A303 Sparkford to Ilchester Dualling Steel Bridge Beam Supply & Install

GALLIFORD TRY

This public procurement record has 2 releases in its history.

TenderAmendment

18 Mar 2021 at 10:37

Tender

07 Apr 2020 at 11:50

Summary of the contracting process

The procurement process is being conducted by Galliford Try on behalf of Highways England for the A303 Sparkford to Ilchester Dualling project in Somerset, United Kingdom. This tender, identified as "A303 Sparkford to Ilchester Dualling Steel Bridge Beam Supply & Install," is part of an open procedure and is currently in the tender stage. The deadline for tender submission is set for 17:30 on 16th April 2020, while the anticipated contract period is from 1st December 2021 to 1st March 2022. The project involves the construction of a 5.6km dual lane carriageway, with the bridge beam supply expected to commence in late 2021 or early 2022.

This tender presents significant opportunities for businesses operating in the construction and engineering sectors, particularly those with expertise in steel bridge works. Suppliers capable of fabricating, delivering, and erecting steel beams, along with necessary lifting equipment, would be well-suited to compete for this contract. Engaging in this project can help businesses expand their portfolios, enhance their experience in infrastructure projects, and strengthen their relationships with major contractors like Galliford Try.

Find more tenders on our Open Data Platform.
How relevant is this notice?

D3 Tenders Premium

Win More Public Sector Contracts

AI-powered tender discovery, pipeline management, and market intelligence — everything you need to grow your public sector business.

Notice Title

A303 Sparkford to Ilchester Dualling Steel Bridge Beam Supply & Install

Notice Description

NOTIFICATION OF SUBCONTRACT PACKAGE A303 Sparkford to Ilchester Galliford Try, as the South West Regional Delivery Partner are delivering the A303 Sparkford to Ilchester dualling project in the county of Somerset on behalf of Highways England. The project involves the design and construction of 5.6km of new dual lane all-purpose carriageway, connecting the existing dual carriageway at the Sparkford and Podimore Bypasses, therefore creating a continuous dual carriageway between Mere and the Podimore Roundabout. The project is currently awaiting the approval of the Development Consent Order from the Secretary of State for Transport and this is expected to be given in early Spring 2020. Subject to receiving approval, the project is forecast to commence on site in late summer 2020 and will take around 2 years to complete. Package: STEEL BRIDGE BEAM SUPPLY & INSTALL Outline Scope of Works The steel bridge beam scope includes fabricate, delivery and erection [including all necessary craneage and lifting] of the steel beams to Steart Hill bridge all in accordance with the scope documents contained and referred to within this enquiry document. The majority of the new A303 dual carriageway sits to the north of the existing A303 however the new and existing carriageways cross at approx. ch3300 & ch3750. Programme It is currently anticipated that the steel bridge beam works will commence in late 2021 /early 2022. Timings Deadline for Notifications of Interest 17:30hrs 11th April 2020 Deadline for tender submission 17:30hrs 16th April 2020 If this package is of interest to your company please contact the Managing QS [Adrian Paddock] by e-mail on adrian.paddock@gallifordtry.co.uk, by the above deadline for notifications of interest and a link to the subcontract enquiry documentation can be issued. Additional information: NOTIFICATION OF SUBCONTRACT PACKAGE A303 Sparkford to Ilchester Galliford Try, as the South West Regional Delivery Partner are delivering the A303 Sparkford to Ilchester dualling project in the county of Somerset on behalf of Highways England. The project involves the design and construction of 5.6km of new dual lane all-purpose carriageway, connecting the existing dual carriageway at the Sparkford and Podimore Bypasses, therefore creating a continuous dual carriageway between Mere and the Podimore Roundabout. The project is currently awaiting the approval of the Development Consent Order from the Secretary of State for Transport and this is expected to be given in early Spring 2020. Subject to receiving approval, the project is forecast to commence on site in late summer 2020 and will take around 2 years to complete. Package: STEEL BRIDGE BEAM SUPPLY & INSTALL Outline Scope of Works The steel bridge beam scope includes fabricate, delivery and erection [including all necessary craneage and lifting] of the steel beams to Steart Hill bridge all in accordance with the scope documents contained and referred to within this enquiry document. The majority of the new A303 dual carriageway sits to the north of the existing A303 however the new and existing carriageways cross at approx. ch3300 & ch3750. Programme It is currently anticipated that the steel bridge beam works will commence in late 2021 /early 2022. Timings Deadline for Notifications of Interest 17:30hrs 11th April 2020 Deadline for tender submission 17:30hrs 16th April 2020 If this package is of interest to your company please contact the Managing QS [Adrian Paddock] by e-mail on adrian.paddock@gallifordtry.co.uk, by the above deadline for notifications of interest and a link to the subcontract enquiry documentation can be issued.

Publication & Lifecycle

Open Contracting ID
ocds-b5fd17-c2e226ce-4f7c-4a0b-8547-8a04e89261f4
Publication Source
Contracts Finder
Latest Notice
https://www.contractsfinder.service.gov.uk/Notice/b74781ab-941c-4a5a-9d1e-ce20513c110a
Current Stage
Tender
All Stages
Tender

Procurement Classification

Notice Type
Tender Notice
Procurement Type
Standard
Procurement Category
Works
Procurement Method
Open
Procurement Method Details
Open procedure (above threshold)
Tender Suitability
Not specified
Awardee Scale
Not specified

Common Procurement Vocabulary (CPV)

CPV Divisions

45 - Construction work


CPV Codes

45221115 - Construction work for steel bridges

Notice Value(s)

Tender Value
Not specified
Lots Value
Not specified
Awards Value
Not specified
Contracts Value
Not specified

Notice Dates

Publication Date
18 Mar 20214 years ago
Submission Deadline
25 Mar 2021Expired
Future Notice Date
Not specified
Award Date
Not specified
Contract Period
1 Dec 2021 - 1 Mar 2022 1-6 months
Recurrence
Not specified

Notice Status

Tender Status
Active
Lots Status
Not Specified
Awards Status
Not Specified
Contracts Status
Not Specified

Contracting Authority (Buyer)

Main Buyer
GALLIFORD TRY
Contact Name
Adrian Paddock
Contact Email
adrian.paddock@gallifordtry.co.uk
Contact Phone
Not specified

Buyer Location

Locality
BRISTOL
Postcode
BS1 4DJ
Post Town
Bristol
Country
England

Major Region (ITL 1)
TLK South West (England)
Basic Region (ITL 2)
TLK5 West of England
Small Region (ITL 3)
TLK51 Bristol, City of
Delivery Location
TLK South West (England)

Local Authority
Bristol, City of
Electoral Ward
Central
Westminster Constituency
Bristol Central

Further Information

Notice Documents

Open Contracting Data Standard (OCDS)

View full OCDS Record for this contracting process

Download

The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.

{
    "tag": [
        "compiled"
    ],
    "id": "ocds-b5fd17-c2e226ce-4f7c-4a0b-8547-8a04e89261f4-2021-03-18T10:37:21Z",
    "date": "2021-03-18T10:37:21Z",
    "ocid": "ocds-b5fd17-c2e226ce-4f7c-4a0b-8547-8a04e89261f4",
    "language": "en",
    "initiationType": "tender",
    "tender": {
        "id": "HE013/Stage6/Steel Bridge Beam Supply & Install",
        "title": "A303 Sparkford to Ilchester Dualling Steel Bridge Beam Supply & Install",
        "description": "NOTIFICATION OF SUBCONTRACT PACKAGE A303 Sparkford to Ilchester Galliford Try, as the South West Regional Delivery Partner are delivering the A303 Sparkford to Ilchester dualling project in the county of Somerset on behalf of Highways England. The project involves the design and construction of 5.6km of new dual lane all-purpose carriageway, connecting the existing dual carriageway at the Sparkford and Podimore Bypasses, therefore creating a continuous dual carriageway between Mere and the Podimore Roundabout. The project is currently awaiting the approval of the Development Consent Order from the Secretary of State for Transport and this is expected to be given in early Spring 2020. Subject to receiving approval, the project is forecast to commence on site in late summer 2020 and will take around 2 years to complete. Package: STEEL BRIDGE BEAM SUPPLY & INSTALL Outline Scope of Works The steel bridge beam scope includes fabricate, delivery and erection [including all necessary craneage and lifting] of the steel beams to Steart Hill bridge all in accordance with the scope documents contained and referred to within this enquiry document. The majority of the new A303 dual carriageway sits to the north of the existing A303 however the new and existing carriageways cross at approx. ch3300 & ch3750. Programme It is currently anticipated that the steel bridge beam works will commence in late 2021 /early 2022. Timings Deadline for Notifications of Interest 17:30hrs 11th April 2020 Deadline for tender submission 17:30hrs 16th April 2020 If this package is of interest to your company please contact the Managing QS [Adrian Paddock] by e-mail on adrian.paddock@gallifordtry.co.uk, by the above deadline for notifications of interest and a link to the subcontract enquiry documentation can be issued. Additional information: NOTIFICATION OF SUBCONTRACT PACKAGE A303 Sparkford to Ilchester Galliford Try, as the South West Regional Delivery Partner are delivering the A303 Sparkford to Ilchester dualling project in the county of Somerset on behalf of Highways England. The project involves the design and construction of 5.6km of new dual lane all-purpose carriageway, connecting the existing dual carriageway at the Sparkford and Podimore Bypasses, therefore creating a continuous dual carriageway between Mere and the Podimore Roundabout. The project is currently awaiting the approval of the Development Consent Order from the Secretary of State for Transport and this is expected to be given in early Spring 2020. Subject to receiving approval, the project is forecast to commence on site in late summer 2020 and will take around 2 years to complete. Package: STEEL BRIDGE BEAM SUPPLY & INSTALL Outline Scope of Works The steel bridge beam scope includes fabricate, delivery and erection [including all necessary craneage and lifting] of the steel beams to Steart Hill bridge all in accordance with the scope documents contained and referred to within this enquiry document. The majority of the new A303 dual carriageway sits to the north of the existing A303 however the new and existing carriageways cross at approx. ch3300 & ch3750. Programme It is currently anticipated that the steel bridge beam works will commence in late 2021 /early 2022. Timings Deadline for Notifications of Interest 17:30hrs 11th April 2020 Deadline for tender submission 17:30hrs 16th April 2020 If this package is of interest to your company please contact the Managing QS [Adrian Paddock] by e-mail on adrian.paddock@gallifordtry.co.uk, by the above deadline for notifications of interest and a link to the subcontract enquiry documentation can be issued.",
        "datePublished": "2020-04-07T12:50:26+01:00",
        "status": "active",
        "classification": {
            "scheme": "CPV",
            "id": "45221115",
            "description": "Construction work for steel bridges"
        },
        "items": [
            {
                "id": "1",
                "deliveryAddresses": [
                    {
                        "region": "South West",
                        "countryName": "United Kingdom"
                    },
                    {
                        "region": "South West",
                        "countryName": "United Kingdom"
                    }
                ]
            }
        ],
        "procurementMethod": "open",
        "procurementMethodDetails": "Open procedure (above threshold)",
        "tenderPeriod": {
            "endDate": "2021-03-25T23:59:59Z"
        },
        "contractPeriod": {
            "startDate": "2021-12-01T00:00:00Z",
            "endDate": "2022-03-01T23:59:59Z"
        },
        "suitability": {
            "sme": false,
            "vcse": false
        },
        "mainProcurementCategory": "works",
        "documents": [
            {
                "id": "1",
                "documentType": "tenderNotice",
                "description": "Opportunity notice on Contracts Finder",
                "url": "https://www.contractsfinder.service.gov.uk/Notice/b74781ab-941c-4a5a-9d1e-ce20513c110a",
                "datePublished": "2020-04-07T12:50:26+01:00",
                "format": "text/html",
                "language": "en",
                "dateModified": "2021-03-18T10:37:21Z"
            }
        ]
    },
    "parties": [
        {
            "id": "GB-SRS-supplierregistration.cabinetoffice.gov.uk/J5Wf5fFP",
            "name": "galliford try",
            "identifier": {
                "legalName": "galliford try",
                "scheme": "GB-SRS",
                "id": "supplierregistration.cabinetoffice.gov.uk/J5Wf5fFP"
            },
            "address": {
                "streetAddress": "5th Floor, Broad Quay House",
                "locality": "Bristol",
                "postalCode": "BS1 4DJ",
                "countryName": "England"
            },
            "contactPoint": {
                "name": "Adrian Paddock",
                "email": "Adrian.Paddock@gallifordtry.co.uk"
            },
            "roles": [
                "buyer"
            ]
        }
    ],
    "buyer": {
        "id": "GB-SRS-supplierregistration.cabinetoffice.gov.uk/J5Wf5fFP",
        "name": "galliford try"
    }
}