Summary of the contracting process

The procurement process for the construction of a new energy-efficient office building in Craigavon, Northern Ireland, was managed by the Northern Ireland Electricity Networks. Initially announced in 2021, the project involved the creation of a new two-storey office to replace the existing facility on site. The procurement used a selective method involving a negotiated procedure with a prior call for competition, classified under the works category focusing on building construction. With the planning concluded and project re-designs causing delays, the anticipated contract commencement date was moved to September 2024. The key industry category for the contract is building construction work with primary works notably covering mechanical and electrical aspects.

This project presents significant opportunities for construction-related businesses, particularly those experienced in large-scale office builds and energy-efficient design. With the main contractor responsible for comprehensive project management under CDM Regulations, businesses with strong capabilities in coordination, material management, and construction logistics will find this opportunity aligned with their expertise. The substantial contract value between £8 million to £11 million, and the focus on quality and cost, make this an attractive venture for companies within the civil engineering and construction industry, particularly those familiar with infrastructure projects in Northern Ireland.

Find more tenders on our Open Data Platform.
How relevant is this notice?

D3 Tenders Premium

Win More Public Sector Contracts

AI-powered tender discovery, pipeline management, and market intelligence — everything you need to grow your public sector business.

Notice Title

B978 (2022) Building Contractor Craigavon Office

Notice Description

* The construction of a new-build energy efficient 2 storey office building on the existing Craigavon site (in the car park area) including all associated building, mechanical and Electrical works in accordance with the project design, Building and Planning Regulations, and any phasing temporary or permanent to facilitate the works * The existing office building and stores facility is to remain operational throughout the duration of the works and a traffic management plan will be required to ensure that construction and site access for day to day business can be separated - NIE Networks will seek alternative car parking arrangements for some of its staff cars

Lot Information

Lot 1

NIE Networks is currently undertaking a programme of refurbishment/upgrades on a number of its key office bases, with the most significant being the replacement of the current office at Craigavon with a new build circa 38,000 square foot office (over 2 floors), which is to be located on the existing site. The primary works for this project will include the following: * The construction of a new-build energy efficient 2 storey office building on the existing Craigavon site (in the car park area) including all associated building, mechanical and Electrical works in accordance with the project design, Building and Planning Regulations, and any phasing temporary or permanent to facilitate the works * The existing office building and stores facility is to remain operational throughout the duration of the works and a traffic management plan will be required to ensure that construction and site access for day to day business can be separated - NIE Networks will seek alternative car parking arrangements for some of its staff cars * The existing mast and associated communications cabling are also to remain in place and operational throughout the duration of the works as this forms a critical part of NIE Networks distribution network * Upon completion and occupation of the new building, the existing building is to be demolished, and the new car parking layout and associated landscaping completed. The secondary works will include the following: * Main contractor to fulfil the role of Principal Contractor under the CDM Regulations for the duration of the work. * Any damage to hard standing areas required for equipment or materials storage or delivery, site cabins, offices etc as required by the main contractor within the site boundary, will be made good at the completion of the project. * Any surface water removal during the construction stage will be the responsibility of the main contractor and should be factored into the costs. * The design of any temporary works will be the main contractor's responsibility. * The main contractor will assume full responsibility for: - Materials and equipment once they have been delivered to site. Any damage or theft will be the contractor's sole responsibility. - Co-ordination of all deliveries associated with the works including traffic management, flag men etc. - The provision, maintenance and repair of all necessary tools, plant, equipment and skips necessary to carry out the required works. - The provision, maintenance, repair and removal on completion of all necessary temporary electrics, potable water supply, lighting, edge protection or other temporary works as necessary to carry out the required works. * The main contractor must ensure that all completed works are properly protected until handover of the site. * Before the commencement of the works the main contractor shall inspect the conditions on site and notify the NIE Networks Client representative/Principal Designer of any conditions which may adversely or otherwise affect the scope of works. * It is the responsibility of the main contractor to ensure that all plant, tools and equipment are used safely and that workers, other contractors, visitors to site and the general public are properly protected.

Options: Contract Duration is from April 2025 to October 2026

Publication & Lifecycle

Open Contracting ID
ocds-h6vhtk-02edc7
Publication Source
Find A Tender Service
Latest Notice
https://www.find-tender.service.gov.uk/Notice/030274-2025
Current Stage
Award
All Stages
Tender, Award

Procurement Classification

Notice Type
Tender Notice
Procurement Type
Standard
Procurement Category
Works
Procurement Method
Selective
Procurement Method Details
Negotiated procedure with prior call for competition
Tender Suitability
Not specified
Awardee Scale
SME

Common Procurement Vocabulary (CPV)

CPV Divisions

45 - Construction work


CPV Codes

45200000 - Works for complete or part construction and civil engineering work

45210000 - Building construction work

45213150 - Office block construction work

45213220 - Construction work for warehouses

45213221 - Warehouse stores construction work

45213250 - Construction work for industrial buildings

45213260 - Stores depot construction work

45220000 - Engineering works and construction works

Notice Value(s)

Tender Value
Not specified
Lots Value
Not specified
Awards Value
Not specified
Contracts Value
£11,000,000 £10M-£100M

Notice Dates

Publication Date
5 Jun 20258 months ago
Submission Deadline
18 Nov 2021Expired
Future Notice Date
Not specified
Award Date
13 Apr 202510 months ago
Contract Period
2 May 2022 - 4 Jan 2023 6-12 months
Recurrence
Not specified

Notice Status

Tender Status
Complete
Lots Status
Cancelled
Awards Status
Active
Contracts Status
Active

Contracting Authority (Buyer)

Main Buyer
NORTHERN IRELAND ELECTRICITY NETWORKS
Contact Name
Anna McWhirter
Contact Email
anna.mcwhirter@nienetworks.co.uk
Contact Phone
+44 3457643643

Buyer Location

Locality
BELFAST,
Postcode
BT9 5HT
Post Town
Northern Ireland
Country
Northern Ireland

Major Region (ITL 1)
Not specified
Basic Region (ITL 2)
Not specified
Small Region (ITL 3)
Not specified
Delivery Location
TLN Northern Ireland

Local Authority
Electoral Ward
Westminster Constituency

Supplier Information

Number of Suppliers
1
Supplier Name

MSM CONTRACTS

Open Contracting Data Standard (OCDS)

View full OCDS Record for this contracting process

Download

The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.

{
    "tag": [
        "compiled"
    ],
    "id": "ocds-h6vhtk-02edc7-2025-06-05T14:15:26+01:00",
    "date": "2025-06-05T14:15:26+01:00",
    "ocid": "ocds-h6vhtk-02edc7",
    "initiationType": "tender",
    "tender": {
        "id": "B978 (2022)",
        "legalBasis": {
            "id": "32014L0025",
            "scheme": "CELEX"
        },
        "title": "B978 (2022) Building Contractor Craigavon Office",
        "status": "complete",
        "classification": {
            "scheme": "CPV",
            "id": "45210000",
            "description": "Building construction work"
        },
        "mainProcurementCategory": "works",
        "description": "* The construction of a new-build energy efficient 2 storey office building on the existing Craigavon site (in the car park area) including all associated building, mechanical and Electrical works in accordance with the project design, Building and Planning Regulations, and any phasing temporary or permanent to facilitate the works * The existing office building and stores facility is to remain operational throughout the duration of the works and a traffic management plan will be required to ensure that construction and site access for day to day business can be separated - NIE Networks will seek alternative car parking arrangements for some of its staff cars",
        "lots": [
            {
                "id": "1",
                "description": "NIE Networks is currently undertaking a programme of refurbishment/upgrades on a number of its key office bases, with the most significant being the replacement of the current office at Craigavon with a new build circa 38,000 square foot office (over 2 floors), which is to be located on the existing site. The primary works for this project will include the following: * The construction of a new-build energy efficient 2 storey office building on the existing Craigavon site (in the car park area) including all associated building, mechanical and Electrical works in accordance with the project design, Building and Planning Regulations, and any phasing temporary or permanent to facilitate the works * The existing office building and stores facility is to remain operational throughout the duration of the works and a traffic management plan will be required to ensure that construction and site access for day to day business can be separated - NIE Networks will seek alternative car parking arrangements for some of its staff cars * The existing mast and associated communications cabling are also to remain in place and operational throughout the duration of the works as this forms a critical part of NIE Networks distribution network * Upon completion and occupation of the new building, the existing building is to be demolished, and the new car parking layout and associated landscaping completed. The secondary works will include the following: * Main contractor to fulfil the role of Principal Contractor under the CDM Regulations for the duration of the work. * Any damage to hard standing areas required for equipment or materials storage or delivery, site cabins, offices etc as required by the main contractor within the site boundary, will be made good at the completion of the project. * Any surface water removal during the construction stage will be the responsibility of the main contractor and should be factored into the costs. * The design of any temporary works will be the main contractor's responsibility. * The main contractor will assume full responsibility for: - Materials and equipment once they have been delivered to site. Any damage or theft will be the contractor's sole responsibility. - Co-ordination of all deliveries associated with the works including traffic management, flag men etc. - The provision, maintenance and repair of all necessary tools, plant, equipment and skips necessary to carry out the required works. - The provision, maintenance, repair and removal on completion of all necessary temporary electrics, potable water supply, lighting, edge protection or other temporary works as necessary to carry out the required works. * The main contractor must ensure that all completed works are properly protected until handover of the site. * Before the commencement of the works the main contractor shall inspect the conditions on site and notify the NIE Networks Client representative/Principal Designer of any conditions which may adversely or otherwise affect the scope of works. * It is the responsibility of the main contractor to ensure that all plant, tools and equipment are used safely and that workers, other contractors, visitors to site and the general public are properly protected.",
                "contractPeriod": {
                    "startDate": "2022-05-03T00:00:00+01:00",
                    "endDate": "2023-01-04T23:59:59Z"
                },
                "hasRenewal": false,
                "secondStage": {
                    "minimumCandidates": 6,
                    "maximumCandidates": 6
                },
                "submissionTerms": {
                    "variantPolicy": "notAllowed"
                },
                "hasOptions": true,
                "status": "cancelled",
                "awardCriteria": {
                    "criteria": [
                        {
                            "name": "Quality",
                            "type": "quality",
                            "description": "30"
                        },
                        {
                            "name": "Commercial",
                            "type": "cost",
                            "description": "70"
                        }
                    ]
                },
                "options": {
                    "description": "Contract Duration is from April 2025 to October 2026"
                }
            }
        ],
        "items": [
            {
                "id": "1",
                "additionalClassifications": [
                    {
                        "scheme": "CPV",
                        "id": "45200000",
                        "description": "Works for complete or part construction and civil engineering work"
                    },
                    {
                        "scheme": "CPV",
                        "id": "45210000",
                        "description": "Building construction work"
                    },
                    {
                        "scheme": "CPV",
                        "id": "45213150",
                        "description": "Office block construction work"
                    },
                    {
                        "scheme": "CPV",
                        "id": "45213220",
                        "description": "Construction work for warehouses"
                    },
                    {
                        "scheme": "CPV",
                        "id": "45213221",
                        "description": "Warehouse stores construction work"
                    },
                    {
                        "scheme": "CPV",
                        "id": "45213250",
                        "description": "Construction work for industrial buildings"
                    },
                    {
                        "scheme": "CPV",
                        "id": "45213260",
                        "description": "Stores depot construction work"
                    },
                    {
                        "scheme": "CPV",
                        "id": "45220000",
                        "description": "Engineering works and construction works"
                    }
                ],
                "deliveryAddresses": [
                    {
                        "region": "UKN"
                    },
                    {
                        "region": "UKN"
                    }
                ],
                "deliveryLocation": {
                    "description": "Craigavon, Northern Ireland"
                },
                "relatedLot": "1"
            }
        ],
        "submissionMethod": [
            "electronicSubmission",
            "written"
        ],
        "submissionMethodDetails": "https://e-sourcingni.bravosolution.co.uk",
        "selectionCriteria": {
            "criteria": [
                {
                    "type": "suitability",
                    "description": "As specified within the PQQ and/or tender documents available from the address specified at 1.3) above with the reference Project B978 (2022) Building Contractor Craigavon Office",
                    "appliesTo": [
                        "supplier"
                    ]
                }
            ]
        },
        "documents": [
            {
                "id": "economic",
                "documentType": "economicSelectionCriteria"
            },
            {
                "id": "technical",
                "documentType": "technicalSelectionCriteria"
            }
        ],
        "otherRequirements": {
            "reductionCriteria": "As specified within the PQQ and/or tender documents available from the address specified at 1.3) above with the reference Project B978 (2022) Building Contractor Craigavon Office"
        },
        "contractTerms": {
            "tendererLegalForm": "As specified within the PQQ and/or tender documents available from the address specified at 1.3) above with the reference Project B978 (2022) Building Contractor Craigavon Office",
            "performanceTerms": "As specified within the PQQ and/or tender documents available from the address specified at 1.3) above with the reference Project B978 (2022) Building Contractor Craigavon Office"
        },
        "procurementMethod": "selective",
        "procurementMethodDetails": "Negotiated procedure with prior call for competition",
        "secondStage": {
            "successiveReduction": true
        },
        "coveredBy": [
            "GPA"
        ],
        "tenderPeriod": {
            "endDate": "2021-11-18T12:00:00Z"
        },
        "submissionTerms": {
            "languages": [
                "en"
            ],
            "bidValidityPeriod": {
                "durationInDays": 180
            }
        },
        "hasRecurrence": false,
        "amendments": [
            {
                "id": "1",
                "unstructuredChanges": [
                    {
                        "oldValue": {
                            "text": "The primary works for this project will include the following: The construction of a new-build energy efficient 2 storey office building on the existing Craigavon site (in the car park area) including all associated building, mechanical and Electrical works in accordance with the project design, Building and Planning Regulations, and any phasing temporary or permanent to facilitate the works * The existing office building and stores facility is to remain operational throughout the duration of the works and a traffic management plan will be required to ensure that construction and site access for day to day business can be separated - NIE Networks will seek alternative car parking arrangements for some of its staff cars. The Contracting Entity estimates that the total spend under the Contract, based on current requirements is between PS5million to PS8million"
                        },
                        "newValue": {
                            "text": "The primary works for this project will include the following: * The construction of a new-build energy efficient 2 storey office building on the existing Craigavon site (in the car park area) including all associated building, mechanical and Electrical works in accordance with the project design, Building and Planning Regulations, and any phasing temporary or permanent to facilitate the works. * The existing office building and stores facility is to remain operational throughout the duration of the works and a traffic management plan will be required to ensure that construction and site access for day to day business can be separated - NIE Networks will seek alternative car parking arrangements for some of its staff cars. Following a review of future requirements, NIE Networks has carried out a level of re-design on the new Craigavon office building. The re-design has increased the overall size of the building, and also incorporated changes to the Control Centre. Due to the design changes a new planning application was required. This has been submitted and it is NIE Networks' intention to conclude the Contract award in parallel with planning. This re-design process has resulted in the estimated cost of the construction increasing. The Contracting Entity now estimates that the total spend under the Contract is between PS8 million to PS11 million. The review of requirements and re-design of the building has also led to a delay in the procurement process and NIE Networks now anticipates that it shall be requesting updated best and final offers from the Economic Operators remaining in the process in January 2024, with a view to the Contract starting September 2024."
                        },
                        "where": {
                            "section": "II.1.4"
                        }
                    },
                    {
                        "oldValue": {
                            "text": "NIE Networks is currently undertaking a programme of refurbishment/upgrades on a number of its key office bases, with the most significant being the replacement of the current office at Craigavon with a new build circa 30,000 square foot office (over 2 floors), which is to be located on the existing site. The primary works for this project will include the following: * The construction of a new-build energy efficient 2 storey office building on the existing Craigavon site (in the car park area) including all associated building, mechanical and Electrical works in accordance with the project design, Building and Planning Regulations, and any phasing temporary or permanent to facilitate the works * The existing office building and stores facility is to remain operational throughout the duration of the works and a traffic management plan will be required to ensure that construction and site access for day to day business can be separated - NIE Networks will seek alternative car parking arrangements for some of its staff cars * The existing mast and associated communications cabling are also to remain in place and operational throughout the duration of the works as this forms a critical part of NIE Networks distribution network * Upon completion and occupation of the new building, the existing building is to be demolished, and the new car parking layout and associated landscaping completed. The secondary works will include the following: * Main contractor to fulfil the role of Principal Contractor under the CDM Regulations for the duration of the work. * Any damage to hard standing areas required for equipment or materials storage or delivery, site cabins, offices etc as required by the main contractor within the site boundary, will be made good at the completion of the project. * Any surface water removal during the construction stage will be the responsibility of the main contractor and should be factored into the costs. * The design of any temporary works will be the main contractor's responsibility. * The main contractor will assume full responsibility for: - Materials and equipment once they have been delivered to site. Any damage or theft will be the contractor's sole responsibility. - Co-ordination of all deliveries associated with the works including traffic management, flag men etc. - The provision, maintenance and repair of all necessary tools, plant, equipment and skips necessary to carry out the required works. - The provision, maintenance, repair and removal on completion of all necessary temporary electrics, potable water supply, lighting, edge protection or other temporary works as necessary to carry out the required works. * The main contractor must ensure that all completed works are properly protected until handover of the site. * Before the commencement of the works the main contractor shall inspect the conditions on site and notify the NIE Networks Client representative/Principal Designer of any conditions which may adversely or otherwise affect the scope of works. * It is the responsibility of the main contractor to ensure that all plant, tools and equipment are used safely and that workers, other contractors, visitors to site and the general public are properly protected."
                        },
                        "newValue": {
                            "text": "NIE Networks is currently undertaking a programme of refurbishment/upgrades on a number of its key office bases, with the most significant being the replacement of the current office at Craigavon with a new build circa 38,000 square foot office (over 2 floors), which is to be located on the existing site. The primary works for this project will include the following: * The construction of a new-build energy efficient 2 storey office building on the existing Craigavon site (in the car park area) including all associated building, mechanical and Electrical works in accordance with the project design, Building and Planning Regulations, and any phasing temporary or permanent to facilitate the works * The existing office building and stores facility is to remain operational throughout the duration of the works and a traffic management plan will be required to ensure that construction and site access for day to day business can be separated - NIE Networks will seek alternative car parking arrangements for some of its staff cars * The existing mast and associated communications cabling are also to remain in place and operational throughout the duration of the works as this forms a critical part of NIE Networks distribution network * Upon completion and occupation of the new building, the existing building is to be demolished, and the new car parking layout and associated landscaping completed. The secondary works will include the following: * Main contractor to fulfil the role of Principal Contractor under the CDM Regulations for the duration of the work. * Any damage to hard standing areas required for equipment or materials storage or delivery, site cabins, offices etc as required by the main contractor within the site boundary, will be made good at the completion of the project. * Any surface water removal during the construction stage will be the responsibility of the main contractor and should be factored into the costs. * The design of any temporary works will be the main contractor's responsibility. * The main contractor will assume full responsibility for: - Materials and equipment once they have been delivered to site. Any damage or theft will be the contractor's sole responsibility. - Co-ordination of all deliveries associated with the works including traffic management, flag men etc. - The provision, maintenance and repair of all necessary tools, plant, equipment and skips necessary to carry out the required works. - The provision, maintenance, repair and removal on completion of all necessary temporary electrics, potable water supply, lighting, edge protection or other temporary works as necessary to carry out the required works. * The main contractor must ensure that all completed works are properly protected until handover of the site. * Before the commencement of the works the main contractor shall inspect the conditions on site and notify the NIE Networks Client representative/Principal Designer of any conditions which may adversely or otherwise affect the scope of works. * It is the responsibility of the main contractor to ensure that all plant, tools and equipment are used safely and that workers, other contractors, visitors to site and the general public are properly protected."
                        },
                        "where": {
                            "section": "II.2.4"
                        }
                    },
                    {
                        "oldValue": {
                            "text": "Start date 3 May 2022 End date 4 January 2023"
                        },
                        "newValue": {
                            "text": "Start date September 2024 End date March 2026"
                        },
                        "where": {
                            "section": "II.2.7"
                        }
                    }
                ]
            }
        ]
    },
    "parties": [
        {
            "id": "GB-FTS-14678",
            "name": "Northern Ireland Electricity Networks",
            "identifier": {
                "legalName": "Northern Ireland Electricity Networks"
            },
            "address": {
                "streetAddress": "120 Malone Road,",
                "locality": "Belfast,",
                "region": "UKN",
                "postalCode": "BT9 5HT",
                "countryName": "United Kingdom"
            },
            "contactPoint": {
                "email": "Anna.McWhirter@nienetworks.co.uk",
                "url": "https://e-sourcingni.bravosolution.co.uk"
            },
            "roles": [
                "buyer"
            ],
            "details": {
                "url": "http://www.nienetworks.co.uk",
                "classifications": [
                    {
                        "scheme": "TED_CE_ACTIVITY",
                        "id": "ELECTRICITY",
                        "description": "Electricity"
                    }
                ]
            }
        },
        {
            "id": "GB-FTS-32031",
            "name": "Northern Ireland Electricity Networks Limited",
            "identifier": {
                "legalName": "Northern Ireland Electricity Networks Limited"
            },
            "address": {
                "streetAddress": "120 Malone Road",
                "locality": "Belfast",
                "countryName": "United Kingdom"
            },
            "roles": [
                "reviewBody"
            ],
            "details": {
                "url": "http://www.nienetworks.co.uk"
            }
        },
        {
            "id": "GB-FTS-14680",
            "name": "High Court of Justice in Northern Ireland",
            "identifier": {
                "legalName": "High Court of Justice in Northern Ireland"
            },
            "address": {
                "streetAddress": "Royal Courts of Justice, Chichester Street",
                "locality": "Belfast",
                "countryName": "United Kingdom"
            },
            "roles": [
                "reviewContactPoint"
            ]
        },
        {
            "id": "GB-FTS-101091",
            "name": "Northern Ireland Electricity Networks",
            "identifier": {
                "legalName": "Northern Ireland Electricity Networks"
            },
            "address": {
                "streetAddress": "120 Malone Road,",
                "locality": "Belfast",
                "region": "UKN",
                "postalCode": "BT9 5HT",
                "countryName": "United Kingdom"
            },
            "contactPoint": {
                "name": "Anna McWhirter",
                "telephone": "+44 3457643643",
                "email": "anna.mcwhirter@nienetworks.co.uk"
            },
            "roles": [
                "buyer"
            ],
            "details": {
                "url": "http://www.nienetworks.co.uk"
            }
        },
        {
            "id": "GB-FTS-150358",
            "name": "MSM Contracts Limited",
            "identifier": {
                "legalName": "MSM Contracts Limited"
            },
            "address": {
                "streetAddress": "Unit 45a Seagoe Industrial Estate",
                "locality": "Portadown",
                "region": "UKN",
                "postalCode": "BT63 5QE",
                "countryName": "United Kingdom"
            },
            "roles": [
                "supplier"
            ],
            "details": {
                "scale": "sme"
            }
        },
        {
            "id": "GB-FTS-150359",
            "name": "High Court of Justice In Northern Ireland",
            "identifier": {
                "legalName": "High Court of Justice In Northern Ireland"
            },
            "address": {
                "streetAddress": "Royal Courts of Justice, Chichester Street",
                "locality": "Belfast",
                "countryName": "United Kingdom"
            },
            "roles": [
                "mediationBody"
            ]
        }
    ],
    "buyer": {
        "id": "GB-FTS-14678",
        "name": "Northern Ireland Electricity Networks"
    },
    "language": "en",
    "awards": [
        {
            "id": "030274-2025-B978 (2022)-1",
            "relatedLots": [
                "1"
            ],
            "status": "active",
            "suppliers": [
                {
                    "id": "GB-FTS-150358",
                    "name": "MSM Contracts Limited"
                }
            ]
        }
    ],
    "contracts": [
        {
            "id": "030274-2025-B978 (2022)-1",
            "awardID": "030274-2025-B978 (2022)-1",
            "status": "active",
            "value": {
                "amount": 11000000,
                "currency": "GBP"
            },
            "dateSigned": "2025-04-14T00:00:00+01:00"
        }
    ],
    "bids": {
        "statistics": [
            {
                "id": "1",
                "measure": "bids",
                "relatedLot": "1",
                "value": 5
            },
            {
                "id": "2",
                "measure": "smeBids",
                "relatedLot": "1",
                "value": 5
            },
            {
                "id": "3",
                "measure": "foreignBidsFromNonEU",
                "relatedLot": "1",
                "value": 5
            },
            {
                "id": "4",
                "measure": "electronicBids",
                "relatedLot": "1",
                "value": 5
            }
        ]
    }
}