Notice Information
Notice Title
PRO004738-Works-Contract- MBC Biomethane and CO2 Plant
Notice Description
UU (United Utilities Water Limited) UU are proposing to install new Gas to Grid upgrading plant with a Biomethane / CO2 carbon capture (liquified) that takes all the on-site generated gas (~ 6000nm3/hr) from our existing Anaerobic digestion storage for export into the gas network. Developing our future strategy we are undertaking pre-market research to understand market offerings for the following services UU are interested in understanding how this model can be delivered, and the best technical solution Responses detailing variations of the above services are welcome.
Lot Information
Lot 1
UU (United Utilities Water Limited) UU are proposing to install new Gas to Grid upgrading plant with a Biomethane / CO2 carbon capture (liquified) that takes all the on-site generated gas (~ 6000nm3/hr) from our existing Anaerobic digestion storage for export into the gas network. UU are interested in understanding how this model can be delivered, and the best technical solution Developing our future strategy we are undertaking pre-market research to understand market offerings for the following services Our initial design for the main plant items include the following Responses detailing variations of the above services are welcome. * Dual stream 'Amine solution' Chemical wash plant o 6000Nm3/hr of biogas treatment for export to local gas network o Pre-treatment conditioning of biogas (VOC / Siloxane / H2S removal) o Analytical monitoring / control of gas quality to ensure product is suitable for export * Grid Export Unit (GEU) - kiosk based solution o Arrangement of valves & pipework for the provision of o Isolation / diversion of the gas between export point & flare stack o Biogas flare stack for emergency burning of surplice gas o Analytical monitoring / control of gas quality to ensure product is suitable for export * Remote Operating Valve (ROV) assembly - kiosk based solution o Arrangement of valves & pipework for the provision of o Valve isolation system to prevent the export gas in the event of quality / gas network issues o Analytical monitoring / control of gas quality to ensure product is suitable for export * CO2 capture / recovery Plant (off- gas product of the Chemical Wash Plant) o Liquification & storage o Vehicle export (tanker) loading / filling facility * Propane storage facility o 48Tonnes of liquid propane storage o injection to Biomethane export pipeline o injection / purge points biomethane pipework o injection purge points on H2 boiler feed main o Fire suppression system * Dual fuel boiler (H2 and natural gas) o 9000T steam/hr @ 190oC o Boiler feed water conditioning unit o Housing for boiler * H2 import pipeline to dual fuel boilers o 1km x 400mm2 @ 2bar pipeline direct buried (gas main) o H2/natural gas conversion of 2 x 9000T/hr steam boilers o H2 ring main in boiler house * New electrical feed. o 2MVA 6.6kV/415V 3 phase transformer o HV Ring main unit (RMU) o HV joints / infrastructure interventions o New LV intake board (Form 4) 3 tier system / ACB's / distribution o HV / LV earthing Additional information: This notice is a request for information only at this stage. If you have experience in this area please could you provide at a minimum the following information and submit to the United Utilities CTS Procurement Team mailbox: CTSProcurement@uuplc.co.uk * Company Name * Contact details, including location telephone and e-mail address, main point of contact and position in Company
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-h6vhtk-03f69b
- Publication Source
- Find A Tender Service
- Latest Notice
- https://www.find-tender.service.gov.uk/Notice/024928-2023
- Current Stage
- Planning
- All Stages
- Planning
Procurement Classification
- Notice Type
- Planning Notice
- Procurement Type
- Standard
- Procurement Category
- Works
- Procurement Method
- Not Specified
- Procurement Method Details
- Not specified
- Tender Suitability
- Not specified
- Awardee Scale
- Not specified
Common Procurement Vocabulary (CPV)
- CPV Divisions
45 - Construction work
-
- CPV Codes
45222110 - Waste disposal site construction work
45251141 - Geothermal power station construction work
45251220 - Cogeneration plant construction work
45251240 - Landfill-gas electricity generating plant construction work
45252122 - Sewage digesters
45255800 - Gas-production plant construction work
Notice Value(s)
- Tender Value
- £30,000,000 £10M-£100M
- Lots Value
- Not specified
- Awards Value
- Not specified
- Contracts Value
- Not specified
Notice Dates
- Publication Date
- 24 Aug 20232 years ago
- Submission Deadline
- Not specified
- Future Notice Date
- 6 Nov 2023Expired
- Award Date
- Not specified
- Contract Period
- Not specified - Not specified
- Recurrence
- Not specified
Notice Status
- Tender Status
- Planned
- Lots Status
- Planned
- Awards Status
- Not Specified
- Contracts Status
- Not Specified
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- UNITED UTILITIES WATER LIMITED
- Contact Name
- Colette Conroy
- Contact Email
- colette.conroy@uuplc.co.uk
- Contact Phone
- +44 7825849053
Buyer Location
- Locality
- WARRINGTON
- Postcode
- WA5 3LP
- Post Town
- Warrington
- Country
- England
-
- Major Region (ITL 1)
- TLD North West (England)
- Basic Region (ITL 2)
- TLD6 Cheshire
- Small Region (ITL 3)
- TLD61 Warrington
- Delivery Location
- TLD North West (England)
-
- Local Authority
- Warrington
- Electoral Ward
- Great Sankey North and Whittle Hall
- Westminster Constituency
- Warrington South
Further Information
Open Contracting Data Standard (OCDS)
View full OCDS Record for this contracting process
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.
{
"tag": [
"compiled"
],
"id": "ocds-h6vhtk-03f69b-2023-08-24T11:51:24+01:00",
"date": "2023-08-24T11:51:24+01:00",
"ocid": "ocds-h6vhtk-03f69b",
"description": "the response deadline is 22 September 2023",
"initiationType": "tender",
"tender": {
"id": "ocds-h6vhtk-03f69b",
"legalBasis": {
"id": "32014L0025",
"scheme": "CELEX"
},
"title": "PRO004738-Works-Contract- MBC Biomethane and CO2 Plant",
"status": "planned",
"classification": {
"scheme": "CPV",
"id": "45251240",
"description": "Landfill-gas electricity generating plant construction work"
},
"mainProcurementCategory": "works",
"description": "UU (United Utilities Water Limited) UU are proposing to install new Gas to Grid upgrading plant with a Biomethane / CO2 carbon capture (liquified) that takes all the on-site generated gas (~ 6000nm3/hr) from our existing Anaerobic digestion storage for export into the gas network. Developing our future strategy we are undertaking pre-market research to understand market offerings for the following services UU are interested in understanding how this model can be delivered, and the best technical solution Responses detailing variations of the above services are welcome.",
"value": {
"amount": 30000000,
"currency": "GBP"
},
"lots": [
{
"id": "1",
"description": "UU (United Utilities Water Limited) UU are proposing to install new Gas to Grid upgrading plant with a Biomethane / CO2 carbon capture (liquified) that takes all the on-site generated gas (~ 6000nm3/hr) from our existing Anaerobic digestion storage for export into the gas network. UU are interested in understanding how this model can be delivered, and the best technical solution Developing our future strategy we are undertaking pre-market research to understand market offerings for the following services Our initial design for the main plant items include the following Responses detailing variations of the above services are welcome. * Dual stream 'Amine solution' Chemical wash plant o 6000Nm3/hr of biogas treatment for export to local gas network o Pre-treatment conditioning of biogas (VOC / Siloxane / H2S removal) o Analytical monitoring / control of gas quality to ensure product is suitable for export * Grid Export Unit (GEU) - kiosk based solution o Arrangement of valves & pipework for the provision of o Isolation / diversion of the gas between export point & flare stack o Biogas flare stack for emergency burning of surplice gas o Analytical monitoring / control of gas quality to ensure product is suitable for export * Remote Operating Valve (ROV) assembly - kiosk based solution o Arrangement of valves & pipework for the provision of o Valve isolation system to prevent the export gas in the event of quality / gas network issues o Analytical monitoring / control of gas quality to ensure product is suitable for export * CO2 capture / recovery Plant (off- gas product of the Chemical Wash Plant) o Liquification & storage o Vehicle export (tanker) loading / filling facility * Propane storage facility o 48Tonnes of liquid propane storage o injection to Biomethane export pipeline o injection / purge points biomethane pipework o injection purge points on H2 boiler feed main o Fire suppression system * Dual fuel boiler (H2 and natural gas) o 9000T steam/hr @ 190oC o Boiler feed water conditioning unit o Housing for boiler * H2 import pipeline to dual fuel boilers o 1km x 400mm2 @ 2bar pipeline direct buried (gas main) o H2/natural gas conversion of 2 x 9000T/hr steam boilers o H2 ring main in boiler house * New electrical feed. o 2MVA 6.6kV/415V 3 phase transformer o HV Ring main unit (RMU) o HV joints / infrastructure interventions o New LV intake board (Form 4) 3 tier system / ACB's / distribution o HV / LV earthing Additional information: This notice is a request for information only at this stage. If you have experience in this area please could you provide at a minimum the following information and submit to the United Utilities CTS Procurement Team mailbox: CTSProcurement@uuplc.co.uk * Company Name * Contact details, including location telephone and e-mail address, main point of contact and position in Company",
"status": "planned"
}
],
"items": [
{
"id": "1",
"additionalClassifications": [
{
"scheme": "CPV",
"id": "45222110",
"description": "Waste disposal site construction work"
},
{
"scheme": "CPV",
"id": "45251141",
"description": "Geothermal power station construction work"
},
{
"scheme": "CPV",
"id": "45251220",
"description": "Cogeneration plant construction work"
},
{
"scheme": "CPV",
"id": "45252122",
"description": "Sewage digesters"
},
{
"scheme": "CPV",
"id": "45255800",
"description": "Gas-production plant construction work"
}
],
"deliveryAddresses": [
{
"region": "UKD"
}
],
"relatedLot": "1"
}
],
"communication": {
"futureNoticeDate": "2023-11-06T00:00:00Z"
}
},
"parties": [
{
"id": "GB-FTS-4736",
"name": "United Utilities Water Limited",
"identifier": {
"legalName": "United Utilities Water Limited",
"id": "02366678"
},
"address": {
"streetAddress": "Lingley Mere Business Park",
"locality": "Warrington",
"region": "UKD",
"postalCode": "WA5 3LP",
"countryName": "United Kingdom"
},
"contactPoint": {
"name": "Colette Conroy",
"telephone": "+44 7825849053",
"email": "Colette.Conroy@uuplc.co.uk"
},
"roles": [
"buyer"
],
"details": {
"url": "https://www.unitedutilities.com",
"buyerProfile": "https://uk.eu-supply.com/ctm/Company/CompanyInformation/Index/43984",
"classifications": [
{
"scheme": "TED_CE_ACTIVITY",
"id": "WATER",
"description": "Water"
}
]
}
}
],
"buyer": {
"id": "GB-FTS-4736",
"name": "United Utilities Water Limited"
},
"language": "en"
}