac-ba60-a5810ae5a9fc",
    "language": "en",
    "initiationType": "tender",
    "tender": {
        "id": "tender_176812/697714",
        "title": "B341A ISOLATORS Completion Works",
        "description": "1. Increase the water pressure through the hose sufficient for wash down on all isolators. Include for specification, installation, commissioning, and demonstration to end user of pressurised water supply and equipment. OUtline spec: a. Pressures and flows: to be calculated for the furthest Isolator from the pressurisation unit. b. Pressure: Around 1.5 to 2 barg c. Flow: Around 12-15 l/min d. Check ratings of all existing pipe, hoses, filters, nozzles to which the new proposed pressurisation unit will be connected. e. Specify system location and installation standards. f. Please submit a proposal for approval, which covers the areas 1-5 above. We are willing to be guided and advised by you/ your designers/ your suppliers on typical specifications for this type of system. Our outline specification is for guidance only on the type of system we think we require. 2. HAZOP29 Agree with end user (FW & SW) and supply 8-off suitable stands with lockable casters for 10L Aspirators for drinking water supply. 3. Secure fixtures of heat lamps to enable easier reattachment to the ceiling hooks during isolator use. 4. Each Isolator must slope to drain to enable removal of waste water. Specify, agree with user, install a system to create the slope, procure and install on all isolators 5. Specify, agree with user and provide cleaning tools to be able to clean the inside top of isolator during wash down procedure. 6. Specify, agree with end user and provide 2-off drain hoses and couplings to connect to the bottom outlet of any isolator. Modify isolator drain outlets to suit coupling. The hoses must be long enough to reach from any isolator to the drain in the lobby. 7. Carry out site acceptance testing of isolator from B265 suite 'c'. Document No: E4502-D002-B50 as noted in Earlier BCP. 8. Review with Merrick measurement of isolator dP during site visit. (Merrick readings were approximately 15 pa different to that of the isolator.) 9. Replace HEPA's in Isolator 4 with old HEPA's for wash test. After test re-install the clean HEPA's and recommission 10. Update of B50's fumigation software and test. (Defect FOC) 11. Investigate with Merrick and propose resolution of Chiller break-downs. 12. HAZOP18 Specify and agree with users a quick coupling system and hoses for the Isolator supply and extract connections. Agree with users number and length of hoses and supply these. Modify all flexible extract vent ducts to have male connections. Modify all flexible supply vent ducts to have female connections. Modify connection couplings on isolators to suit. Supply 12 extract hoses and 12 supply hoses. 13. HAZOP21 update drawing to show differential pressure indication across bag filter downstream of attenuator. 14. HAZOP33 Provide P&IDs showing all instrumentation and control signals for isolators and AHU/exhaust systems. The concern is that the current diagrams do not show sufficient information. 15. Update all O&M's and provide electronic copy in approved DEFR",
        "status": "complete",
        "classification": {
            "scheme": "CPV",
            "id": "45220000",
            "description": "Engineering works and construction works"
        },
        "items": [
            {
                "id": "1",
                "deliveryAddresses": [
                    {
                        "postalCode": "KT15 3NB"
                    },
                    {
                        "region": "South East",
                        "countryName": "United Kingdom"
                    }
                ]
            }
        ],
        "value": {
            "amount": 52827,
            "currency": "GBP"
        },
        "procurementMethod": "selective",
        "procurementMethodDetails": "Call-off from a framework agreement",
        "tenderPeriod": {
            "endDate": "2018-08-02T23:59:59+01:00"
        },
        "contractPeriod": {
            "startDate": "2018-08-03T00:00:00+01:00",
            "endDate": "2018-09-03T23:59:59+01:00"
        },
        "suitability": {
            "sme": true,
            "vcse": false
        },
        "mainProcurementCategory": "services"
    },
    "parties": [
        {
            "id": "GB-CFS-98436",
            "name": "Defra Network eTendering Portal",
            "identifier": {
                "legalName": "Defra Network eTendering Portal"
            },
            "address": {
                "streetAddress": "Noble House, 17 Smith Square, Westminster",
                "locality": "London",
                "postalCode": "SW1P 3JR",
                "countryName": "England"
            },
            "contactPoint": {
                "name": "Ash Paine",
                "email": "Network.Procurement@defra.gsi.gov.uk",
                "telephone": "00"
            },
            "roles": [
                "buyer"
            ]
        },
        {
            "id": "GB-CFS-98437",
            "name": "Interserve Facilities",
            "identifier": {
                "legalName": "Interserve Facilities"
            },
            "address": {
                "streetAddress": "19-21 Lyon Rd, London SW19 2RL"
            },
            "details": {
                "scale": "large",
                "vcse": false
            },
            "roles": [
                "supplier"
            ]
        }
    ],
    "buyer": {
        "id": "GB-CFS-98436",
        "name": "Defra Network eTendering Portal"
    },
    "awards": [
        {
            "id": "ocds-b5fd17-7a5dbfe8-a69d-44ac-ba60-a5810ae5a9fc-1",
            "status": "active",
            "date": "2018-08-03T00:00:00+01:00",
            "datePublished": "2018-10-16T09:47:58+01:00",
            "value": {
                "amount": 52827,
                "currency": "GBP"
            },
            "suppliers": [
                {
                    "id": "GB-CFS-98437",
                    "name": "Interserve Facilities"
                }
            ],
            "contractPeriod": {
                "startDate": "2018-08-03T00:00:00+01:00",
                "endDate": "2018-09-03T23:59:59+01:00"
            },
            "documents": [
                {
                    "id": "1",
                    "documentType": "awardNotice",
                    "description": "Awarded contract notice on Contracts Finder",
                    "url": "https://www.contractsfinder.service.gov.uk/Notice/40c41e51-859e-4780-9ad5-e07d03b33525",
                    "datePublished": "2018-10-16T09:47:58+01:00",
                    "format": "text/html",
                    "language": "en"
                },
                {
                    "id": "2",
                    "documentType": "tenderNotice",
                    "description": "n/a",
                    "url": "https://www.contractsfinder.service.gov.uk/Notice/Attachment/10ffcc21-38cd-4970-82b3-bb9203db67e4",
                    "format": "application/pdf"
                }
            ]
        }
    ]
}