Full Scale Mooring Test Line Rig ORE/23/089
Notice Description
ORE Catapult intends to expand its cable testing capabilities by appointing a single contractor (or consortium) to design and construct Full Scale Mooring Test Line Rig at its National Floating Offshore Wind Innovation Centre (FLOWIC) site in Aberdeen.
Lot Information
Lot 1
This tender is being issued by the Offshore Renewable Energy Catapult ('ORE Catapult') as a competitive procurement exercise in accordance with the 'Competitive Procedure with Negotiation' for tendering under the Public Contracts Regulations 2015 (as amended from time to time). ORE Catapult intends to expand its cable testing capabilities by appointing a single contractor (or consortium) to design and construct Full Scale Mooring Test Line Rig at its National Floating Offshore Wind Innovation Centre (FLOWIC) site in Aberdeen. ORE Catapult reserve the right to vary the Contract term following discussion with suppliers during the Competitive Procedure with Negotiation process. ORE Catapult reserve the right to add additional requirements to the minimum Scope of the Works during the Contract life, as it is deemed appropriate within the Scope of the Works. Phases of the procurement process: Stage 1 -- Selection Questionnaire to a minimum of 3 (three) capable suppliers, where there are less than 3 (three) capable suppliers, all suitably qualified tenderers will be invited to proceed to Stage 2. Stage 2 - Non-Disclosure Agreement (NDA). Preferred Tenderers will enter into a NDA within one (1) week to facilitate full disclosure of all other relevant sensitive and proprietary Operation & Maintenance ("O&M") documentation. Tenderers unable to agree an NDA within this time period may be eliminated from further competition Stage 3 - Issue Invitation to Participate. This stage will include the preliminary design / FEED. ORE Catapult has set aside funding for this stage to allow tenderers to submit preliminary designs, together with cost estimates as part of their Initial ITP Response. Expected outputs from Preliminary Design phase shall be as follows: - Project charter including participants, roles and responsibilities - Methodology and programme for detailed design phase - Outline programme showing key dates and project completion - General arrangement drawings of main components - Outline target cost plan - List of assumptions - Clarifications required and outstanding information needed - Preliminary Risk Register Tenderers shall be required to submit an initial Tender which shall be the basis for any subsequent negotiations. Stage 4 -- Draft ITP submissions - Tenderers shall be required to submit tenders, including preliminary design, in accordance with the details / instructions set out in the ITP. Stage 5 -- Negotiations - ORE Catapult reserve the right to award a Contract on the basis of the initial tender without entering into negotiation where it is in their best interest to do so. ORE Catapult also reserve the right to carry out the Competitive procedures with Negotiation in successive stages in order to reduce the number of tenders to be negotiated. ORE Catapult will inform remaining tenderers of the common deadline to submit new or revised tenders. Stage 6 -- Final Tender submission (Best and Final Offer "BAFO") - ORE Catapult verify best and final tenders to ensure they conform to minimum requirements and evaluate on the basis of the published award criteria in ITP. Stage 7 -- Letter of Intent - Successful Tenderer(s) notified in writing. Unsuccessful Tenderer(s) notified in writing and feedback provided. Ten (10) calendar day mandatory standstill period shall be applied Stage 8 - Contract Award - ORE Catapult to issue formal letter of award, subject to UK Government Funding Approval. NB: The target budget for the build and commissioning of the rig is PS1.5M, this includes a risk / contingency provision
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-h6vhtk-040bca
- Publication Source
- Find A Tender Service
- Latest Notice
- https://www.find-tender.service.gov.uk/Notice/030270-2023
- Current Stage
- Tender
- All Stages
- Tender
Procurement Classification
- Notice Type
- Tender Notice
- Procurement Type
- Standard
- Procurement Category
- Goods
- Procurement Method
- Selective
- Procurement Method Details
- Competitive procedure with negotiation
- Tender Suitability
- Not specified
- Awardee Scale
- Not specified
Common Procurement Vocabulary (CPV)
- CPV Divisions
31 - Electrical machinery, apparatus, equipment and consumables; lighting
42 - Industrial machinery
43 - Machinery for mining, quarrying, construction equipment
-
- CPV Codes
31682210 - Instrumentation and control equipment
42000000 - Industrial machinery
43328000 - Hydraulic installations
Notice Value(s)
- Tender Value
- £1,500,000 £1M-£10M
- Lots Value
- £1,500,000 £1M-£10M
- Awards Value
- Not specified
- Contracts Value
- Not specified
Notice Dates
- Publication Date
- 13 Oct 20232 years ago
- Submission Deadline
- 13 Nov 2023Expired
- Future Notice Date
- Not specified
- Award Date
- Not specified
- Contract Period
- Not specified - Not specified
- Recurrence
- Not specified
Notice Status
- Tender Status
- Active
- Lots Status
- Active
- Awards Status
- Not Specified
- Contracts Status
- Not Specified
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- OFFSHORE RENEWABLE ENERGY CATAPULT
- Contact Name
- Mrs Sian Kerrison
- Contact Email
- procurement@ore.catapult.org.uk
- Contact Phone
- +44 3330041400
Buyer Location
- Locality
- GLASGOW
- Postcode
- G1 1RD
- Post Town
- Glasgow
- Country
- Wales
-
- Major Region (ITL 1)
- TLL Wales
- Basic Region (ITL 2)
- TLL4 Mid and South West Wales
- Small Region (ITL 3)
- TLL42 South West Wales
- Delivery Location
- TLM Scotland, TLM50 Aberdeen City and Aberdeenshire
-
- Local Authority
- Pembrokeshire
- Electoral Ward
- Pembroke Dock: Bush
- Westminster Constituency
- Mid and South Pembrokeshire
Further Information
Open Contracting Data Standard (OCDS)
View full OCDS Record for this contracting process
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.
{
"tag": [
"compiled"
],
"id": "ocds-h6vhtk-040bca-2023-10-13T12:50:55+01:00",
"date": "2023-10-13T12:50:55+01:00",
"ocid": "ocds-h6vhtk-040bca",
"initiationType": "tender",
"tender": {
"id": "DN694250",
"legalBasis": {
"id": "32014L0025",
"scheme": "CELEX"
},
"title": "Full Scale Mooring Test Line Rig ORE/23/089",
"status": "active",
"classification": {
"scheme": "CPV",
"id": "31682210",
"description": "Instrumentation and control equipment"
},
"mainProcurementCategory": "goods",
"description": "ORE Catapult intends to expand its cable testing capabilities by appointing a single contractor (or consortium) to design and construct Full Scale Mooring Test Line Rig at its National Floating Offshore Wind Innovation Centre (FLOWIC) site in Aberdeen.",
"value": {
"amount": 1500000,
"currency": "GBP"
},
"lots": [
{
"id": "1",
"description": "This tender is being issued by the Offshore Renewable Energy Catapult ('ORE Catapult') as a competitive procurement exercise in accordance with the 'Competitive Procedure with Negotiation' for tendering under the Public Contracts Regulations 2015 (as amended from time to time). ORE Catapult intends to expand its cable testing capabilities by appointing a single contractor (or consortium) to design and construct Full Scale Mooring Test Line Rig at its National Floating Offshore Wind Innovation Centre (FLOWIC) site in Aberdeen. ORE Catapult reserve the right to vary the Contract term following discussion with suppliers during the Competitive Procedure with Negotiation process. ORE Catapult reserve the right to add additional requirements to the minimum Scope of the Works during the Contract life, as it is deemed appropriate within the Scope of the Works. Phases of the procurement process: Stage 1 -- Selection Questionnaire to a minimum of 3 (three) capable suppliers, where there are less than 3 (three) capable suppliers, all suitably qualified tenderers will be invited to proceed to Stage 2. Stage 2 - Non-Disclosure Agreement (NDA). Preferred Tenderers will enter into a NDA within one (1) week to facilitate full disclosure of all other relevant sensitive and proprietary Operation & Maintenance (\"O&M\") documentation. Tenderers unable to agree an NDA within this time period may be eliminated from further competition Stage 3 - Issue Invitation to Participate. This stage will include the preliminary design / FEED. ORE Catapult has set aside funding for this stage to allow tenderers to submit preliminary designs, together with cost estimates as part of their Initial ITP Response. Expected outputs from Preliminary Design phase shall be as follows: - Project charter including participants, roles and responsibilities - Methodology and programme for detailed design phase - Outline programme showing key dates and project completion - General arrangement drawings of main components - Outline target cost plan - List of assumptions - Clarifications required and outstanding information needed - Preliminary Risk Register Tenderers shall be required to submit an initial Tender which shall be the basis for any subsequent negotiations. Stage 4 -- Draft ITP submissions - Tenderers shall be required to submit tenders, including preliminary design, in accordance with the details / instructions set out in the ITP. Stage 5 -- Negotiations - ORE Catapult reserve the right to award a Contract on the basis of the initial tender without entering into negotiation where it is in their best interest to do so. ORE Catapult also reserve the right to carry out the Competitive procedures with Negotiation in successive stages in order to reduce the number of tenders to be negotiated. ORE Catapult will inform remaining tenderers of the common deadline to submit new or revised tenders. Stage 6 -- Final Tender submission (Best and Final Offer \"BAFO\") - ORE Catapult verify best and final tenders to ensure they conform to minimum requirements and evaluate on the basis of the published award criteria in ITP. Stage 7 -- Letter of Intent - Successful Tenderer(s) notified in writing. Unsuccessful Tenderer(s) notified in writing and feedback provided. Ten (10) calendar day mandatory standstill period shall be applied Stage 8 - Contract Award - ORE Catapult to issue formal letter of award, subject to UK Government Funding Approval. NB: The target budget for the build and commissioning of the rig is PS1.5M, this includes a risk / contingency provision",
"value": {
"amount": 1500000,
"currency": "GBP"
},
"contractPeriod": {
"endDate": "2025-08-13T23:59:59+01:00"
},
"hasRenewal": false,
"submissionTerms": {
"variantPolicy": "notAllowed"
},
"hasOptions": false,
"status": "active"
}
],
"items": [
{
"id": "1",
"additionalClassifications": [
{
"scheme": "CPV",
"id": "31682210",
"description": "Instrumentation and control equipment"
},
{
"scheme": "CPV",
"id": "42000000",
"description": "Industrial machinery"
},
{
"scheme": "CPV",
"id": "43328000",
"description": "Hydraulic installations"
}
],
"deliveryAddresses": [
{
"region": "UKM"
},
{
"region": "UKM50"
}
],
"relatedLot": "1"
}
],
"submissionMethod": [
"electronicSubmission"
],
"submissionMethodDetails": "https://procontract.due-north.com/Advert/Index?advertId=852b7599-a569-ee11-8124-005056b64545",
"procurementMethod": "selective",
"procurementMethodDetails": "Competitive procedure with negotiation",
"secondStage": {
"noNegotiationNecessary": true
},
"coveredBy": [
"GPA"
],
"tenderPeriod": {
"endDate": "2023-11-13T12:00:00Z"
},
"submissionTerms": {
"languages": [
"en"
]
},
"hasRecurrence": false,
"reviewDetails": "In the first instance, all appeals should be promptly brought to the attention of the contact specified in Section I above, and will be dealt with in accordance with the requirements of the Public Contracts Regulations 2015. Any appeals must be brought within the timescales specified by the applicable law, including without limitation, the Public Contracts Regulations 2015. In accordance with the Public Contracts Regulations 2015, the contracting authority will also incorporate a minimum 10 calendar day standstill period from the date information on award of contract is communicated to tenderers. As the UK does not have any special review body with responsibility for appeal/mediation procedures in public procurement competitions, any challenges will be dealt with by the High Court, Commercial Division, to which proceedings may be issued regarding alleged breaches of the Public Contracts Regulations 2015.",
"amendments": [
{
"id": "1",
"unstructuredChanges": [
{
"oldValue": {
"text": "Value excluding VAT: PS1,500,000"
},
"newValue": {
"text": "Value excluding VAT: PS5,000,000"
},
"where": {
"section": "II.1.5)",
"label": "Estimated value to be changed from PS1.5m to PS5m"
},
"relatedLot": "1"
}
]
}
]
},
"parties": [
{
"id": "GB-FTS-95180",
"name": "Offshore Renewable Energy Catapult",
"identifier": {
"legalName": "Offshore Renewable Energy Catapult"
},
"address": {
"streetAddress": "Inovo, George Street",
"locality": "Glasgow",
"region": "UKM50",
"postalCode": "G11RD",
"countryName": "United Kingdom"
},
"contactPoint": {
"name": "Mrs Sian Kerrison",
"telephone": "+44 3330041400",
"email": "procurement@ore.catapult.org.uk",
"url": "https://procontract.due-north.com/Advert/Index?advertId=852b7599-a569-ee11-8124-005056b64545"
},
"roles": [
"buyer"
],
"details": {
"url": "https://www.ore.catapult.org.uk",
"buyerProfile": "https://www.ore.catapult.org.uk",
"classifications": [
{
"scheme": "TED_CA_TYPE",
"description": "Compliance with grant funding agreement"
},
{
"scheme": "COFOG",
"description": "Research & Development"
}
]
}
},
{
"id": "GB-FTS-88",
"name": "Royal Courts of Justice",
"identifier": {
"legalName": "Royal Courts of Justice"
},
"address": {
"streetAddress": "Strand",
"locality": "London",
"postalCode": "WC2A 2LL",
"countryName": "United Kingdom"
},
"roles": [
"reviewBody",
"mediationBody"
]
},
{
"id": "GB-FTS-58153",
"name": "Offshore Renewable Energy Catapult",
"identifier": {
"legalName": "Offshore Renewable Energy Catapult"
},
"address": {
"streetAddress": "Office 14, Bridge Innovation Centre, Pembrokeshire Science & Technology Park",
"locality": "Pembroke Dock",
"region": "UKM50",
"postalCode": "SA72 6UN",
"countryName": "United Kingdom"
},
"contactPoint": {
"name": "Mrs Sian Kerrison",
"telephone": "+44 3330041400",
"email": "procurement@ore.catapult.org.uk"
},
"roles": [
"buyer"
],
"details": {
"url": "https://www.ore.catapult.org.uk",
"buyerProfile": "https://www.ore.catapult.org.uk"
}
}
],
"buyer": {
"id": "GB-FTS-58153",
"name": "Offshore Renewable Energy Catapult"
},
"language": "en"
}