Tender

GB-Shrewsbury: RMCB 050 - Reroofing Phase 1 - Shifnal Primary School

SHROPSHIRE COUNCIL

There is 1 contract in this contracting process.

  • Contract Timeline

    Publication Date

    20th June 2024 09:40:04 AM

    Tender Deadline

    11th July 2024 11:00:00 AM   10 days remaining

  • Contract Summary

    The works consist of stripping of the existing built up felt roof down to the existing deck, and then laying of new cut to falls insulation and a Garland UK built up felt roof system as per the schedule of works and specification. The works package also includes the replacement of the existing rooflights, fascia, edge trims, hoppers and downpipes all as per the schedule of works and specification document. All works are to be undertaken by competent NFRC members and certified/approved contractor on the Garland UK authorised contractor network to ensure the Garland UK Warranty/guarantee is valid. This project is aimed to be commenced during the summer holidays and then during the Autumn school term therefore the school will remain "live" at times and there will be children and building users within the building and adjacent playing areas etc. Given this there is a strict requirement to leave all areas and grounds habitable, safe and unimpeded, including protecting all high level windows, roof lights and fire escapes. The contractor will also be required to protect the children, buildings users and staff within the school at all times. The works are to be phased as follows: Section 1 (Work period 1) - As highlighted within the prelims this section is to be commenced on 5th August 2024 and completion by 23rd August 2024. This section is for completion of all the required works to above the kitchen and classroom as shown on the Section / Work Period plan. Section 2 (Work period 2) - As highlighted within the prelims this section is to be commenced on 5th August 2024 and completion by 11th October 2024 (10 weeks). This section is for the remainder of the required works to the roofs. You should provide a tender price for ALL the items presented in the attached "Schedule of works", drawings and the Garland Specification document. All reasonable undertakings and inclusions required to complete the works must be allowed for within the Tender price, whether or not specifically identified within the Tender Documentation or Specification. All work to conform to good practice and current British Standards and Regulations, including NFRC Safe to Torch. Additional information: The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement.

  • Contract Details

    Open Contracting ID

    ocds-b5fd17-cc9ad547-d8f4-404e-b978-d8ab6e6761ab

    Publication Source

    Contracts Finder

    Procurement Stage

    Tender

    Procurement Method

    Open

    Procurement Method Details

    Open Procedure

    Procurement Category

    Works

    Tender Suitability

    SME

    Framework / DPS

  • Contract Classification

    CPV Code(s)

    45261900

    CPV Division(s)

    45 - Construction work

  • Awarding Authority

    SHROPSHIRE COUNCIL

    Buyer Name

    Procurement Team

    Buyer Email

    procurement@shropshire.gov.uk

    Buyer Phone

    +441743252992

    Buyer Address

    Shirehall, Abbey Foregate

    Shrewsbury

    SY2 6ND

    UK