SMG Racking Inspections

SCIENCE MUSEUM GROUP

  • Contract Timeline

    Publication Date

    27th June 2024 16:03:43 PM

    TenderAmendment Deadline

    5th July 2024 16:00:00 PM   Expired

  • Contract Summary

    SMG wishes to appoint a supplier for inspection of racking and shelving. The company should be an approved SEMA (Storage Equipment Manufacturers Association) inspector or SARI. The inspections will be required at all the sites within SMG. The below definition explains what SMG considers to be racking: o Any type of framework of fixed or adjustable design which supports a load without the use of shelves (e.g., pallet racking) o Contains mechanical components/moving parts in the storage system (mechanical racking). o Stillages All other storage systems may be considered shelving or bookshelves. To ensure certain types of shelving are suitable for purpose, SMG have also deemed there to be a category of enhanced inspection shelving. This shelving is defined as: o Shelving which supports loads whereby one person could not comfortably lift the loads without assistance (based on manual handling guidelines) or the use of equipment such as ladders. o Extensive large shelving which supports a lot of material/stock The service should be on an annual basis unless the inspection results dictate otherwise. The appointed supplier will undertake a full asset verification during the first visit to each location, and throughout the contract, maintain an up-to-date asset list, adding and removing items as required. Access to the asset list, inspection reports, recommendations etc via a web portal/electronic system. The supplier should be independent from any racking manufacturer and be able to inspect all the types of racking as outlined above. The inspection should include all elements required under the relevant legislation, SEMA guidelines and best practices. In addition, identify if and where safe working load or SEMA notices are required, check existing signage for correct details and locations. Where the safe working load notices are missing, or the racking is historic in nature the safe load must be determined and notified to SMG. Where defects are noticed during the inspection the report must highlight this along with a time period for the repair. Any defects leading to serious safety risk should be notified to the local Estates Team immediately along with the required actions. Where defects are noted, a quote should follow to undertake the repairs. SMG will not be obliged to act on this quote. Some of the SMG sites are very large with asset locates across different buildings and numerous floors, the time and to travel within the site must be included. Access to site will be facilitated by the local Estates Team, and all site attendance must be coordinated through them. The inspections will take place during normal business hours 07.00 - 19.00. Public areas are to be inspected outside of museum operational hours of 10.00 - 18.00. To enable this, a program needs to be developed for the inspections at each site. There must be flexibility for events, breakdowns, maintenance etc within the program as an ... Additional information: You can view our tender documents and apply for the opportunity here: https://in-tendhost.co.uk/sciencemuseumgroup/aspx/Home Is a Recurrent Procurement Type? : No

  • Contract Details

    Open Contracting ID

    ocds-b5fd17-ea8eb819-0e6d-4242-bd02-41a0180b9c4f

    Publication Source

    Contracts Finder

    Procurement Stage

    TenderAmendment

    Procurement Method

    Open

    Procurement Method Details

    Open Procedure (below Threshold)

    Procurement Category

    Services

    Tender Suitability

    SME

    Framework / DPS

  • Contract Classification

    CPV Code(s)

    39151100

    CPV Division(s)

    39 - Furniture (incl. office furniture), furnishings, domestic appliances (excl. lighting) and cleaning products

  • Awarding Authority

    SCIENCE MUSEUM GROUP

    Buyer Name

    Orla Gardner

    Buyer Email

    Orla.Gardner@Railwaymuseum.org.uk

    Buyer Phone

    02079424000

    Buyer Address

    Exhibition Road, South Kensington

    London

    SW7 2DD

    United Kingdom


TenderAmendment

SMG Racking Inspections

SCIENCE MUSEUM GROUP

  • Contract Timeline

    Publication Date

    27th June 2024 16:03:28 PM

    TenderAmendment Deadline

    5th July 2024 16:00:00 PM   Expired

  • Contract Summary

    SMG wishes to appoint a supplier for inspection of racking and shelving. The company should be an approved SEMA (Storage Equipment Manufacturers Association) inspector or SARI. The inspections will be required at all the sites within SMG. The below definition explains what SMG considers to be racking: o Any type of framework of fixed or adjustable design which supports a load without the use of shelves (e.g., pallet racking) o Contains mechanical components/moving parts in the storage system (mechanical racking). o Stillages All other storage systems may be considered shelving or bookshelves. To ensure certain types of shelving are suitable for purpose, SMG have also deemed there to be a category of enhanced inspection shelving. This shelving is defined as: o Shelving which supports loads whereby one person could not comfortably lift the loads without assistance (based on manual handling guidelines) or the use of equipment such as ladders. o Extensive large shelving which supports a lot of material/stock The service should be on an annual basis unless the inspection results dictate otherwise. The appointed supplier will undertake a full asset verification during the first visit to each location, and throughout the contract, maintain an up-to-date asset list, adding and removing items as required. Access to the asset list, inspection reports, recommendations etc via a web portal/electronic system. The supplier should be independent from any racking manufacturer and be able to inspect all the types of racking as outlined above. The inspection should include all elements required under the relevant legislation, SEMA guidelines and best practices. In addition, identify if and where safe working load or SEMA notices are required, check existing signage for correct details and locations. Where the safe working load notices are missing, or the racking is historic in nature the safe load must be determined and notified to SMG. Where defects are noticed during the inspection the report must highlight this along with a time period for the repair. Any defects leading to serious safety risk should be notified to the local Estates Team immediately along with the required actions. Where defects are noted, a quote should follow to undertake the repairs. SMG will not be obliged to act on this quote. Some of the SMG sites are very large with asset locates across different buildings and numerous floors, the time and to travel within the site must be included. Access to site will be facilitated by the local Estates Team, and all site attendance must be coordinated through them. The inspections will take place during normal business hours 07.00 - 19.00. Public areas are to be inspected outside of museum operational hours of 10.00 - 18.00. To enable this, a program needs to be developed for the inspections at each site. There must be flexibility for events, breakdowns, maintenance etc within the program as an ... Additional information: You can view our tender documents and apply for the opportunity here: https://in-tendhost.co.uk/sciencemuseumgroup/aspx/Home Is a Recurrent Procurement Type? : No

  • Contract Details

    Open Contracting ID

    ocds-b5fd17-ea8eb819-0e6d-4242-bd02-41a0180b9c4f

    Publication Source

    Contracts Finder

    Procurement Stage

    TenderAmendment

    Procurement Method

    Open

    Procurement Method Details

    Open Procedure (below Threshold)

    Procurement Category

    Services

    Tender Suitability

    SME

    Framework / DPS

  • Contract Classification

    CPV Code(s)

    39151100

    CPV Division(s)

    39 - Furniture (incl. office furniture), furnishings, domestic appliances (excl. lighting) and cleaning products

  • Awarding Authority

    SCIENCE MUSEUM GROUP

    Buyer Name

    Orla Gardner

    Buyer Email

    Orla.Gardner@Railwaymuseum.org.uk

    Buyer Phone

    02079424000

    Buyer Address

    Exhibition Road, South Kensington

    London

    SW7 2DD

    United Kingdom


TenderAmendment

SMG Racking Inspections

SCIENCE MUSEUM GROUP

  • Contract Timeline

    Publication Date

    14th June 2024 15:13:25 PM

    TenderAmendment Deadline

    28th June 2024 16:00:00 PM   Expired

  • Contract Summary

    SMG wishes to appoint a supplier for inspection of racking and shelving. The company should be an approved SEMA (Storage Equipment Manufacturers Association) inspector or SARI. The inspections will be required at all the sites within SMG. The below definition explains what SMG considers to be racking: o Any type of framework of fixed or adjustable design which supports a load without the use of shelves (e.g., pallet racking) o Contains mechanical components/moving parts in the storage system (mechanical racking). o Stillages All other storage systems may be considered shelving or bookshelves. To ensure certain types of shelving are suitable for purpose, SMG have also deemed there to be a category of enhanced inspection shelving. This shelving is defined as: o Shelving which supports loads whereby one person could not comfortably lift the loads without assistance (based on manual handling guidelines) or the use of equipment such as ladders. o Extensive large shelving which supports a lot of material/stock The service should be on an annual basis unless the inspection results dictate otherwise. The appointed supplier will undertake a full asset verification during the first visit to each location, and throughout the contract, maintain an up-to-date asset list, adding and removing items as required. Access to the asset list, inspection reports, recommendations etc via a web portal/electronic system. The supplier should be independent from any racking manufacturer and be able to inspect all the types of racking as outlined above. The inspection should include all elements required under the relevant legislation, SEMA guidelines and best practices. In addition, identify if and where safe working load or SEMA notices are required, check existing signage for correct details and locations. Where the safe working load notices are missing, or the racking is historic in nature the safe load must be determined and notified to SMG. Where defects are noticed during the inspection the report must highlight this along with a time period for the repair. Any defects leading to serious safety risk should be notified to the local Estates Team immediately along with the required actions. Where defects are noted, a quote should follow to undertake the repairs. SMG will not be obliged to act on this quote. Some of the SMG sites are very large with asset locates across different buildings and numerous floors, the time and to travel within the site must be included. Access to site will be facilitated by the local Estates Team, and all site attendance must be coordinated through them. The inspections will take place during normal business hours 07.00 - 19.00. Public areas are to be inspected outside of museum operational hours of 10.00 - 18.00. To enable this, a program needs to be developed for the inspections at each site. There must be flexibility for events, breakdowns, maintenance etc within the program as an ... Additional information: You can view our tender documents and apply for the opportunity here: https://in-tendhost.co.uk/sciencemuseumgroup/aspx/Home Is a Recurrent Procurement Type? : No

  • Contract Details

    Open Contracting ID

    ocds-b5fd17-ea8eb819-0e6d-4242-bd02-41a0180b9c4f

    Publication Source

    Contracts Finder

    Procurement Stage

    TenderAmendment

    Procurement Method

    Open

    Procurement Method Details

    Open Procedure (below Threshold)

    Procurement Category

    Services

    Tender Suitability

    SME

    Framework / DPS

  • Contract Classification

    CPV Code(s)

    39151100

    CPV Division(s)

    39 - Furniture (incl. office furniture), furnishings, domestic appliances (excl. lighting) and cleaning products

  • Awarding Authority

    SCIENCE MUSEUM GROUP

    Buyer Name

    Orla Gardner

    Buyer Email

    Orla.Gardner@Railwaymuseum.org.uk

    Buyer Phone

    02079424000

    Buyer Address

    Exhibition Road, South Kensington

    London

    SW7 2DD

    United Kingdom


TenderAmendment

SMG Racking Inspections

SCIENCE MUSEUM GROUP

  • Contract Timeline

    Publication Date

    14th June 2024 15:11:36 PM

    TenderAmendment Deadline

    28th June 2024 16:00:00 PM   Expired

  • Contract Summary

    SMG wishes to appoint a supplier for inspection of racking and shelving. The company should be an approved SEMA (Storage Equipment Manufacturers Association) inspector or SARI. The inspections will be required at all the sites within SMG. The below definition explains what SMG considers to be racking: o Any type of framework of fixed or adjustable design which supports a load without the use of shelves (e.g., pallet racking) o Contains mechanical components/moving parts in the storage system (mechanical racking). o Stillages All other storage systems may be considered shelving or bookshelves. To ensure certain types of shelving are suitable for purpose, SMG have also deemed there to be a category of enhanced inspection shelving. This shelving is defined as: o Shelving which supports loads whereby one person could not comfortably lift the loads without assistance (based on manual handling guidelines) or the use of equipment such as ladders. o Extensive large shelving which supports a lot of material/stock The service should be on an annual basis unless the inspection results dictate otherwise. The appointed supplier will undertake a full asset verification during the first visit to each location, and throughout the contract, maintain an up-to-date asset list, adding and removing items as required. Access to the asset list, inspection reports, recommendations etc via a web portal/electronic system. The supplier should be independent from any racking manufacturer and be able to inspect all the types of racking as outlined above. The inspection should include all elements required under the relevant legislation, SEMA guidelines and best practices. In addition, identify if and where safe working load or SEMA notices are required, check existing signage for correct details and locations. Where the safe working load notices are missing, or the racking is historic in nature the safe load must be determined and notified to SMG. Where defects are noticed during the inspection the report must highlight this along with a time period for the repair. Any defects leading to serious safety risk should be notified to the local Estates Team immediately along with the required actions. Where defects are noted, a quote should follow to undertake the repairs. SMG will not be obliged to act on this quote. Some of the SMG sites are very large with asset locates across different buildings and numerous floors, the time and to travel within the site must be included. Access to site will be facilitated by the local Estates Team, and all site attendance must be coordinated through them. The inspections will take place during normal business hours 07.00 - 19.00. Public areas are to be inspected outside of museum operational hours of 10.00 - 18.00. To enable this, a program needs to be developed for the inspections at each site. There must be flexibility for events, breakdowns, maintenance etc within the program as an ... Additional information: You can view our tender documents and apply for the opportunity here: https://in-tendhost.co.uk/sciencemuseumgroup/aspx/Home Is a Recurrent Procurement Type? : No

  • Contract Details

    Open Contracting ID

    ocds-b5fd17-ea8eb819-0e6d-4242-bd02-41a0180b9c4f

    Publication Source

    Contracts Finder

    Procurement Stage

    TenderAmendment

    Procurement Method

    Open

    Procurement Method Details

    Open Procedure (below Threshold)

    Procurement Category

    Services

    Tender Suitability

    SME

    Framework / DPS

  • Contract Classification

    CPV Code(s)

    39151100

    CPV Division(s)

    39 - Furniture (incl. office furniture), furnishings, domestic appliances (excl. lighting) and cleaning products

  • Awarding Authority

    SCIENCE MUSEUM GROUP

    Buyer Name

    Orla Gardner

    Buyer Email

    Orla.Gardner@Railwaymuseum.org.uk

    Buyer Phone

    02079424000

    Buyer Address

    Exhibition Road, South Kensington

    London

    SW7 2DD

    United Kingdom


Tender

SMG Racking Inspections

SCIENCE MUSEUM GROUP

  • Contract Timeline

    Publication Date

    14th June 2024 15:10:37 PM

    Tender Deadline

    28th July 2024 16:00:00 PM   Expired

  • Contract Summary

    SMG wishes to appoint a supplier for inspection of racking and shelving. The company should be an approved SEMA (Storage Equipment Manufacturers Association) inspector or SARI. The inspections will be required at all the sites within SMG. The below definition explains what SMG considers to be racking: o Any type of framework of fixed or adjustable design which supports a load without the use of shelves (e.g., pallet racking) o Contains mechanical components/moving parts in the storage system (mechanical racking). o Stillages All other storage systems may be considered shelving or bookshelves. To ensure certain types of shelving are suitable for purpose, SMG have also deemed there to be a category of enhanced inspection shelving. This shelving is defined as: o Shelving which supports loads whereby one person could not comfortably lift the loads without assistance (based on manual handling guidelines) or the use of equipment such as ladders. o Extensive large shelving which supports a lot of material/stock The service should be on an annual basis unless the inspection results dictate otherwise. The appointed supplier will undertake a full asset verification during the first visit to each location, and throughout the contract, maintain an up-to-date asset list, adding and removing items as required. Access to the asset list, inspection reports, recommendations etc via a web portal/electronic system. The supplier should be independent from any racking manufacturer and be able to inspect all the types of racking as outlined above. The inspection should include all elements required under the relevant legislation, SEMA guidelines and best practices. In addition, identify if and where safe working load or SEMA notices are required, check existing signage for correct details and locations. Where the safe working load notices are missing, or the racking is historic in nature the safe load must be determined and notified to SMG. Where defects are noticed during the inspection the report must highlight this along with a time period for the repair. Any defects leading to serious safety risk should be notified to the local Estates Team immediately along with the required actions. Where defects are noted, a quote should follow to undertake the repairs. SMG will not be obliged to act on this quote. Some of the SMG sites are very large with asset locates across different buildings and numerous floors, the time and to travel within the site must be included. Access to site will be facilitated by the local Estates Team, and all site attendance must be coordinated through them. The inspections will take place during normal business hours 07.00 - 19.00. Public areas are to be inspected outside of museum operational hours of 10.00 - 18.00. To enable this, a program needs to be developed for the inspections at each site. There must be flexibility for events, breakdowns, maintenance etc within the program as an ... Additional information: You can view our tender documents and apply for the opportunity here: https://in-tendhost.co.uk/sciencemuseumgroup/aspx/Home Is a Recurrent Procurement Type? : No

  • Contract Details

    Open Contracting ID

    ocds-b5fd17-ea8eb819-0e6d-4242-bd02-41a0180b9c4f

    Publication Source

    Contracts Finder

    Procurement Stage

    Tender

    Procurement Method

    Open

    Procurement Method Details

    Open Procedure (below Threshold)

    Procurement Category

    Services

    Tender Suitability

    SME

    Framework / DPS

  • Contract Classification

    CPV Code(s)

    39151100

    CPV Division(s)

    39 - Furniture (incl. office furniture), furnishings, domestic appliances (excl. lighting) and cleaning products

  • Awarding Authority

    SCIENCE MUSEUM GROUP

    Buyer Name

    Orla Gardner

    Buyer Email

    Orla.Gardner@Railwaymuseum.org.uk

    Buyer Phone

    02079424000

    Buyer Address

    Exhibition Road, South Kensington

    London

    SW7 2DD

    United Kingdom