Notice Information
Notice Title
Depot Protection System Supply and Installation
Notice Description
This contract is for the supply, installation, M&E and Civils works for a depot protection system. Split into lots Lot 1 for the upgrade/replacement of an existing system at the Nottingha, Eastcroft Depot Lot 2 is for a complete new system at the Derby Etches Park Depot
Lot Information
Eastcroft Depot Protection Upgrade
Lot 1 is for the upgrade of the existing Depot Protection System currently fitted at Nottingham Eastcroft depot,inclusive of supply, install, M&E andCivils works. The installation works will be subject to Network Rail Engineering assurance process requiring design submission. At this stage understood to be Civ003. EMR would like to retain as much of the existing system as possible therefore any additional equipment would need to be compatiable with the existing Infrastructure. The current depot protection control panel make use of a Mitsubishi style programable logic controller "PLC". The derailer control panels utilise printed circuit boards. The ground position shunt signals on site are Howells signals utilising xenon lamp technology. It is understood that all control equipment is now obsolete and require replacement with modern alternative. Bidders to price to install in line with relevant NR Standards. All redundant equipment to be removed from site. Each road to have a log on point, with central monitoring location located within shift managers office. Depot protection system to interlock with extraction system to shed roads to activate extraction systems on train movements. Bidders responsible formaking necessary connections. There are requirements to provide interlocks with the depot roller shutterdoors at either end of shed (4 rollerdoors in total) The successful bidder to reutilise existing derailers at west end of the shed repositioning at 2 car markers(50m) with addition of train obstruction sensor. Bidder to allow for all associated civils and M&E work. Derailer to east of road 4 to be retained in current position, addition of train obstruction sensor. Installation of depot protection system to the fuel road. Protection signal to be controlled via signal and to not allow train movement whilst colleagues are 'logged on'. Fuel road to have dedicated log onpoint located within close proximity. Contractor to make allowances to issue all production staff (Circa 75) with ability to 'log on' to depot protection system. plus, passive provision for 25 spare 'log ons' for visitors
Etches Park Depot Protection Supply and InstallationLot 2 is for the supply and installation ofa Depot Protection System inclusive of M&E and Civils works. The installation works will be subject to Network Rail Engineering assurance process requiring design submission. At this stage understood to be Civ003. Bidders to price to install in line with relevant NR Standards. Each road to have a north and southend a log on points (2 points perroad). System to included central monitoring location located within shift managers office. Roads 8-6 circa 150m, Roads 5&4 circa 170m and UFC circa 120m. All Roads feature inspection pits Bidders to install derailer to each road with related signal equipment. Interlocks to be added to each road to interact with roller doors. Additional interlock required to work in conjunction with jack usage on road 7. Interlock tobe added to overhead crane operations over roads 8-6. Bidder to install interlock connectivity to jacking control box and responsible for commissioning. Passage provision for further interlocks to be added to road 8. Depot protection system to interlock with extraction system to roads 4-8 to activate extraction systems on train movements. Bidders responsible for making necessary connections. Contractor to make allowances to issue all production staff (Circa 110) with ability to 'log on' to depot protection system. Plus passive provision for 30 spare 'log ons' for visitors
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-h6vhtk-03c336
- Publication Source
- Find A Tender Service
- Latest Notice
- https://www.find-tender.service.gov.uk/Notice/000194-2024
- Current Stage
- Award
- All Stages
- Tender, Award
Procurement Classification
- Notice Type
- Tender Notice
- Procurement Type
- Standard
- Procurement Category
- Goods
- Procurement Method
- Selective
- Procurement Method Details
- Negotiated procedure with prior call for competition
- Tender Suitability
- Not specified
- Awardee Scale
- Not specified
Common Procurement Vocabulary (CPV)
- CPV Divisions
34 - Transport equipment and auxiliary products to transportation
-
- CPV Codes
34946120 - Railway materials
Notice Value(s)
- Tender Value
- Not specified
- Lots Value
- Not specified
- Awards Value
- Not specified
- Contracts Value
- Not specified
Notice Dates
- Publication Date
- 4 Jan 20242 years ago
- Submission Deadline
- 24 May 2023Expired
- Future Notice Date
- Not specified
- Award Date
- 10 Nov 20232 years ago
- Contract Period
- Not specified - Not specified
- Recurrence
- Not specified
Notice Status
- Tender Status
- Complete
- Lots Status
- Cancelled
- Awards Status
- Active
- Contracts Status
- Active
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- ABELLIO EAST MIDLANDS LIMITED
- Contact Name
- Emma Martin
- Contact Email
- emma.martin@eastmidlandsrailway.co.uk
- Contact Phone
- +44 7917636540
Buyer Location
- Locality
- LONDON
- Postcode
- EC4A 3AG
- Post Town
- Central London
- Country
- England
-
- Major Region (ITL 1)
- TLI London
- Basic Region (ITL 2)
- TLI3 Inner London - West
- Small Region (ITL 3)
- TLI35 Westminster and City of London
- Delivery Location
- TLF East Midlands (England)
-
- Local Authority
- City of London
- Electoral Ward
- Castle Baynard
- Westminster Constituency
- Cities of London and Westminster
Further Information
Open Contracting Data Standard (OCDS)
View full OCDS Record for this contracting process
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.
{
"tag": [
"compiled"
],
"id": "ocds-h6vhtk-03c336-2024-01-04T11:11:53Z",
"date": "2024-01-04T11:11:53Z",
"ocid": "ocds-h6vhtk-03c336",
"initiationType": "tender",
"tender": {
"id": "2023/S 000-011518",
"legalBasis": {
"id": "32014L0025",
"scheme": "CELEX"
},
"title": "Depot Protection System Supply and Installation",
"status": "complete",
"classification": {
"scheme": "CPV",
"id": "34946120",
"description": "Railway materials"
},
"mainProcurementCategory": "goods",
"description": "This contract is for the supply, installation, M&E and Civils works for a depot protection system. Split into lots Lot 1 for the upgrade/replacement of an existing system at the Nottingha, Eastcroft Depot Lot 2 is for a complete new system at the Derby Etches Park Depot",
"lotDetails": {
"maximumLotsBidPerSupplier": 1
},
"lots": [
{
"id": "1",
"title": "Eastcroft Depot Protection Upgrade",
"description": "Lot 1 is for the upgrade of the existing Depot Protection System currently fitted at Nottingham Eastcroft depot,inclusive of supply, install, M&E andCivils works. The installation works will be subject to Network Rail Engineering assurance process requiring design submission. At this stage understood to be Civ003. EMR would like to retain as much of the existing system as possible therefore any additional equipment would need to be compatiable with the existing Infrastructure. The current depot protection control panel make use of a Mitsubishi style programable logic controller \"PLC\". The derailer control panels utilise printed circuit boards. The ground position shunt signals on site are Howells signals utilising xenon lamp technology. It is understood that all control equipment is now obsolete and require replacement with modern alternative. Bidders to price to install in line with relevant NR Standards. All redundant equipment to be removed from site. Each road to have a log on point, with central monitoring location located within shift managers office. Depot protection system to interlock with extraction system to shed roads to activate extraction systems on train movements. Bidders responsible formaking necessary connections. There are requirements to provide interlocks with the depot roller shutterdoors at either end of shed (4 rollerdoors in total) The successful bidder to reutilise existing derailers at west end of the shed repositioning at 2 car markers(50m) with addition of train obstruction sensor. Bidder to allow for all associated civils and M&E work. Derailer to east of road 4 to be retained in current position, addition of train obstruction sensor. Installation of depot protection system to the fuel road. Protection signal to be controlled via signal and to not allow train movement whilst colleagues are 'logged on'. Fuel road to have dedicated log onpoint located within close proximity. Contractor to make allowances to issue all production staff (Circa 75) with ability to 'log on' to depot protection system. plus, passive provision for 25 spare 'log ons' for visitors",
"contractPeriod": {
"durationInDays": 210
},
"hasRenewal": false,
"submissionTerms": {
"variantPolicy": "notAllowed"
},
"hasOptions": false,
"status": "cancelled"
},
{
"id": "2",
"title": "Etches Park Depot Protection Supply and Installation",
"description": "Lot 2 is for the supply and installation ofa Depot Protection System inclusive of M&E and Civils works. The installation works will be subject to Network Rail Engineering assurance process requiring design submission. At this stage understood to be Civ003. Bidders to price to install in line with relevant NR Standards. Each road to have a north and southend a log on points (2 points perroad). System to included central monitoring location located within shift managers office. Roads 8-6 circa 150m, Roads 5&4 circa 170m and UFC circa 120m. All Roads feature inspection pits Bidders to install derailer to each road with related signal equipment. Interlocks to be added to each road to interact with roller doors. Additional interlock required to work in conjunction with jack usage on road 7. Interlock tobe added to overhead crane operations over roads 8-6. Bidder to install interlock connectivity to jacking control box and responsible for commissioning. Passage provision for further interlocks to be added to road 8. Depot protection system to interlock with extraction system to roads 4-8 to activate extraction systems on train movements. Bidders responsible for making necessary connections. Contractor to make allowances to issue all production staff (Circa 110) with ability to 'log on' to depot protection system. Plus passive provision for 30 spare 'log ons' for visitors",
"contractPeriod": {
"durationInDays": 210
},
"hasRenewal": false,
"submissionTerms": {
"variantPolicy": "notAllowed"
},
"hasOptions": false,
"status": "cancelled"
}
],
"items": [
{
"id": "1",
"additionalClassifications": [
{
"scheme": "CPV",
"id": "34946120",
"description": "Railway materials"
}
],
"deliveryAddresses": [
{
"region": "UKF"
},
{
"region": "UKF"
}
],
"deliveryLocation": {
"description": "Nottingham Eastcroft Depot"
},
"relatedLot": "1"
},
{
"id": "2",
"additionalClassifications": [
{
"scheme": "CPV",
"id": "34946120",
"description": "Railway materials"
}
],
"deliveryAddresses": [
{
"region": "UKF"
},
{
"region": "UKF"
}
],
"deliveryLocation": {
"description": "Etches Park Depot, Derby"
},
"relatedLot": "2"
}
],
"participationFees": [
{
"id": "1",
"type": [
"document"
]
}
],
"submissionMethod": [
"electronicSubmission"
],
"submissionMethodDetails": "http://redirect.transaxions.com/events/ZxbU3",
"procurementMethod": "selective",
"procurementMethodDetails": "Negotiated procedure with prior call for competition",
"tenderPeriod": {
"endDate": "2023-05-24T12:00:00+01:00"
},
"submissionTerms": {
"languages": [
"en"
]
},
"hasRecurrence": false,
"contractTerms": {
"hasElectronicOrdering": true,
"electronicInvoicingPolicy": "allowed",
"hasElectronicPayment": true
}
},
"parties": [
{
"id": "GB-COH-09860485",
"name": "ABELLIO EAST MIDLANDS LIMITED",
"identifier": {
"legalName": "ABELLIO EAST MIDLANDS LIMITED",
"id": "09860485",
"scheme": "GB-COH"
},
"address": {
"streetAddress": "2nd Floor St Andrew's House,18-20 St Andrew Street",
"locality": "LONDON",
"region": "UKI31",
"postalCode": "EC4A3AG",
"countryName": "United Kingdom"
},
"contactPoint": {
"name": "Emma Martin",
"telephone": "+44 7917636540",
"email": "Emma.martin@eastmidlandsrailway.co.uk",
"url": "http://redirect.transaxions.com/events/ZxbU3"
},
"roles": [
"buyer"
],
"details": {
"url": "http://www.eastmidlandsrailway.co.uk",
"classifications": [
{
"scheme": "TED_CE_ACTIVITY",
"id": "RAILWAY_SERVICES",
"description": "Railway services"
}
]
}
},
{
"id": "GB-FTS-40711",
"name": "Abellio East Midlands Railway",
"identifier": {
"legalName": "Abellio East Midlands Railway"
},
"address": {
"locality": "Derby",
"countryName": "United Kingdom"
},
"roles": [
"reviewBody"
]
},
{
"id": "GB-FTS-101730",
"name": "Abellio East MIdlands Railway",
"identifier": {
"legalName": "Abellio East MIdlands Railway"
},
"address": {
"locality": "Derby",
"countryName": "United Kingdom"
},
"roles": [
"reviewBody"
]
}
],
"buyer": {
"id": "GB-COH-09860485",
"name": "ABELLIO EAST MIDLANDS LIMITED"
},
"language": "en",
"awards": [
{
"id": "000194-2024-1",
"relatedLots": [
"1"
],
"title": "Eastcroft Depot Protection Upgrade",
"status": "active"
},
{
"id": "000194-2024-2",
"relatedLots": [
"2"
],
"title": "Etches Park Depot Protection Supply and Installation",
"status": "active"
}
],
"contracts": [
{
"id": "000194-2024-1",
"awardID": "000194-2024-1",
"title": "Eastcroft Depot Protection Upgrade",
"status": "active",
"dateSigned": "2023-11-10T00:00:00Z"
},
{
"id": "000194-2024-2",
"awardID": "000194-2024-2",
"title": "Etches Park Depot Protection Supply and Installation",
"status": "active",
"dateSigned": "2023-11-13T00:00:00Z"
}
]
}