Notice Information
Notice Title
UKRI-2253 R80 Tower Decommissioning and Adiabatic Cooler Design and Build
Notice Description
UKRI wishes to establish a Contract for the provision of R80 Tower Decommissioning and Adiabatic Cooler Design and Build. The estimated value of this opportunity is PS1,000,000 - PS1,500,000. The scope includes management and delivery of design and construction services for the R80 Chilled water and process systems at the site address Rutherford Appleton Laboratory, Harwell, Oxford, Didcot OX11 0QX. The Contractor is required to act as a design and build contractor and will be responsible for all civil, mechanical, electrical construction; installation and commissioning of the following - but not limited to - within the CDM Works area (i.e., The R80 roof area) and in accordance with the Completion Dates (See Provisional Programme within Appendix D - UKRI-1404 Project Brief). - 8 No New Adiabatic coolers (AC's). - Connecting pipework and fittings to and the new AC's within the CDM Works Area. - All types of valves (isolation, regulating, non-return either manual or actuated). - Commissioning sets and pressure reducing valves. - Testing and drainage points. - Basket and other Filters. - All steel support work for the Adiabatic Coolers. - All pipework supports. - All local electrical power and signal cabling with cable trays etc and supports. - All necessary civil surveying /setting out work. The Contractor will be entirely responsible for organising the decommissioning and removal of the existing Balticare Cooling Towers within the CDM Works Area. The aim is to modernize both the chilled and process water circuits. The preferred option is to cool the Process Water returned from the Hall's area with a bank of 8 No 'V' Adiabatic Coolers capable of providing up to 3.2 MW cooling. These will be direct replacements for the existing BAC cooling towers. The chillers - located in the adjacent plant room -will also be replaced (under a separate tender see R80-TECH--09A) with a number of more energy efficient modular alternatives (e.g. TURBOCOR range using a low GWP / non-flammable alternative refrigerant e.g. R513a) so as to provide a total Chilled water cooling capacity of 2.4MW. The chilled water system will remain as a primary circuit only since there is sufficient chilled water capacity (estimated 30 m3) within the large flow and return header pipes installed to the Hall's area.
Lot Information
Lot 1
This PIN is to advise the market of this procurement and to provide details on the planned Market Engagement to be held week commencing 27th June. This will provide an opportunity to find out more about the requirement as well as provide valuable feedback. The intention is to hold individual sessions with each interested party. If you are interested in participating, please send an email to STFCprocurement@ukri.org for more information. Background The ISIS Neutron and Muon Source is a world-leading centre for research at the STFC Rutherford Appleton Laboratory near Oxford. The R80 facility houses the Second Target Station (TS2) and its associated neutron beamlines. At the end of each beam line is an instrument hut complete with research instrumentation all of which require a source of suitably graded cold demineralised water. The Demin cooling water used to cool the target is provided by a 'closed loop' circuit with the duty/standby pump arrangement; two Plate Heat Exchangers (PHExs) and associated controls situated within the Level 2 West Plant Area T222. Likewise, the instrument water is fed from a similar set up situated within the Level 2 West Plant Area T220 on the same storey. A source of cooling is also necessary for the focusing magnets and associated power supplies along the main proton beamline that leads to TS2 - known as the Extract Proton Beamline 2 or EPB2. The R6 Plant link room - situated in the corridor that links the R6 facility to R80 - houses the EPB2 Magnet Demin cooling water system and a separate power supplies Demin circuit. All the above 'closed loop' water circuits contain a 'coarse' grade cooling PHEx that uses the process water (PW) and a PHEx fed with chilled water (CHW) used to 'trim' each circuit Demin to the required Semin water supply temperature. Currently the process water circuit is a 'closed circuit' system comprising of 5 No Balticare (BAC) VX1-180-4+XB towers each rated at 800 kW. These towers are located on the R80 4th floor roof. Adjacent to the roof area leading to the first two towers is the R80 Chilled Water Plant room (Level 4 West plant room T410) which houses both the duty/standby process water pumps and 3 No TRANE 850 kW R134a charged RTHD C2 D5 E4 Chillers which are water cooled using the PW. Flow is maintained through the packaged chillers and primary loop header system by duty/standby chilled water pumps located within the Level 2 West plan room T222 together with the target circuit. Besides providing cooling to the different CHW PHExs mentioned above the chilled water system also provides substantial space cooling via Fan Coil Units (FCUs) situated in the R80 office; laboratories; server and control rooms. The water circuits were originally designed and installed by HADEN-YOUNG during the original construction phase of the R80 facility in 2006. Additional information: This is not a Call for Competition. A Contract Notice will be issued as a call for competition. Not registering an interest shall not prevent any supplier participating in a future procurement, nor is it intended that any information supplied shall place any supplier at an advantage in a potential procurement process.
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-h6vhtk-034735
- Publication Source
- Find A Tender Service
- Latest Notice
- https://www.find-tender.service.gov.uk/Notice/016528-2022
- Current Stage
- Planning
- All Stages
- Planning
Procurement Classification
- Notice Type
- Planning Notice
- Procurement Type
- Standard
- Procurement Category
- Works
- Procurement Method
- Not Specified
- Procurement Method Details
- Not specified
- Tender Suitability
- Not specified
- Awardee Scale
- Not specified
Common Procurement Vocabulary (CPV)
- CPV Divisions
45 - Construction work
-
- CPV Codes
45331230 - Installation work of cooling equipment
Notice Value(s)
- Tender Value
- £1,250,000 £1M-£10M
- Lots Value
- Not specified
- Awards Value
- Not specified
- Contracts Value
- Not specified
Notice Dates
- Publication Date
- 16 Jun 20223 years ago
- Submission Deadline
- Not specified
- Future Notice Date
- 17 Jul 2022Expired
- Award Date
- Not specified
- Contract Period
- Not specified - Not specified
- Recurrence
- Not specified
Notice Status
- Tender Status
- Planned
- Lots Status
- Planned
- Awards Status
- Not Specified
- Contracts Status
- Not Specified
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- UK RESEARCH AND INNOVATION
- Contact Name
- STFC Procurement
- Contact Email
- procurement@stfc.ac.uk
- Contact Phone
- +44 1793442000
Buyer Location
- Locality
- SWINDON
- Postcode
- SN2 1FL
- Post Town
- Swindon
- Country
- England
-
- Major Region (ITL 1)
- TLK South West (England)
- Basic Region (ITL 2)
- TLK7 Gloucestershire and Wiltshire
- Small Region (ITL 3)
- TLK71 Swindon
- Delivery Location
- Not specified
-
- Local Authority
- Swindon
- Electoral Ward
- Rodbourne Cheney
- Westminster Constituency
- Swindon North
Further Information
Open Contracting Data Standard (OCDS)
View full OCDS Record for this contracting process
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.
{
"tag": [
"compiled"
],
"id": "ocds-h6vhtk-034735-2022-06-16T12:05:10+01:00",
"date": "2022-06-16T12:05:10+01:00",
"ocid": "ocds-h6vhtk-034735",
"description": "To view this notice, please click here: https://ukri.delta-esourcing.com/delta/viewNotice.html?noticeId=697281305 GO Reference: GO-2022616-PRO-20332494",
"initiationType": "tender",
"tender": {
"id": "UKRI-2253",
"legalBasis": {
"id": "32014L0024",
"scheme": "CELEX"
},
"title": "UKRI-2253 R80 Tower Decommissioning and Adiabatic Cooler Design and Build",
"status": "planned",
"classification": {
"scheme": "CPV",
"id": "45331230",
"description": "Installation work of cooling equipment"
},
"mainProcurementCategory": "works",
"description": "UKRI wishes to establish a Contract for the provision of R80 Tower Decommissioning and Adiabatic Cooler Design and Build. The estimated value of this opportunity is PS1,000,000 - PS1,500,000. The scope includes management and delivery of design and construction services for the R80 Chilled water and process systems at the site address Rutherford Appleton Laboratory, Harwell, Oxford, Didcot OX11 0QX. The Contractor is required to act as a design and build contractor and will be responsible for all civil, mechanical, electrical construction; installation and commissioning of the following - but not limited to - within the CDM Works area (i.e., The R80 roof area) and in accordance with the Completion Dates (See Provisional Programme within Appendix D - UKRI-1404 Project Brief). - 8 No New Adiabatic coolers (AC's). - Connecting pipework and fittings to and the new AC's within the CDM Works Area. - All types of valves (isolation, regulating, non-return either manual or actuated). - Commissioning sets and pressure reducing valves. - Testing and drainage points. - Basket and other Filters. - All steel support work for the Adiabatic Coolers. - All pipework supports. - All local electrical power and signal cabling with cable trays etc and supports. - All necessary civil surveying /setting out work. The Contractor will be entirely responsible for organising the decommissioning and removal of the existing Balticare Cooling Towers within the CDM Works Area. The aim is to modernize both the chilled and process water circuits. The preferred option is to cool the Process Water returned from the Hall's area with a bank of 8 No 'V' Adiabatic Coolers capable of providing up to 3.2 MW cooling. These will be direct replacements for the existing BAC cooling towers. The chillers - located in the adjacent plant room -will also be replaced (under a separate tender see R80-TECH--09A) with a number of more energy efficient modular alternatives (e.g. TURBOCOR range using a low GWP / non-flammable alternative refrigerant e.g. R513a) so as to provide a total Chilled water cooling capacity of 2.4MW. The chilled water system will remain as a primary circuit only since there is sufficient chilled water capacity (estimated 30 m3) within the large flow and return header pipes installed to the Hall's area.",
"value": {
"amount": 1250000,
"currency": "GBP"
},
"lots": [
{
"id": "1",
"description": "This PIN is to advise the market of this procurement and to provide details on the planned Market Engagement to be held week commencing 27th June. This will provide an opportunity to find out more about the requirement as well as provide valuable feedback. The intention is to hold individual sessions with each interested party. If you are interested in participating, please send an email to STFCprocurement@ukri.org for more information. Background The ISIS Neutron and Muon Source is a world-leading centre for research at the STFC Rutherford Appleton Laboratory near Oxford. The R80 facility houses the Second Target Station (TS2) and its associated neutron beamlines. At the end of each beam line is an instrument hut complete with research instrumentation all of which require a source of suitably graded cold demineralised water. The Demin cooling water used to cool the target is provided by a 'closed loop' circuit with the duty/standby pump arrangement; two Plate Heat Exchangers (PHExs) and associated controls situated within the Level 2 West Plant Area T222. Likewise, the instrument water is fed from a similar set up situated within the Level 2 West Plant Area T220 on the same storey. A source of cooling is also necessary for the focusing magnets and associated power supplies along the main proton beamline that leads to TS2 - known as the Extract Proton Beamline 2 or EPB2. The R6 Plant link room - situated in the corridor that links the R6 facility to R80 - houses the EPB2 Magnet Demin cooling water system and a separate power supplies Demin circuit. All the above 'closed loop' water circuits contain a 'coarse' grade cooling PHEx that uses the process water (PW) and a PHEx fed with chilled water (CHW) used to 'trim' each circuit Demin to the required Semin water supply temperature. Currently the process water circuit is a 'closed circuit' system comprising of 5 No Balticare (BAC) VX1-180-4+XB towers each rated at 800 kW. These towers are located on the R80 4th floor roof. Adjacent to the roof area leading to the first two towers is the R80 Chilled Water Plant room (Level 4 West plant room T410) which houses both the duty/standby process water pumps and 3 No TRANE 850 kW R134a charged RTHD C2 D5 E4 Chillers which are water cooled using the PW. Flow is maintained through the packaged chillers and primary loop header system by duty/standby chilled water pumps located within the Level 2 West plan room T222 together with the target circuit. Besides providing cooling to the different CHW PHExs mentioned above the chilled water system also provides substantial space cooling via Fan Coil Units (FCUs) situated in the R80 office; laboratories; server and control rooms. The water circuits were originally designed and installed by HADEN-YOUNG during the original construction phase of the R80 facility in 2006. Additional information: This is not a Call for Competition. A Contract Notice will be issued as a call for competition. Not registering an interest shall not prevent any supplier participating in a future procurement, nor is it intended that any information supplied shall place any supplier at an advantage in a potential procurement process.",
"status": "planned"
}
],
"items": [
{
"id": "1",
"deliveryAddresses": [
{
"region": "UK"
}
],
"deliveryLocation": {
"description": "UNITED KINGDOM"
},
"relatedLot": "1"
}
],
"communication": {
"futureNoticeDate": "2022-07-18T00:00:00+01:00"
},
"coveredBy": [
"GPA"
]
},
"parties": [
{
"id": "GB-FTS-544",
"name": "UK Research and Innovation",
"identifier": {
"legalName": "UK Research and Innovation"
},
"address": {
"streetAddress": "Polaris House, North Star Avenue",
"locality": "Swindon",
"region": "UK",
"postalCode": "SN2 1FL",
"countryName": "United Kingdom"
},
"contactPoint": {
"name": "STFC Procurement",
"telephone": "+44 1793442000",
"email": "procurement@stfc.ac.uk"
},
"roles": [
"buyer"
],
"details": {
"url": "https://www.ukri.org",
"classifications": [
{
"scheme": "TED_CA_TYPE",
"id": "BODY_PUBLIC",
"description": "Body governed by public law"
},
{
"scheme": "COFOG",
"description": "Research and Innovation"
}
]
}
}
],
"buyer": {
"id": "GB-FTS-544",
"name": "UK Research and Innovation"
},
"language": "en"
}