TDEP Phase 2 Quayside Development
Notice Description
This project is to extend the already completed Phase 1 section of the quay which is currently been used by the Equinor SOV. The TDEP site is currently the operational and maintenance base for the windfarm with a permanent facility employing up to 150 people. The existing quayside consists of an existing dilapidated jetty and a concrete suspended quay which extends from a quay top level of approximately +6.60m CD (+4.00m OD) down to the riverbed at a depth of about -6m to -7m CD, so a retained height of between 12 to 13.5m. The riverbed in this area consists of soft alluvium and silt overlying alternating layers of strong sandstone, mudstone and siltstone bedrock of the carboniferous coal series which is relatively shallow (-10.00m CD). The existing quay structures along the section are old and is approaching the end of its serviceable life due to sub-aerial corrosion, marine corrosion and accelerated low water corrosion of the steel sheet piles. The proposed wall in this contract continues from the end of Phase 1 section along the remainder of the quay up to near the former graving dock entrance, a distance of 90m. The Phase 1 works is the initial 122m length from the existing wall at the South end of the site. To ensure a straight berthing line for shipping, the 2.6m offset distance will be retained although this does reduce in places due to the variation in the alignment of the existing wall. It is envisaged that the new quay wall will be of a similar construction to that installed in the Phase 1 section, consisting of a steel combi-wall tied back at the top with anchor rods to an anchorage system located in the ground approximately 25m to the rear. A reinforced concrete cope will connect the tops of the piles together to form a continuous hard edge to the quay front. A shorter length of anchor ties will be utilised where the wall will be installed adjacent to existing suspended deck structure. The current dredge depth varies from -6m to -7m CD. The quay is to be designed for a future dredge depth of -10m CD. Due to the high level of the sandstone bedrock, spigots will be required, or the piles will have to be cored through the sandstone to achieve the necessary toe depth to ensure stability when the berth is dredged to the -10m CD depth in the future and to prevent undermining from scour. The quay will be fitted out as part of the works with new bollards, fenders, ladders, grab chains and hand railing as shown on the drawings. Provision will also be made for quay side services (installed by others) and drainage. New concrete surfacing and topping will be installed to the rear to facilitate drainage, some of this will be new ground slabs which will be piled to reduce the loading on the new quay wall from the proposed applied ground surcharge loading of 10tonnes/m2. The existing ground contains a number of relic structures from the previous use of the site including disused jetty, building foundations, bollard foundations, dock closure walls. There is also a suspended slab which is a piled structure located towards the end of the works. The supplementary information provided with the tender documents contains archive drawings of the Phase one works and other historical records relating to the quay side. The tenderer is to consider this information when designing and positioning the new quay, anchorage system and all piles to make due allowance for these old structures. The Equinor SOV currently using the TDEP Phase 1 berth will be visiting the site twice a week and be in berth for 12 to 24 hours. Contractor shall take this into consideration in pricing the job.
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-h6vhtk-040663
- Publication Source
- Find A Tender Service
- Latest Notice
- https://www.find-tender.service.gov.uk/Notice/028689-2023
- Current Stage
- Tender
- All Stages
- Planning, Tender
Procurement Classification
- Notice Type
- Planning Notice
- Procurement Type
- Standard
- Procurement Category
- Works
- Procurement Method
- Selective
- Procurement Method Details
- Restricted procedure
- Tender Suitability
- Not specified
- Awardee Scale
- Not specified
Common Procurement Vocabulary (CPV)
- CPV Divisions
45 - Construction work
-
- CPV Codes
45000000 - Construction work
Notice Value(s)
- Tender Value
- £8,500,000 £1M-£10M
- Lots Value
- £8,500,000 £1M-£10M
- Awards Value
- Not specified
- Contracts Value
- Not specified
Notice Dates
- Publication Date
- 28 Sep 20232 years ago
- Submission Deadline
- 20 Oct 2023Expired
- Future Notice Date
- Not specified
- Award Date
- Not specified
- Contract Period
- 31 Mar 2024 - 1 Apr 2025 1-2 years
- Recurrence
- Not specified
Notice Status
- Tender Status
- Active
- Lots Status
- Active
- Awards Status
- Not Specified
- Contracts Status
- Not Specified
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- PORT OF TYNE PUBLIC LIMITED COMPANY
- Contact Name
- Kevin Emmett
- Contact Email
- kevin.emmett@portoftyne.co.uk
- Contact Phone
- +44 1914552671
Buyer Location
- Locality
- SOUTH SHIELDS
- Postcode
- NE34 9PT
- Post Town
- Newcastle upon Tyne
- Country
- England
-
- Major Region (ITL 1)
- TLC North East (England)
- Basic Region (ITL 2)
- TLC4 Northumberland, Durham and Tyne & Wear
- Small Region (ITL 3)
- TLC43 Tyneside
- Delivery Location
- TLC North East (England)
-
- Local Authority
- South Tyneside
- Electoral Ward
- Simonside and Rekendyke
- Westminster Constituency
- South Shields
Further Information
Open Contracting Data Standard (OCDS)
View full OCDS Record for this contracting process
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.
{
"tag": [
"compiled"
],
"id": "ocds-h6vhtk-040663-2023-09-28T16:45:59+01:00",
"date": "2023-09-28T16:45:59+01:00",
"ocid": "ocds-h6vhtk-040663",
"initiationType": "tender",
"tender": {
"id": "ocds-h6vhtk-040663",
"legalBasis": {
"id": "32014L0025",
"scheme": "CELEX"
},
"title": "TDEP Phase 2 Quayside Development",
"status": "active",
"classification": {
"scheme": "CPV",
"id": "45000000",
"description": "Construction work"
},
"mainProcurementCategory": "works",
"description": "This project is to extend the already completed Phase 1 section of the quay which is currently been used by the Equinor SOV. The TDEP site is currently the operational and maintenance base for the windfarm with a permanent facility employing up to 150 people. The existing quayside consists of an existing dilapidated jetty and a concrete suspended quay which extends from a quay top level of approximately +6.60m CD (+4.00m OD) down to the riverbed at a depth of about -6m to -7m CD, so a retained height of between 12 to 13.5m. The riverbed in this area consists of soft alluvium and silt overlying alternating layers of strong sandstone, mudstone and siltstone bedrock of the carboniferous coal series which is relatively shallow (-10.00m CD). The existing quay structures along the section are old and is approaching the end of its serviceable life due to sub-aerial corrosion, marine corrosion and accelerated low water corrosion of the steel sheet piles. The proposed wall in this contract continues from the end of Phase 1 section along the remainder of the quay up to near the former graving dock entrance, a distance of 90m. The Phase 1 works is the initial 122m length from the existing wall at the South end of the site. To ensure a straight berthing line for shipping, the 2.6m offset distance will be retained although this does reduce in places due to the variation in the alignment of the existing wall. It is envisaged that the new quay wall will be of a similar construction to that installed in the Phase 1 section, consisting of a steel combi-wall tied back at the top with anchor rods to an anchorage system located in the ground approximately 25m to the rear. A reinforced concrete cope will connect the tops of the piles together to form a continuous hard edge to the quay front. A shorter length of anchor ties will be utilised where the wall will be installed adjacent to existing suspended deck structure. The current dredge depth varies from -6m to -7m CD. The quay is to be designed for a future dredge depth of -10m CD. Due to the high level of the sandstone bedrock, spigots will be required, or the piles will have to be cored through the sandstone to achieve the necessary toe depth to ensure stability when the berth is dredged to the -10m CD depth in the future and to prevent undermining from scour. The quay will be fitted out as part of the works with new bollards, fenders, ladders, grab chains and hand railing as shown on the drawings. Provision will also be made for quay side services (installed by others) and drainage. New concrete surfacing and topping will be installed to the rear to facilitate drainage, some of this will be new ground slabs which will be piled to reduce the loading on the new quay wall from the proposed applied ground surcharge loading of 10tonnes/m2. The existing ground contains a number of relic structures from the previous use of the site including disused jetty, building foundations, bollard foundations, dock closure walls. There is also a suspended slab which is a piled structure located towards the end of the works. The supplementary information provided with the tender documents contains archive drawings of the Phase one works and other historical records relating to the quay side. The tenderer is to consider this information when designing and positioning the new quay, anchorage system and all piles to make due allowance for these old structures. The Equinor SOV currently using the TDEP Phase 1 berth will be visiting the site twice a week and be in berth for 12 to 24 hours. Contractor shall take this into consideration in pricing the job.",
"value": {
"amount": 8500000,
"currency": "GBP"
},
"lots": [
{
"id": "1",
"description": "ICC Design & Construct form of tender.",
"awardCriteria": {
"criteria": [
{
"name": "Experience in quay construction in tidal water",
"type": "quality",
"description": "50"
},
{
"name": "Adherence to performance specification",
"type": "cost",
"description": "50"
}
]
},
"value": {
"amount": 8500000,
"currency": "GBP"
},
"contractPeriod": {
"startDate": "2024-04-01T00:00:00+01:00",
"endDate": "2025-04-01T23:59:59+01:00"
},
"status": "active"
}
],
"items": [
{
"id": "1",
"additionalClassifications": [
{
"scheme": "CPV",
"id": "45000000",
"description": "Construction work"
}
],
"deliveryAddresses": [
{
"region": "UKC"
}
],
"deliveryLocation": {
"description": "The proposed works is located on the south bank of the River Tyne within a Port and industrialised environment. Immediately to the East is part of the TDEP site which is a level area of land that has been stoned and is ready for development. North of this over a boundary wall is currently being developed as the Holborn Development. Further to the East of the TDEP site is West Holborn Road and Windmill Hill which is a residential area overlooking the TDEP site (230m to the nearest house) and also commercial properties along Commercial Road and Corstophine Town. To the South is the newly developed Phase 1 quay wall and Equinor O and M facility. Further to the South and Southwest is the Port of Tyne dock estate with its main commercial quay called Riverside Quay extending for about a km. The site is connected to the Port of Tyne dock estate by an unsurfaced access road. To the SE is a Port tenancy called Ford Components which manufactures aerospace components."
},
"relatedLot": "1"
}
],
"participationFees": [
{
"id": "1",
"type": [
"document"
]
}
],
"submissionMethod": [
"written"
],
"submissionMethodDetails": "Mr Kevin Emmett, Merchant House, South Shields, NE34 9PY, United Kingdom. NUTS code: UKC. tenders@portoftyne.co.uk, http://www.portoftyne.co.uk",
"selectionCriteria": {
"criteria": [
{
"type": "suitability",
"description": "Demonstration in ability and experience to undertake quayside construction, including piling works over tidal water. Demonstration in ability to design and construct these works. Demonstration to sufficient financial stability to undertake the works throughout the contract period. Demonstration of sufficient insurances. Providing evidence of meeting high standards of Health and Safety and Environmental requirements.",
"appliesTo": [
"supplier"
]
}
]
},
"documents": [
{
"id": "economic",
"documentType": "economicSelectionCriteria"
},
{
"id": "technical",
"documentType": "technicalSelectionCriteria"
}
],
"contractTerms": {
"performanceTerms": "Infrastructure Conditions of Contract; Design and Construct Version (ICC - August 2011)",
"hasElectronicOrdering": true,
"electronicInvoicingPolicy": "allowed",
"hasElectronicPayment": true
},
"procurementMethod": "selective",
"procurementMethodDetails": "Restricted procedure",
"tenderPeriod": {
"endDate": "2023-10-20T12:00:00+01:00"
},
"submissionTerms": {
"languages": [
"en"
]
}
},
"parties": [
{
"id": "GB-COH-2566501",
"name": "PORT OF TYNE PUBLIC LIMITED COMPANY",
"identifier": {
"legalName": "PORT OF TYNE PUBLIC LIMITED COMPANY",
"id": "2566501",
"scheme": "GB-COH"
},
"address": {
"streetAddress": "Maritime House,Tyne Dock",
"locality": "SOUTH SHIELDS",
"region": "UKC22",
"postalCode": "NE349PT",
"countryName": "United Kingdom"
},
"contactPoint": {
"name": "Kevin Emmett",
"telephone": "+44 1914552671",
"email": "kevin.emmett@portoftyne.co.uk",
"url": "http://www.portoftyneonline.co.uk/downloads/"
},
"roles": [
"buyer"
],
"details": {
"url": "http://www.portoftyne.co.uk",
"classifications": [
{
"scheme": "TED_CE_ACTIVITY",
"id": "PORT_RELATED_ACTIVITIES",
"description": "Port-related activities"
}
]
}
},
{
"id": "GB-FTS-66624",
"name": "Port of Tyne Authority",
"identifier": {
"legalName": "Port of Tyne Authority"
},
"address": {
"streetAddress": "Maritime House",
"locality": "South Shields",
"postalCode": "NE34 9PT",
"countryName": "United Kingdom"
},
"contactPoint": {
"telephone": "+44 1914567122",
"email": "tenders@portoftyne.co.uk"
},
"roles": [
"reviewBody"
]
}
],
"buyer": {
"id": "GB-COH-2566501",
"name": "PORT OF TYNE PUBLIC LIMITED COMPANY"
},
"language": "en"
}