Tender

A303 Sparkford to Ilchester Stage 6 Vehicle Restraint Systems

GALLIFORD TRY

This public procurement record has 2 releases in its history.

TenderAmendment

18 Mar 2021 at 11:44

Tender

25 Mar 2020 at 13:11

Summary of the contracting process

The procurement process for the "A303 Sparkford to Ilchester Stage 6 Vehicle Restraint Systems" is being conducted by Galliford Try, acting as the South West Regional Delivery Partner on behalf of Highways England. This project, located in Somerset, involves the design and construction of 5.6 km of a new dual lane all-purpose carriageway. Currently at the Tender stage, this package focuses on road barrier installation, with submission deadlines set for 7th April 2020. The anticipated start date for the works is early 2022, following the expected approval of the Development Consent Order in early Spring 2020.

This tender presents robust opportunities for businesses involved in road construction and safety systems, particularly those specialising in road restraint barriers. Companies that offer installation services, manufacturing of safety equipment, or subcontracting abilities in civil engineering will find this project aligns well with their capabilities. Engaging in this procurement can lead to significant business growth through collaboration and participation in government-backed infrastructure projects.

Find more tenders on our Open Data Platform.
How relevant is this notice?

D3 Tenders Premium

Win More Public Sector Contracts

AI-powered tender discovery, pipeline management, and market intelligence — everything you need to grow your public sector business.

Notice Title

A303 Sparkford to Ilchester Stage 6 Vehicle Restraint Systems

Notice Description

NOTIFICATION OF SUBCONTRACT PACKAGE A303 Sparkford to Ilchester Galliford Try, as the South West Regional Delivery Partner are delivering the A303 Sparkford to Ilchester dualling project in the county of Somerset on behalf of Highways England. The project involves the design and construction of 5.6km of new dual lane all-purpose carriageway, connecting the existing dual carriageway at the Sparkford and Podimore Bypasses, therefore creating a continuous dual carriageway between Mere and the Podimore Roundabout. The project is currently awaiting the approval of the Development Consent Order from the Secretary of State for Transport and this is expected to be given in early Spring 2020. Subject to receiving approval, the project is forecast to commence on site in late summer 2020 and will take around 2 years to complete. Package: ROAD RESTRAINT BARRIERS Outline Scope of Works The VRS barrier works consist of the supply and installation of road restraint systems all in accordance with the scope document contained and referred to within this enquiry document. The majority of the new A303 dual carriageway sits to the north of the existing A303 however the new and existing carriageways cross at approx. ch3300 & ch3750. Programme It is currently anticipated that the Road Restraint Barrier works will commence in early 2022. Timings Deadline for Notifications of Interest 17:30hrs Tuesday 31st March 2020 Deadline for tender submission 17:30hrs Tuesday 7th April 2020 If this package is of interest to your company please contact the Managing QS [Adrian Paddock] by e-mail on adrian.paddock@gallifordtry.co.uk, by the above deadline for notifications of interest and a link to the subcontract enquiry documentation can be issued. Additional information: NOTIFICATION OF SUBCONTRACT PACKAGE A303 Sparkford to Ilchester Galliford Try, as the South West Regional Delivery Partner are delivering the A303 Sparkford to Ilchester dualling project in the county of Somerset on behalf of Highways England. The project involves the design and construction of 5.6km of new dual lane all-purpose carriageway, connecting the existing dual carriageway at the Sparkford and Podimore Bypasses, therefore creating a continuous dual carriageway between Mere and the Podimore Roundabout. The project is currently awaiting the approval of the Development Consent Order from the Secretary of State for Transport and this is expected to be given in early Spring 2020. Subject to receiving approval, the project is forecast to commence on site in late summer 2020 and will take around 2 years to complete. Package: ROAD RESTRAINT BARRIERS Outline Scope of Works The VRS barrier works consist of the supply and installation of road restraint systems all in accordance with the scope document contained and referred to within this enquiry document. The majority of the new A303 dual carriageway sits to the north of the existing A303 however the new and existing carriageways cross at approx. ch3300 & ch3750. Programme It is currently anticipated that the Road Restraint Barrier works will commence in early 2022. Timings Deadline for Notifications of Interest 17:30hrs Tuesday 31st March 2020 Deadline for tender submission 17:30hrs Tuesday 7th April 2020 If this package is of interest to your company please contact the Managing QS [Adrian Paddock] by e-mail on adrian.paddock@gallifordtry.co.uk, by the above deadline for notifications of interest and a link to the subcontract enquiry documentation can be issued.

Publication & Lifecycle

Open Contracting ID
ocds-b5fd17-8b103cb0-f288-4e13-90b4-48a7a9a29c94
Publication Source
Contracts Finder
Latest Notice
https://www.contractsfinder.service.gov.uk/Notice/1a9ade71-bc0d-4239-b1d5-57e841283ea1
Current Stage
Tender
All Stages
Tender

Procurement Classification

Notice Type
Tender Notice
Procurement Type
Standard
Procurement Category
Works
Procurement Method
Open
Procurement Method Details
Open procedure (above threshold)
Tender Suitability
Not specified
Awardee Scale
Not specified

Common Procurement Vocabulary (CPV)

CPV Divisions

34 - Transport equipment and auxiliary products to transportation


CPV Codes

34928110 - Road barriers

Notice Value(s)

Tender Value
Not specified
Lots Value
Not specified
Awards Value
Not specified
Contracts Value
Not specified

Notice Dates

Publication Date
18 Mar 20214 years ago
Submission Deadline
8 Mar 2021Expired
Future Notice Date
Not specified
Award Date
Not specified
Contract Period
1 Feb 2022 - 1 Aug 2022 6-12 months
Recurrence
Not specified

Notice Status

Tender Status
Active
Lots Status
Not Specified
Awards Status
Not Specified
Contracts Status
Not Specified

Contracting Authority (Buyer)

Main Buyer
GALLIFORD TRY
Contact Name
Available with D3 Tenders Premium →
Contact Email
Available with D3 Tenders Premium →
Contact Phone
Available with D3 Tenders Premium →

Buyer Location

Locality
BRISTOL
Postcode
BS1 4DJ
Post Town
Bristol
Country
England

Major Region (ITL 1)
TLK South West (England)
Basic Region (ITL 2)
TLK5 West of England
Small Region (ITL 3)
TLK51 Bristol, City of
Delivery Location
TLK South West (England)

Local Authority
Bristol, City of
Electoral Ward
Central
Westminster Constituency
Bristol Central

Further Information

Notice Documents

Open Contracting Data Standard (OCDS)

View full OCDS Record for this contracting process

Download

The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.

{
    "tag": [
        "compiled"
    ],
    "id": "ocds-b5fd17-8b103cb0-f288-4e13-90b4-48a7a9a29c94-2021-03-18T11:44:45Z",
    "date": "2021-03-18T11:44:45Z",
    "ocid": "ocds-b5fd17-8b103cb0-f288-4e13-90b4-48a7a9a29c94",
    "language": "en",
    "initiationType": "tender",
    "tender": {
        "id": "HE013/Stage6/VehicleRestraintSystems",
        "title": "A303 Sparkford to Ilchester Stage 6 Vehicle Restraint Systems",
        "description": "NOTIFICATION OF SUBCONTRACT PACKAGE A303 Sparkford to Ilchester Galliford Try, as the South West Regional Delivery Partner are delivering the A303 Sparkford to Ilchester dualling project in the county of Somerset on behalf of Highways England. The project involves the design and construction of 5.6km of new dual lane all-purpose carriageway, connecting the existing dual carriageway at the Sparkford and Podimore Bypasses, therefore creating a continuous dual carriageway between Mere and the Podimore Roundabout. The project is currently awaiting the approval of the Development Consent Order from the Secretary of State for Transport and this is expected to be given in early Spring 2020. Subject to receiving approval, the project is forecast to commence on site in late summer 2020 and will take around 2 years to complete. Package: ROAD RESTRAINT BARRIERS Outline Scope of Works The VRS barrier works consist of the supply and installation of road restraint systems all in accordance with the scope document contained and referred to within this enquiry document. The majority of the new A303 dual carriageway sits to the north of the existing A303 however the new and existing carriageways cross at approx. ch3300 & ch3750. Programme It is currently anticipated that the Road Restraint Barrier works will commence in early 2022. Timings Deadline for Notifications of Interest 17:30hrs Tuesday 31st March 2020 Deadline for tender submission 17:30hrs Tuesday 7th April 2020 If this package is of interest to your company please contact the Managing QS [Adrian Paddock] by e-mail on adrian.paddock@gallifordtry.co.uk, by the above deadline for notifications of interest and a link to the subcontract enquiry documentation can be issued. Additional information: NOTIFICATION OF SUBCONTRACT PACKAGE A303 Sparkford to Ilchester Galliford Try, as the South West Regional Delivery Partner are delivering the A303 Sparkford to Ilchester dualling project in the county of Somerset on behalf of Highways England. The project involves the design and construction of 5.6km of new dual lane all-purpose carriageway, connecting the existing dual carriageway at the Sparkford and Podimore Bypasses, therefore creating a continuous dual carriageway between Mere and the Podimore Roundabout. The project is currently awaiting the approval of the Development Consent Order from the Secretary of State for Transport and this is expected to be given in early Spring 2020. Subject to receiving approval, the project is forecast to commence on site in late summer 2020 and will take around 2 years to complete. Package: ROAD RESTRAINT BARRIERS Outline Scope of Works The VRS barrier works consist of the supply and installation of road restraint systems all in accordance with the scope document contained and referred to within this enquiry document. The majority of the new A303 dual carriageway sits to the north of the existing A303 however the new and existing carriageways cross at approx. ch3300 & ch3750. Programme It is currently anticipated that the Road Restraint Barrier works will commence in early 2022. Timings Deadline for Notifications of Interest 17:30hrs Tuesday 31st March 2020 Deadline for tender submission 17:30hrs Tuesday 7th April 2020 If this package is of interest to your company please contact the Managing QS [Adrian Paddock] by e-mail on adrian.paddock@gallifordtry.co.uk, by the above deadline for notifications of interest and a link to the subcontract enquiry documentation can be issued.",
        "datePublished": "2020-03-25T13:11:15Z",
        "status": "active",
        "classification": {
            "scheme": "CPV",
            "id": "34928110",
            "description": "Road barriers"
        },
        "items": [
            {
                "id": "1",
                "deliveryAddresses": [
                    {
                        "region": "South West",
                        "countryName": "United Kingdom"
                    },
                    {
                        "region": "South West",
                        "countryName": "United Kingdom"
                    }
                ]
            }
        ],
        "procurementMethod": "open",
        "procurementMethodDetails": "Open procedure (above threshold)",
        "tenderPeriod": {
            "endDate": "2021-03-08T23:59:59Z"
        },
        "contractPeriod": {
            "startDate": "2022-02-01T00:00:00Z",
            "endDate": "2022-08-01T23:59:59+01:00"
        },
        "suitability": {
            "sme": false,
            "vcse": false
        },
        "mainProcurementCategory": "works",
        "documents": [
            {
                "id": "1",
                "documentType": "tenderNotice",
                "description": "Opportunity notice on Contracts Finder",
                "url": "https://www.contractsfinder.service.gov.uk/Notice/1a9ade71-bc0d-4239-b1d5-57e841283ea1",
                "datePublished": "2020-03-25T13:11:15Z",
                "format": "text/html",
                "language": "en",
                "dateModified": "2021-03-18T11:44:45Z"
            }
        ]
    },
    "parties": [
        {
            "id": "GB-SRS-supplierregistration.cabinetoffice.gov.uk/J5Wf5fFP",
            "name": "galliford try",
            "identifier": {
                "legalName": "galliford try",
                "scheme": "GB-SRS",
                "id": "supplierregistration.cabinetoffice.gov.uk/J5Wf5fFP"
            },
            "address": {
                "streetAddress": "5th Floor Bristol Broad Quay House, Prince Street",
                "locality": "Bristol",
                "postalCode": "BS1 4DJ",
                "countryName": "England"
            },
            "contactPoint": {
                "name": "Adrian Paddock",
                "email": "Adrian.Paddock@gallifordtry.co.uk"
            },
            "roles": [
                "buyer"
            ]
        }
    ],
    "buyer": {
        "id": "GB-SRS-supplierregistration.cabinetoffice.gov.uk/J5Wf5fFP",
        "name": "galliford try"
    }
}