Notice Information
Notice Title
Hammerton Greenway Green Hammerton and Thorpe Underwood
Notice Description
It is proposed to construct a Greenway from Green Hammerton to Thorpe Underwood. The village of Green Hammerton is located adjacent to the A59 between Harrogate and York. A location plan of the route is shown heavily dotted on the map above. The 1.7 km route will be suitable for cyclists, walkers, wheelchair and mobility scooter users. The surface will be durable all-weather crushed stone, up to 2m wide, with mown verges either side, giving a total width of 5m. The majority of the route will be an upgrade to existing farm track and public footpath; 2 sections, some 600m in total, create a new route. The route is established by two agreements: the 'Dedication of Public Highway: Creation of Cycletrack in the Parish of Green Hammerton', signed 2018 between North Yorkshire County Council, and two landowners whose tracks are crossed by the route, and the 'Public Path Creation Agreement Pursuant to Section 30 of the Highways Act 1980' signed 2016 by Little Ouseburn, Kirby Hall and Thorpe Underwood Parish Council and Foxlow Ltd. Planning permission has been granted for the route by North Yorkshire Council. 2. CLIENT The Client for the Works is Green Hammerton Parish Council. 3. OTHER PARTIES WITH AN INTEREST North Yorkshire Council are funding the majority of the scheme from Developer Contributions arising from new housebuilding. As such they have requirements on how the funds are managed and issued. The Internal Drainage Board have in interest insofar as the route crosses a beck and there are also concerns that the surface of the track should be sufficiently permeable to prevent excess run-off. 4. SCOPE OF WORK The length of construction is 1.726 km. The majority of the construction will be a 2.0m wide permeable stone surface. The material for the surface will be a type 3 material (with a 30% voids ratio), to be agreed with the Internal Drainage Board before commencement of work. A section of 178m of existing farm track at the south end is being optionally considered for bitmac surfacing or similar. Also included is the provision of a new timber preformed bridge over a beck. The bridge will be no more than 1.5m wide, and its design will be agreed in advance with the Internal Drainage Board. Three piped ditch crossings will also be required, and three points on the Greenway will need appropriate reinforcement to allow tractors and other farm machinery to cross. Post and plain wire fencing will be required where the route crosses one field. Other stretches may need to be fenced subject to discussion. Timber bollards will be required at the ends of the cycleway to prevent vehicular access. Some cutting back of overhanging branches and overgrown hedges will be necessary, and this work will need to be undertaken after the nesting season.
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-b5fd17-c87a9e30-8dae-4a5a-bd86-748f30942275
- Publication Source
- Contracts Finder
- Latest Notice
- https://www.contractsfinder.service.gov.uk/Notice/2a868336-4e5e-4a78-8fec-353610eecfaa
- Current Stage
- Planning
- All Stages
- Planning
Procurement Classification
- Notice Type
- Market Engagement Notice
- Procurement Type
- Standard
- Procurement Category
- Not specified
- Procurement Method
- Not Specified
- Procurement Method Details
- Not specified
- Tender Suitability
- SME, VCSE
- Awardee Scale
- Not specified
Common Procurement Vocabulary (CPV)
- CPV Divisions
45 - Construction work
-
- CPV Codes
45000000 - Construction work
Notice Value(s)
- Tender Value
- Not specified
- Lots Value
- Not specified
- Awards Value
- Not specified
- Contracts Value
- Not specified
Notice Dates
- Publication Date
- 24 Jan 20242 years ago
- Submission Deadline
- Not specified
- Future Notice Date
- 30 Apr 2024Expired
- Award Date
- Not specified
- Contract Period
- Not specified - Not specified
- Recurrence
- Not specified
Notice Status
- Tender Status
- Planning
- Lots Status
- Not Specified
- Awards Status
- Not Specified
- Contracts Status
- Not Specified
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- GREEN HAMMERTON PARISH COUNCIL
- Contact Name
- Available with D3 Tenders Premium →
- Contact Email
- Available with D3 Tenders Premium →
- Contact Phone
- Available with D3 Tenders Premium →
Buyer Location
- Locality
- YORK
- Postcode
- Y O26
- Post Town
- Not specified
- Country
- Not specified
-
- Major Region (ITL 1)
- Not specified
- Basic Region (ITL 2)
- Not specified
- Small Region (ITL 3)
- Not specified
- Delivery Location
- Not specified
-
- Local Authority
- Not specified
- Electoral Ward
- Not specified
- Westminster Constituency
- Not specified
Further Information
Notice Documents
-
https://www.contractsfinder.service.gov.uk/Notice/2a868336-4e5e-4a78-8fec-353610eecfaa
24th January 2024 - Early engagement notice on Contracts Finder
Notice URLs
Open Contracting Data Standard (OCDS)
View full OCDS Record for this contracting process
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.
{
"tag": [
"compiled"
],
"id": "ocds-b5fd17-c87a9e30-8dae-4a5a-bd86-748f30942275-2024-01-24T18:57:13Z",
"date": "2024-01-24T18:57:13Z",
"ocid": "ocds-b5fd17-c87a9e30-8dae-4a5a-bd86-748f30942275",
"language": "en",
"initiationType": "tender",
"title": "Hammerton Greenway Green Hammerton and Thorpe Underwood",
"planning": {
"milestones": [
{
"id": "1",
"title": "Engagement end date",
"type": "engagement",
"dueDate": "2024-04-30T23:59:59+01:00"
}
],
"documents": [
{
"id": "1",
"documentType": "marketEngagementNotice",
"description": "Early engagement notice on Contracts Finder",
"url": "https://www.contractsfinder.service.gov.uk/Notice/2a868336-4e5e-4a78-8fec-353610eecfaa",
"datePublished": "2024-01-24T18:57:13Z",
"format": "text/html",
"language": "en"
}
]
},
"tender": {
"id": "Hammerton Greenway",
"title": "Hammerton Greenway Green Hammerton and Thorpe Underwood",
"description": "It is proposed to construct a Greenway from Green Hammerton to Thorpe Underwood. The village of Green Hammerton is located adjacent to the A59 between Harrogate and York. A location plan of the route is shown heavily dotted on the map above. The 1.7 km route will be suitable for cyclists, walkers, wheelchair and mobility scooter users. The surface will be durable all-weather crushed stone, up to 2m wide, with mown verges either side, giving a total width of 5m. The majority of the route will be an upgrade to existing farm track and public footpath; 2 sections, some 600m in total, create a new route. The route is established by two agreements: the 'Dedication of Public Highway: Creation of Cycletrack in the Parish of Green Hammerton', signed 2018 between North Yorkshire County Council, and two landowners whose tracks are crossed by the route, and the 'Public Path Creation Agreement Pursuant to Section 30 of the Highways Act 1980' signed 2016 by Little Ouseburn, Kirby Hall and Thorpe Underwood Parish Council and Foxlow Ltd. Planning permission has been granted for the route by North Yorkshire Council. 2. CLIENT The Client for the Works is Green Hammerton Parish Council. 3. OTHER PARTIES WITH AN INTEREST North Yorkshire Council are funding the majority of the scheme from Developer Contributions arising from new housebuilding. As such they have requirements on how the funds are managed and issued. The Internal Drainage Board have in interest insofar as the route crosses a beck and there are also concerns that the surface of the track should be sufficiently permeable to prevent excess run-off. 4. SCOPE OF WORK The length of construction is 1.726 km. The majority of the construction will be a 2.0m wide permeable stone surface. The material for the surface will be a type 3 material (with a 30% voids ratio), to be agreed with the Internal Drainage Board before commencement of work. A section of 178m of existing farm track at the south end is being optionally considered for bitmac surfacing or similar. Also included is the provision of a new timber preformed bridge over a beck. The bridge will be no more than 1.5m wide, and its design will be agreed in advance with the Internal Drainage Board. Three piped ditch crossings will also be required, and three points on the Greenway will need appropriate reinforcement to allow tractors and other farm machinery to cross. Post and plain wire fencing will be required where the route crosses one field. Other stretches may need to be fenced subject to discussion. Timber bollards will be required at the ends of the cycleway to prevent vehicular access. Some cutting back of overhanging branches and overgrown hedges will be necessary, and this work will need to be undertaken after the nesting season.",
"status": "planning",
"classification": {
"scheme": "CPV",
"id": "45000000",
"description": "Construction work"
},
"items": [
{
"id": "1",
"deliveryAddresses": [
{
"postalCode": "YO26"
}
]
}
],
"suitability": {
"sme": true,
"vcse": true
}
},
"parties": [
{
"id": "GB-SRS-supplierregistration.cabinetoffice.gov.uk/W6ve6RrB",
"name": "Green Hammerton Parish Council",
"identifier": {
"legalName": "Green Hammerton Parish Council",
"scheme": "GB-SRS",
"id": "supplierregistration.cabinetoffice.gov.uk/W6ve6RrB"
},
"address": {
"streetAddress": "Harrogate Rd",
"locality": "York",
"postalCode": "YO26",
"countryName": "England"
},
"contactPoint": {
"name": "Jane Merriman",
"email": "clerk@greenhammerton-pc.gov.uk",
"telephone": "07796 447931"
},
"details": {
"url": "http://www.greenhammerton-pc.gov.uk"
},
"roles": [
"buyer"
]
}
],
"buyer": {
"id": "GB-SRS-supplierregistration.cabinetoffice.gov.uk/W6ve6RrB",
"name": "Green Hammerton Parish Council"
}
}