Tender

UKRI-3443 Battery Energy Storage System for the ASPIRE-II Project

UK RESEARCH & INNOVATION

This public procurement record has 1 release in its history.

Tender

21 Dec 2023 at 16:06

Summary of the contracting process

The UK Research & Innovation is inviting tenders for the procurement of a Battery Energy Storage System for the ASPIRE-II Project. The procurement process is currently in the active planning stage. The contract value is £250,000 GBP, with the tender period ending on 25th January 2024. The contracting authority is located in Swindon, United Kingdom, and the industry category is "Batteries".

This tender opportunity for the Battery Energy Storage System presents an opening for businesses, specifically those involved in renewable energy solutions and manufacturing of battery systems. Small and medium enterprises (SMEs) are encouraged to participate in the procurement process. The submission method is written, with details available on the UK Research & Innovation website. The project aims to demonstrate ammonia production powered by renewable energy sources, fostering innovation and sustainability in the energy sector.

Find more tenders on our Open Data Platform.
How relevant is this notice?

D3 Tenders Premium

Win More Public Sector Contracts

AI-powered tender discovery, pipeline management, and market intelligence — everything you need to grow your public sector business.

Notice Title

UKRI-3443 Battery Energy Storage System for the ASPIRE-II Project

Notice Description

The ASPIRE II project aims to create an Ammonia Synthesis Plant powered solely by renewable energy. It aims to prove the plant's reliability in off-grid settings with varying climates. Featuring four main subsystems and the capability to adjust ammonia production based on available renewable power, the Battery Energy Storage System (BESS) seeks to manage fluctuations between plant consumption and variable renewable energy sources.

Lot Information

Lot 1

The Ammonia Synthesis Plant using Intermittent Renewable Energy 2 (ASPIRE II) project is a demonstration plant which will be built to generate green ammonia using only renewable energy sources. The goal of the project is to prove the system can operate reliably in off grid locations with varying climates. The plant includes four main subsystems, a nitrogen generator, a hydrogen generator, a flexible ammonia synthesis loop and a thermal store. A key requirement of the plant is that the ammonia production rate can be flexed in proportion to the available renewable power. The response rate of the largest load, the electrolyser, is of the order 2 seconds and consumes some 80% of the energy required for the plant. This response rate is key to facilitating tracking of the renewable power however we expect some imbalance between plant power consumption and available renewable power especially when the available renewable power fluctuates rapidly. We envisage the BESS will bridge these imbalances and that the charge status of the BESS will be used as a signal to control the plant generation rate. The demonstrator will be built at the Rutherford Appleton Laboratory in Oxfordshire.

Publication & Lifecycle

Open Contracting ID
ocds-h6vhtk-042951
Publication Source
Find A Tender Service
Latest Notice
https://www.find-tender.service.gov.uk/Notice/037737-2023
Current Stage
Tender
All Stages
Tender

Procurement Classification

Notice Type
Tender Notice
Procurement Type
Standard
Procurement Category
Goods
Procurement Method
Open
Procurement Method Details
Open procedure
Tender Suitability
Not specified
Awardee Scale
Not specified

Common Procurement Vocabulary (CPV)

CPV Divisions

31 - Electrical machinery, apparatus, equipment and consumables; lighting


CPV Codes

31440000 - Batteries

Notice Value(s)

Tender Value
£250,000 £100K-£500K
Lots Value
£250,000 £100K-£500K
Awards Value
Not specified
Contracts Value
Not specified

Notice Dates

Publication Date
21 Dec 20232 years ago
Submission Deadline
25 Jan 2024Expired
Future Notice Date
Not specified
Award Date
Not specified
Contract Period
Not specified - Not specified
Recurrence
Not specified

Notice Status

Tender Status
Active
Lots Status
Active
Awards Status
Not Specified
Contracts Status
Not Specified

Contracting Authority (Buyer)

Main Buyer
UK RESEARCH & INNOVATION
Contact Name
Solomon Nwosu
Contact Email
solomon.nwosu@ukri.org
Contact Phone
+44 7394204018

Buyer Location

Locality
SWINDON
Postcode
SN2 1FL
Post Town
Swindon
Country
England

Major Region (ITL 1)
TLK South West (England)
Basic Region (ITL 2)
TLK7 Gloucestershire and Wiltshire
Small Region (ITL 3)
TLK71 Swindon
Delivery Location
TLJ14 Oxfordshire CC

Local Authority
Swindon
Electoral Ward
Rodbourne Cheney
Westminster Constituency
Swindon North

Open Contracting Data Standard (OCDS)

View full OCDS Record for this contracting process

Download

The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.

{
    "tag": [
        "compiled"
    ],
    "id": "ocds-h6vhtk-042951-2023-12-21T16:06:09Z",
    "date": "2023-12-21T16:06:09Z",
    "ocid": "ocds-h6vhtk-042951",
    "description": "The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement. For more information about this opportunity, please visit the Delta eSourcing portal at: <a href=\"https://ukri.delta-esourcing.com/tenders/UK-UK-Swindon:-Batteries./H857SYYG9Z\" target=\"_blank\">https://ukri.delta-esourcing.com/tenders/UK-UK-Swindon:-Batteries./H857SYYG9Z</a> To respond to this opportunity, please click here: <a href=\"https://ukri.delta-esourcing.com/respond/H857SYYG9Z\" target=\"_blank\">https://ukri.delta-esourcing.com/respond/H857SYYG9Z</a> GO Reference: GO-20231221-PRO-24835747",
    "initiationType": "tender",
    "tender": {
        "id": "UKRI-3443",
        "legalBasis": {
            "id": "32014L0024",
            "scheme": "CELEX"
        },
        "title": "UKRI-3443 Battery Energy Storage System for the ASPIRE-II Project",
        "status": "active",
        "classification": {
            "scheme": "CPV",
            "id": "31440000",
            "description": "Batteries"
        },
        "mainProcurementCategory": "goods",
        "description": "The ASPIRE II project aims to create an Ammonia Synthesis Plant powered solely by renewable energy. It aims to prove the plant's reliability in off-grid settings with varying climates. Featuring four main subsystems and the capability to adjust ammonia production based on available renewable power, the Battery Energy Storage System (BESS) seeks to manage fluctuations between plant consumption and variable renewable energy sources.",
        "value": {
            "amount": 250000,
            "currency": "GBP"
        },
        "lots": [
            {
                "id": "1",
                "description": "The Ammonia Synthesis Plant using Intermittent Renewable Energy 2 (ASPIRE II) project is a demonstration plant which will be built to generate green ammonia using only renewable energy sources. The goal of the project is to prove the system can operate reliably in off grid locations with varying climates. The plant includes four main subsystems, a nitrogen generator, a hydrogen generator, a flexible ammonia synthesis loop and a thermal store. A key requirement of the plant is that the ammonia production rate can be flexed in proportion to the available renewable power. The response rate of the largest load, the electrolyser, is of the order 2 seconds and consumes some 80% of the energy required for the plant. This response rate is key to facilitating tracking of the renewable power however we expect some imbalance between plant power consumption and available renewable power especially when the available renewable power fluctuates rapidly. We envisage the BESS will bridge these imbalances and that the charge status of the BESS will be used as a signal to control the plant generation rate. The demonstrator will be built at the Rutherford Appleton Laboratory in Oxfordshire.",
                "value": {
                    "amount": 250000,
                    "currency": "GBP"
                },
                "contractPeriod": {
                    "durationInDays": 120
                },
                "hasRenewal": false,
                "submissionTerms": {
                    "variantPolicy": "notAllowed"
                },
                "hasOptions": false,
                "status": "active"
            }
        ],
        "items": [
            {
                "id": "1",
                "deliveryAddresses": [
                    {
                        "region": "UKJ14"
                    }
                ],
                "deliveryLocation": {
                    "description": "Oxfordshire"
                },
                "relatedLot": "1"
            }
        ],
        "submissionMethod": [
            "written"
        ],
        "procurementMethod": "open",
        "procurementMethodDetails": "Open procedure",
        "coveredBy": [
            "GPA"
        ],
        "tenderPeriod": {
            "endDate": "2024-01-25T14:00:00Z"
        },
        "submissionTerms": {
            "languages": [
                "en"
            ]
        },
        "awardPeriod": {
            "startDate": "2024-01-25T15:00:00Z"
        },
        "bidOpening": {
            "date": "2024-01-25T15:00:00Z"
        },
        "hasRecurrence": false
    },
    "parties": [
        {
            "id": "GB-FTS-75816",
            "name": "UK Research & Innovation",
            "identifier": {
                "legalName": "UK Research & Innovation"
            },
            "address": {
                "streetAddress": "UK Research & Innovation, Polaris House",
                "locality": "Swindon",
                "region": "UKJ14",
                "postalCode": "SN2 1FL",
                "countryName": "United Kingdom"
            },
            "contactPoint": {
                "name": "Solomon Nwosu",
                "telephone": "+44 7394204018",
                "email": "Solomon.Nwosu@ukri.org",
                "url": "https://ukri.delta-esourcing.com"
            },
            "roles": [
                "buyer",
                "centralPurchasingBody"
            ],
            "details": {
                "url": "http://www.ukri.org",
                "classifications": [
                    {
                        "scheme": "TED_CA_TYPE",
                        "id": "BODY_PUBLIC",
                        "description": "Body governed by public law"
                    },
                    {
                        "scheme": "COFOG",
                        "description": "Research"
                    }
                ]
            }
        },
        {
            "id": "GB-FTS-101350",
            "name": "UK Research and Innovation",
            "identifier": {
                "legalName": "UK Research and Innovation"
            },
            "address": {
                "streetAddress": "UK Research and Innovation Polaris House, North Star Avenue",
                "locality": "Swindon",
                "postalCode": "SN2 1FL",
                "countryName": "United Kingdom"
            },
            "contactPoint": {
                "telephone": "+44 7394204018",
                "email": "Solomon.Nwosu@ukri.org"
            },
            "roles": [
                "reviewBody"
            ],
            "details": {
                "url": "http://www.ukri.org"
            }
        }
    ],
    "buyer": {
        "id": "GB-FTS-75816",
        "name": "UK Research & Innovation"
    },
    "language": "en"
}