Notice Information
Notice Title
Modifications to Henderson Dry Dock at the Port of Immingham
Notice Description
Procurement of the Principal Contractor for the design and construction of works to modify Henderson Dry Dock, remove RORO (Roll On Roll Off) ramps, partially demolish the sill and undertake remodelling works required to the quay. Please respond to this PIN by email to procurement@abports.co.uk
Lot Information
Modifications to Henderson Dry Dock at the Port of Immingham Including Increasing the Depth
The aim of this project is to increase the draft of vessels can be accommodated in Henderson Dry Dock. The design and construction works to be undertaken by the principal contractor will include, but are not limited to the following main elements: Completion of the design. The Contractor will complete the design of the permanent works and undertake the full design and detail of the temporary works including shoring of the HDD (Henderson Dry Dock) walls and cofferdam. Site establishment and preparations. Construction Works - Installing a cofferdam to the front of the Dry Dock; - Pumping out the Dry Dock; - Install temporary works to restrain dry dock walls - Remove and dispose of the remaining sediment to the base of the dry dock; - Break out and remove sill; - Increase the depth of the dry dock by approximately 1m by means of breaking out or planning concrete; - Removal and disposal of the RORO ramps (concrete slab over steel ramp); - Extend broken back dry dock walls (under RORO Ramp) to ground level and make good surrounding paving; - Associated mooring / quay furniture - Removal of cofferdam and other temporary works; - Performance monitoring of the new structure including undertaking surveys during the defects period.
Modifications to Henderson Dry Dock at the Port of Immingham Excluding Works Associated with Increasing the DepthThe aim of this project is to modify Henderson Dry Dock to meet business requirements without increasing the depth. The design and construction works to be undertaken by the principal contractor will include, but are not limited to the following main elements: Completion of the design. The Contractor will complete the design of the permanent works and undertake the full design and detail of the temporary works. Site establishment and preparations. Construction Works - Install temporary works to allow breaking out of sill; - Break out and remove sill; - Removal and disposal of the RORO ramps (concrete slab over steel ramp); - Extend broken back Dry dock walls (under RORO Ramp) to ground level and make good surrounding paving; - Removal of temporary works;- Associated mooring / quay furniture
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-h6vhtk-03ec1f
- Publication Source
- Find A Tender Service
- Latest Notice
- https://www.find-tender.service.gov.uk/Notice/022350-2023
- Current Stage
- Planning
- All Stages
- Planning
Procurement Classification
- Notice Type
- Planning Notice
- Procurement Type
- Standard
- Procurement Category
- Works
- Procurement Method
- Not Specified
- Procurement Method Details
- Not specified
- Tender Suitability
- Not specified
- Awardee Scale
- Not specified
Common Procurement Vocabulary (CPV)
- CPV Divisions
45 - Construction work
-
- CPV Codes
45213342 - Ro-ro terminal construction work
45240000 - Construction work for water projects
45241100 - Quay construction work
45241400 - Dock construction work
45244000 - Marine construction works
Notice Value(s)
- Tender Value
- Not specified
- Lots Value
- Not specified
- Awards Value
- Not specified
- Contracts Value
- Not specified
Notice Dates
- Publication Date
- 1 Aug 20232 years ago
- Submission Deadline
- Not specified
- Future Notice Date
- 4 Sep 2023Expired
- Award Date
- Not specified
- Contract Period
- Not specified - Not specified
- Recurrence
- Not specified
Notice Status
- Tender Status
- Planned
- Lots Status
- Planned
- Awards Status
- Not Specified
- Contracts Status
- Not Specified
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- ASSOCIATED BRITISH PORTS
- Contact Name
- Group Procurement
- Contact Email
- procurement@abports.co.uk
- Contact Phone
- Not specified
Buyer Location
- Locality
- LONDON
- Postcode
- WC2E 9ES
- Post Town
- Central London
- Country
- England
-
- Major Region (ITL 1)
- TLI London
- Basic Region (ITL 2)
- TLI3 Inner London - West
- Small Region (ITL 3)
- TLI35 Westminster and City of London
- Delivery Location
- TLE13 North and North East Lincolnshire
-
- Local Authority
- Westminster
- Electoral Ward
- St James's
- Westminster Constituency
- Cities of London and Westminster
Further Information
Open Contracting Data Standard (OCDS)
View full OCDS Record for this contracting process
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.
{
"tag": [
"compiled"
],
"id": "ocds-h6vhtk-03ec1f-2023-08-01T15:32:13+01:00",
"date": "2023-08-01T15:32:13+01:00",
"ocid": "ocds-h6vhtk-03ec1f",
"initiationType": "tender",
"tender": {
"id": "ocds-h6vhtk-03ec1f",
"legalBasis": {
"id": "32014L0024",
"scheme": "CELEX"
},
"title": "Modifications to Henderson Dry Dock at the Port of Immingham",
"status": "planned",
"classification": {
"scheme": "CPV",
"id": "45240000",
"description": "Construction work for water projects"
},
"mainProcurementCategory": "works",
"description": "Procurement of the Principal Contractor for the design and construction of works to modify Henderson Dry Dock, remove RORO (Roll On Roll Off) ramps, partially demolish the sill and undertake remodelling works required to the quay. Please respond to this PIN by email to procurement@abports.co.uk",
"lots": [
{
"id": "1",
"title": "Modifications to Henderson Dry Dock at the Port of Immingham Including Increasing the Depth",
"description": "The aim of this project is to increase the draft of vessels can be accommodated in Henderson Dry Dock. The design and construction works to be undertaken by the principal contractor will include, but are not limited to the following main elements: Completion of the design. The Contractor will complete the design of the permanent works and undertake the full design and detail of the temporary works including shoring of the HDD (Henderson Dry Dock) walls and cofferdam. Site establishment and preparations. Construction Works - Installing a cofferdam to the front of the Dry Dock; - Pumping out the Dry Dock; - Install temporary works to restrain dry dock walls - Remove and dispose of the remaining sediment to the base of the dry dock; - Break out and remove sill; - Increase the depth of the dry dock by approximately 1m by means of breaking out or planning concrete; - Removal and disposal of the RORO ramps (concrete slab over steel ramp); - Extend broken back dry dock walls (under RORO Ramp) to ground level and make good surrounding paving; - Associated mooring / quay furniture - Removal of cofferdam and other temporary works; - Performance monitoring of the new structure including undertaking surveys during the defects period.",
"status": "planned"
},
{
"id": "2",
"title": "Modifications to Henderson Dry Dock at the Port of Immingham Excluding Works Associated with Increasing the Depth",
"description": "The aim of this project is to modify Henderson Dry Dock to meet business requirements without increasing the depth. The design and construction works to be undertaken by the principal contractor will include, but are not limited to the following main elements: Completion of the design. The Contractor will complete the design of the permanent works and undertake the full design and detail of the temporary works. Site establishment and preparations. Construction Works - Install temporary works to allow breaking out of sill; - Break out and remove sill; - Removal and disposal of the RORO ramps (concrete slab over steel ramp); - Extend broken back Dry dock walls (under RORO Ramp) to ground level and make good surrounding paving; - Removal of temporary works;- Associated mooring / quay furniture",
"status": "planned"
}
],
"items": [
{
"id": "1",
"additionalClassifications": [
{
"scheme": "CPV",
"id": "45240000",
"description": "Construction work for water projects"
},
{
"scheme": "CPV",
"id": "45244000",
"description": "Marine construction works"
},
{
"scheme": "CPV",
"id": "45241100",
"description": "Quay construction work"
},
{
"scheme": "CPV",
"id": "45241400",
"description": "Dock construction work"
},
{
"scheme": "CPV",
"id": "45213342",
"description": "Ro-ro terminal construction work"
}
],
"deliveryAddresses": [
{
"region": "UKE13"
}
],
"deliveryLocation": {
"description": "Port of Immingham"
},
"relatedLot": "1"
},
{
"id": "2",
"additionalClassifications": [
{
"scheme": "CPV",
"id": "45240000",
"description": "Construction work for water projects"
},
{
"scheme": "CPV",
"id": "45244000",
"description": "Marine construction works"
},
{
"scheme": "CPV",
"id": "45241100",
"description": "Quay construction work"
},
{
"scheme": "CPV",
"id": "45241400",
"description": "Dock construction work"
},
{
"scheme": "CPV",
"id": "45213342",
"description": "Ro-ro terminal construction work"
}
],
"deliveryAddresses": [
{
"region": "UKE13"
}
],
"relatedLot": "2"
}
],
"communication": {
"futureNoticeDate": "2023-09-05T00:00:00+01:00"
}
},
"parties": [
{
"id": "GB-FTS-6635",
"name": "Associated British Ports",
"identifier": {
"legalName": "Associated British Ports"
},
"address": {
"streetAddress": "25 Bedford Street",
"locality": "London",
"region": "UKE13",
"postalCode": "WC2E 9ES",
"countryName": "United Kingdom"
},
"contactPoint": {
"name": "Group Procurement",
"email": "procurement@abports.co.uk"
},
"roles": [
"buyer"
],
"details": {
"url": "https://in-tendhost.co.uk/abp/aspx/Tenders/Current",
"buyerProfile": "https://in-tendhost.co.uk/abp/aspx/Tenders/Current",
"classifications": [
{
"scheme": "TED_CA_TYPE",
"description": "Utility"
},
{
"scheme": "COFOG",
"description": "Port Operator"
}
]
}
}
],
"buyer": {
"id": "GB-FTS-6635",
"name": "Associated British Ports"
},
"language": "en"
}