Award

Oxford Phase 2 Works - Botley Bridge, Platform 5, Track & Crossovers

NETWORK RAIL INFRASTRUCTURE LTD

This public procurement record has 2 releases in its history.

Award

09 Mar 2022 at 22:45

Tender

15 Apr 2021 at 21:55

Summary of the contracting process

The procurement process is led by Network Rail Infrastructure Ltd, focusing on the "Oxford Phase 2 Works - Botley Bridge, Platform 5, Track & Crossovers" project, classified under the construction works industry. The tender is currently in the award stage, having completed the mandatory standstill period, with the contract valued at approximately £65.5 million. The specific project involves diverse works including the installation of a new bridge span and enhancements to Platform 5 at Oxford Station. Key dates include the tender submission deadline of 26 April 2021, and the projected completion date for the works is set for 31 December 2024.

This tender presents robust opportunities for businesses operating within the construction sector, particularly those specialising in civil engineering and infrastructure development. Companies with capabilities in railway construction, highway engineering, and associated services are well-positioned to compete. The selective procurement method allows for focused competition, meaning that pre-qualified suppliers can demonstrate their expertise in meeting the quality and technical criteria outlined in the tender documents.

Find more tenders on our Open Data Platform.
How relevant is this notice?

D3 Tenders Premium

Win More Public Sector Contracts

AI-powered tender discovery, pipeline management, and market intelligence — everything you need to grow your public sector business.

Notice Title

Oxford Phase 2 Works - Botley Bridge, Platform 5, Track & Crossovers

Notice Description

The award covered a single tender for detail design and construction. Network Rail reserves the right, subject to funding and consents, to award the Works in part or in full. Primarily, the works involve installation of a new bridge span to accommodate the new Platform 5 track. Replacement of the main 4-track span of Botley Road bridge and the associated highway works required to provide compliant heights and gradients. Provision of new downside, twin-face platform (Platform 5), a full length platform canopy and new staff and passenger facilities on the platform (waiting room, toilets, retail outlets and TOC accommodation). A new western entrance to the station providing level access from Roger Dudman Way. Re-alignment of Roger Dudman Way and Cripley Road.

Lot Information

Lot 1

Package 2B: Track Works - High Speed Crossovers: Three 75mph high speed crossovers will be installed to replace the current 25mph crossovers at Oxford North Junction to support improved East West Rail service provision to the OXD lines. Package 2C: Botley Road Bridge: Installation of a new bridge span to accommodate the new Platform 5 track. Replacement of the main 4-track span of Botley Road bridge and the associated highway works required to provide compliant heights and gradients. Improved pedestrian and cycle routes under Botley Road bridge and replacement of the Beckett Street footbridge. Package 2D: Oxford Station works, Western Entrance & Track Works: Provision of new downside, twin-face platform (Platform 5), a full length platform canopy and new staff and passenger facilities on the platform (waiting room, toilets, retail outlets and TOC accommodation). A new western entrance to the station providing level access from Roger Dudman Way. Re-alignment of Roger Dudman Way and Cripley Road.

Options: Network Rail will hold the GRIP 6-8 construction (implementation) as an employer's option as further detailed in the procurement documents. Which include but not limited to Western Entrance & Utility diversions. Network Rail reserves the right to introduce and award works associated with level crossing closures and new footbridges (Package 2A)

Publication & Lifecycle

Open Contracting ID
ocds-h6vhtk-02a6a7
Publication Source
Find A Tender Service
Latest Notice
https://www.find-tender.service.gov.uk/Notice/006518-2022
Current Stage
Award
All Stages
Tender, Award

Procurement Classification

Notice Type
Tender Notice
Procurement Type
Standard
Procurement Category
Works
Procurement Method
Selective
Procurement Method Details
Negotiated procedure with prior call for competition
Tender Suitability
Not specified
Awardee Scale
Large

Common Procurement Vocabulary (CPV)

CPV Divisions

45 - Construction work


CPV Codes

45000000 - Construction work

Notice Value(s)

Tender Value
£70,000,000 £10M-£100M
Lots Value
Not specified
Awards Value
Not specified
Contracts Value
£65,475,131 £10M-£100M

Notice Dates

Publication Date
9 Mar 20223 years ago
Submission Deadline
26 Apr 2021Expired
Future Notice Date
Not specified
Award Date
28 Feb 20223 years ago
Contract Period
Not specified - Not specified
Recurrence
Not specified

Notice Status

Tender Status
Complete
Lots Status
Cancelled
Awards Status
Active
Contracts Status
Active

Contracting Authority (Buyer)

Main Buyer
NETWORK RAIL INFRASTRUCTURE LTD
Contact Name
Not specified
Contact Email
sarabjit.lota@networkrail.co.uk
Contact Phone
+44 1908781000

Buyer Location

Locality
LONDON
Postcode
NW1 2DN
Post Town
North West London
Country
England

Major Region (ITL 1)
TLI London
Basic Region (ITL 2)
TLI3 Inner London - West
Small Region (ITL 3)
TLI36 Camden
Delivery Location
Not specified

Local Authority
Camden
Electoral Ward
Regent's Park
Westminster Constituency
Holborn and St Pancras

Supplier Information

Number of Suppliers
1
Supplier Name

KIER INFRASTRUCTURE & OVERSEAS

Open Contracting Data Standard (OCDS)

View full OCDS Record for this contracting process

Download

The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.

{
    "tag": [
        "compiled"
    ],
    "id": "ocds-h6vhtk-02a6a7-2022-03-09T22:45:02Z",
    "date": "2022-03-09T22:45:02Z",
    "ocid": "ocds-h6vhtk-02a6a7",
    "initiationType": "tender",
    "tender": {
        "id": "163390",
        "legalBasis": {
            "id": "32014L0025",
            "scheme": "CELEX"
        },
        "title": "Oxford Phase 2 Works - Botley Bridge, Platform 5, Track & Crossovers",
        "status": "complete",
        "classification": {
            "scheme": "CPV",
            "id": "45000000",
            "description": "Construction work"
        },
        "mainProcurementCategory": "works",
        "description": "The award covered a single tender for detail design and construction. Network Rail reserves the right, subject to funding and consents, to award the Works in part or in full. Primarily, the works involve installation of a new bridge span to accommodate the new Platform 5 track. Replacement of the main 4-track span of Botley Road bridge and the associated highway works required to provide compliant heights and gradients. Provision of new downside, twin-face platform (Platform 5), a full length platform canopy and new staff and passenger facilities on the platform (waiting room, toilets, retail outlets and TOC accommodation). A new western entrance to the station providing level access from Roger Dudman Way. Re-alignment of Roger Dudman Way and Cripley Road.",
        "value": {
            "amount": 70000000,
            "currency": "GBP"
        },
        "lots": [
            {
                "id": "1",
                "description": "Package 2B: Track Works - High Speed Crossovers: Three 75mph high speed crossovers will be installed to replace the current 25mph crossovers at Oxford North Junction to support improved East West Rail service provision to the OXD lines. Package 2C: Botley Road Bridge: Installation of a new bridge span to accommodate the new Platform 5 track. Replacement of the main 4-track span of Botley Road bridge and the associated highway works required to provide compliant heights and gradients. Improved pedestrian and cycle routes under Botley Road bridge and replacement of the Beckett Street footbridge. Package 2D: Oxford Station works, Western Entrance & Track Works: Provision of new downside, twin-face platform (Platform 5), a full length platform canopy and new staff and passenger facilities on the platform (waiting room, toilets, retail outlets and TOC accommodation). A new western entrance to the station providing level access from Roger Dudman Way. Re-alignment of Roger Dudman Way and Cripley Road.",
                "contractPeriod": {
                    "endDate": "2024-12-31T23:59:59Z"
                },
                "hasRenewal": false,
                "secondStage": {
                    "minimumCandidates": 3,
                    "maximumCandidates": 3
                },
                "selectionCriteria": {
                    "description": "As detailed in the procurement documents."
                },
                "submissionTerms": {
                    "variantPolicy": "allowed"
                },
                "hasOptions": true,
                "options": {
                    "description": "Network Rail will hold the GRIP 6-8 construction (implementation) as an employer's option as further detailed in the procurement documents. Which include but not limited to Western Entrance & Utility diversions. Network Rail reserves the right to introduce and award works associated with level crossing closures and new footbridges (Package 2A)"
                },
                "status": "cancelled",
                "awardCriteria": {
                    "criteria": [
                        {
                            "name": "Technical & Methodology",
                            "type": "quality",
                            "description": "42%"
                        },
                        {
                            "name": "Programme",
                            "type": "quality",
                            "description": "12%"
                        },
                        {
                            "name": "Resources",
                            "type": "quality",
                            "description": "6%"
                        },
                        {
                            "name": "Sustainability",
                            "type": "quality",
                            "description": "Pass / Fail"
                        },
                        {
                            "name": "Safety",
                            "type": "quality",
                            "description": "Pass / Fail"
                        },
                        {
                            "name": "Compliance",
                            "type": "quality",
                            "description": "Pass / Fail"
                        },
                        {
                            "name": "Fee",
                            "type": "cost",
                            "description": "4%"
                        },
                        {
                            "name": "Price",
                            "type": "cost",
                            "description": "36%"
                        }
                    ]
                }
            }
        ],
        "items": [
            {
                "id": "1",
                "deliveryAddresses": [
                    {
                        "region": "UK"
                    },
                    {
                        "region": "UK"
                    }
                ],
                "relatedLot": "1"
            }
        ],
        "submissionMethod": [
            "electronicSubmission",
            "written"
        ],
        "submissionMethodDetails": "https://networkrail.bravosolution.co.uk/esop/toolkit/opportunity/current/49937/detail.si",
        "communication": {
            "atypicalToolUrl": "https://networkrail.bravosolution.co.uk/web/login.html"
        },
        "selectionCriteria": {
            "criteria": [
                {
                    "type": "suitability",
                    "description": "As set out in the procurement documents",
                    "appliesTo": [
                        "supplier"
                    ]
                }
            ]
        },
        "documents": [
            {
                "id": "economic",
                "documentType": "economicSelectionCriteria"
            },
            {
                "id": "technical",
                "documentType": "technicalSelectionCriteria"
            }
        ],
        "otherRequirements": {
            "reductionCriteria": "As set out in the procurement documents"
        },
        "submissionTerms": {
            "depositsGuarantees": "Network Rail may require Parent Company Guarantee.",
            "languages": [
                "en"
            ],
            "bidValidityPeriod": {
                "durationInDays": 180
            }
        },
        "contractTerms": {
            "financialTerms": "As set out in the procurement documents",
            "tendererLegalForm": "As set out in the procurement documents",
            "performanceTerms": "As set out in the procurement documents",
            "electronicInvoicingPolicy": "allowed",
            "hasElectronicPayment": true
        },
        "procurementMethod": "selective",
        "procurementMethodDetails": "Negotiated procedure with prior call for competition",
        "tenderPeriod": {
            "endDate": "2021-04-26T12:01:00+01:00"
        },
        "hasRecurrence": false,
        "reviewDetails": "Network Rail will observe a standstill period following the award of the contract and conduct itself in respect of any review procedure in accordance with the Utilities Contracts Regulations 2016."
    },
    "parties": [
        {
            "id": "GB-FTS-12608",
            "name": "Network Rail Infrastructure Ltd",
            "identifier": {
                "legalName": "Network Rail Infrastructure Ltd",
                "id": "02904587"
            },
            "address": {
                "streetAddress": "1 Eversholt Street",
                "locality": "London",
                "region": "UK",
                "postalCode": "NW1 2DN",
                "countryName": "United Kingdom"
            },
            "contactPoint": {
                "telephone": "+44 1908781000",
                "email": "Sarabjit.Lota@networkrail.co.uk",
                "url": "https://networkrail.bravosolution.co.uk/web/login.html"
            },
            "roles": [
                "buyer"
            ],
            "details": {
                "url": "http://www.networkrail.co.uk",
                "buyerProfile": "https://networkrail.bravosolution.co.uk/web/login.html",
                "classifications": [
                    {
                        "scheme": "TED_CE_ACTIVITY",
                        "id": "RAILWAY_SERVICES",
                        "description": "Railway services"
                    }
                ]
            }
        },
        {
            "id": "GB-FTS-12609",
            "name": "High Court of England & Wales",
            "identifier": {
                "legalName": "High Court of England & Wales"
            },
            "address": {
                "streetAddress": "Royal Courts of Justice, Strand",
                "locality": "London",
                "postalCode": "WC1A 2LL",
                "countryName": "United Kingdom"
            },
            "roles": [
                "mediationBody"
            ]
        },
        {
            "id": "GB-FTS-137",
            "name": "Cabinet Office",
            "identifier": {
                "legalName": "Cabinet Office"
            },
            "address": {
                "streetAddress": "70 Whitehall",
                "locality": "London",
                "postalCode": "SW1A 2AS",
                "countryName": "United Kingdom"
            },
            "roles": [
                "reviewContactPoint"
            ]
        },
        {
            "id": "GB-FTS-448",
            "name": "Network Rail Infrastructure Ltd",
            "identifier": {
                "legalName": "Network Rail Infrastructure Ltd"
            },
            "address": {
                "streetAddress": "1 Eversholt Street",
                "locality": "London",
                "region": "UK",
                "postalCode": "NW1 2DN",
                "countryName": "United Kingdom"
            },
            "contactPoint": {
                "telephone": "+44 1908781000",
                "email": "Sarabjit.Lota@networkrail.co.uk"
            },
            "roles": [
                "buyer"
            ],
            "details": {
                "url": "http://www.networkrail.co.uk",
                "buyerProfile": "https://networkrail.bravosolution.co.uk/web/login.html",
                "classifications": [
                    {
                        "scheme": "TED_CE_ACTIVITY",
                        "id": "RAILWAY_SERVICES",
                        "description": "Railway services"
                    }
                ]
            }
        },
        {
            "id": "GB-FTS-46490",
            "name": "Kier Infrastructure & Overseas Limited",
            "identifier": {
                "legalName": "Kier Infrastructure & Overseas Limited",
                "id": "1157281"
            },
            "address": {
                "streetAddress": "2nd Floor, Optimum House, Clippers Quay,",
                "locality": "Salford",
                "region": "UK",
                "postalCode": "M50 3XP",
                "countryName": "United Kingdom"
            },
            "roles": [
                "supplier"
            ],
            "details": {
                "scale": "large"
            }
        },
        {
            "id": "GB-FTS-46491",
            "name": "Network Rail Infrastructure Limited",
            "identifier": {
                "legalName": "Network Rail Infrastructure Limited"
            },
            "address": {
                "streetAddress": "Western House, 1 Holbrook Way,",
                "locality": "Swindon",
                "postalCode": "SN1 1BD",
                "countryName": "United Kingdom"
            },
            "roles": [
                "reviewBody",
                "reviewContactPoint"
            ]
        }
    ],
    "buyer": {
        "id": "GB-FTS-448",
        "name": "Network Rail Infrastructure Ltd"
    },
    "language": "en",
    "description": "The mandatory standstill period has been observed and now completed. The contract was executed and now awarded.",
    "awards": [
        {
            "id": "006518-2022-ecm29871-1",
            "relatedLots": [
                "1"
            ],
            "title": "Oxford Phase 2 Works - Botley Bridge, Platform 5, Western Entrance.",
            "status": "active",
            "suppliers": [
                {
                    "id": "GB-FTS-46490",
                    "name": "Kier Infrastructure & Overseas Limited"
                }
            ]
        }
    ],
    "contracts": [
        {
            "id": "006518-2022-ecm29871-1",
            "awardID": "006518-2022-ecm29871-1",
            "title": "Oxford Phase 2 Works - Botley Bridge, Platform 5, Western Entrance.",
            "status": "active",
            "value": {
                "amount": 65475131.9,
                "currency": "GBP"
            },
            "dateSigned": "2022-02-28T00:00:00Z"
        }
    ],
    "bids": {
        "statistics": [
            {
                "id": "1",
                "measure": "bids",
                "relatedLot": "1",
                "value": 3
            },
            {
                "id": "2",
                "measure": "electronicBids",
                "relatedLot": "1",
                "value": 3
            }
        ]
    }
}