Notice Information
Notice Title
Regeneration of land around and at Hind Street, Birkenhead, Wirral
Notice Description
Wirral Borough Council (the "Council") intends to enter into a Master Development Agreement with Ion Property Developments Limited ("Ion") for the development of closely connected land (including land owned separately by the Council and Ion). The development will see the comprehensive regeneration of a substantial brownfield site with the intention to bring a minimum of 1,400 new homes to Birkenhead, supporting Wirral Council's 2021-2037 draft Local Plan. The phased development will create a new vibrant neighbourhood that will directly connect to and support the resurgence of the town centre. The Gross Development Value (GDV) for the project is estimated to be in the region of PS550,000,000 to PS575,000,000.
Lot Information
Lot 1
The Master Development Agreement enables the Council and Ion to enter into Phase Development Agreements on satisfaction of conditions. The location of the site is land south and north Of Hind Street/ Blackpool Street, Waterloo Place, Birkenhead, Wirral and has a site area of 26.27ha. The site is made up of various parcels of land including land owned by both the Council and Ion, and the individual land parcels are intrinsically linked. Of particular note, as part of the regeneration of the site there is a requirement to demolish a flyover which straddles land that is owned by the Council and land that is owned by Ion. The Gross Development Value (GDV) for the project is estimated to be in the region of PS550,000,000 to PS575,000,000. The proposed development includes temporary compounds and access routes required to facilitate the works. The site is to be developed with a residential led masterplan, based on the principles of sustainable urban design. A minimum of 1,400 residential units will be constructed with supporting and ancillary commercial, business and service uses (Use Class E), Local Community and Learning uses (Use Class F), and Hotel (Use Class C1). The development is proposed to be split across five phases and primarily include demolition of the existing buildings and structures and construction of residential houses and apartments as well as ancillary uses. Enabling works are proposed to take place from Autumn 2025 with the first construction of new homes anticipated to commence in 2027. Ion will apply to the Secretary of State for Transport for a stopping up order under section 247 of the Town and Country Planning Act 1990, which permits an order to be made for the stopping up/ diversion of a highway necessary to enable development to be carried out in accordance with a planning permission. Further information regarding the development can be obtained online ( https://www.wirral.gov.uk/planning-and-building/planning-permission/search-planning-applications - planning reference OUT/23/01259).
Procurement Information
The works can only be provided by a particular economic operator due to the protection of exclusive rights in accordance with regulation 32(2)(b) of the Public Contracts Regulations 2015. The site is made up of various parcels of land including land owned by both the Council and Ion, and the individual land parcels are intrinsically linked. Of particular note, as part of the regeneration of the site there is a requirement to demolish a flyover which straddles land that is owned by the Council and land that is owned by Ion. Given the proximity of the various land parcels, coupled with the requirement for demolition works to be provided to the flyover on land controlled by Ion, the Council considers that Ion is the only developer able to deliver the regeneration works on the basis of Ion's existing exclusive rights over key areas of land within the overall regeneration site. In light of the above, and on the basis that key parts of the land that form the overall development site are owned (or optioned) by Ion, the Council has concluded there are no reasonable alternative or substitute developers who would be able to develop the site (given that much of the site is already owned by Ion) and for the reasons set out in this VTN, Ion is the only economic operator capable of providing the works on the basis of Ion's exclusive rights over parts of the site, including key parts of the site that are connected by the existing flyover.
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-h6vhtk-04d4c0
- Publication Source
- Find A Tender Service
- Latest Notice
- https://www.find-tender.service.gov.uk/Notice/001920-2025
- Current Stage
- Award
- All Stages
- Tender, Award
Procurement Classification
- Notice Type
- Tender Notice
- Procurement Type
- Standard
- Procurement Category
- Works
- Procurement Method
- Limited
- Procurement Method Details
- Negotiated without publication of a contract notice
- Tender Suitability
- Not specified
- Awardee Scale
- SME
Common Procurement Vocabulary (CPV)
- CPV Divisions
45 - Construction work
70 - Real estate services
-
- CPV Codes
45000000 - Construction work
45111000 - Demolition, site preparation and clearance work
45211000 - Construction work for multi-dwelling buildings and individual houses
45213000 - Construction work for commercial buildings, warehouses and industrial buildings, buildings relating to transport
45300000 - Building installation work
45400000 - Building completion work
70000000 - Real estate services
Notice Value(s)
- Tender Value
- Not specified
- Lots Value
- Not specified
- Awards Value
- Not specified
- Contracts Value
- £575,000,000 £100M-£1B
Notice Dates
- Publication Date
- 20 Jan 20251 years ago
- Submission Deadline
- Not specified
- Future Notice Date
- Not specified
- Award Date
- 20 Jan 20251 years ago
- Contract Period
- Not specified - Not specified
- Recurrence
- Not specified
Notice Status
- Tender Status
- Complete
- Lots Status
- Not Specified
- Awards Status
- Active
- Contracts Status
- Active
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- WIRRAL METROPOLITAN BOROUGH COUNCIL
- Contact Name
- Not specified
- Contact Email
- thomasbooty@wirral.gov.uk
- Contact Phone
- Not specified
Buyer Location
- Locality
- WIRRAL
- Postcode
- N/A
- Post Town
- Not specified
- Country
- Not specified
-
- Major Region (ITL 1)
- Not specified
- Basic Region (ITL 2)
- Not specified
- Small Region (ITL 3)
- Not specified
- Delivery Location
- TLD74 Wirral
-
- Local Authority
- Not specified
- Electoral Ward
- Not specified
- Westminster Constituency
- Not specified
Further Information
Open Contracting Data Standard (OCDS)
View full OCDS Record for this contracting process
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.
{
"tag": [
"compiled"
],
"id": "ocds-h6vhtk-04d4c0-2025-01-20T16:05:25Z",
"date": "2025-01-20T16:05:25Z",
"ocid": "ocds-h6vhtk-04d4c0",
"initiationType": "tender",
"tender": {
"id": "ocds-h6vhtk-04d4c0",
"legalBasis": {
"id": "32014L0024",
"scheme": "CELEX"
},
"title": "Regeneration of land around and at Hind Street, Birkenhead, Wirral",
"status": "complete",
"classification": {
"scheme": "CPV",
"id": "45000000",
"description": "Construction work"
},
"mainProcurementCategory": "works",
"description": "Wirral Borough Council (the \"Council\") intends to enter into a Master Development Agreement with Ion Property Developments Limited (\"Ion\") for the development of closely connected land (including land owned separately by the Council and Ion). The development will see the comprehensive regeneration of a substantial brownfield site with the intention to bring a minimum of 1,400 new homes to Birkenhead, supporting Wirral Council's 2021-2037 draft Local Plan. The phased development will create a new vibrant neighbourhood that will directly connect to and support the resurgence of the town centre. The Gross Development Value (GDV) for the project is estimated to be in the region of PS550,000,000 to PS575,000,000.",
"lots": [
{
"id": "1",
"description": "The Master Development Agreement enables the Council and Ion to enter into Phase Development Agreements on satisfaction of conditions. The location of the site is land south and north Of Hind Street/ Blackpool Street, Waterloo Place, Birkenhead, Wirral and has a site area of 26.27ha. The site is made up of various parcels of land including land owned by both the Council and Ion, and the individual land parcels are intrinsically linked. Of particular note, as part of the regeneration of the site there is a requirement to demolish a flyover which straddles land that is owned by the Council and land that is owned by Ion. The Gross Development Value (GDV) for the project is estimated to be in the region of PS550,000,000 to PS575,000,000. The proposed development includes temporary compounds and access routes required to facilitate the works. The site is to be developed with a residential led masterplan, based on the principles of sustainable urban design. A minimum of 1,400 residential units will be constructed with supporting and ancillary commercial, business and service uses (Use Class E), Local Community and Learning uses (Use Class F), and Hotel (Use Class C1). The development is proposed to be split across five phases and primarily include demolition of the existing buildings and structures and construction of residential houses and apartments as well as ancillary uses. Enabling works are proposed to take place from Autumn 2025 with the first construction of new homes anticipated to commence in 2027. Ion will apply to the Secretary of State for Transport for a stopping up order under section 247 of the Town and Country Planning Act 1990, which permits an order to be made for the stopping up/ diversion of a highway necessary to enable development to be carried out in accordance with a planning permission. Further information regarding the development can be obtained online ( https://www.wirral.gov.uk/planning-and-building/planning-permission/search-planning-applications - planning reference OUT/23/01259).",
"hasOptions": false
}
],
"items": [
{
"id": "1",
"additionalClassifications": [
{
"scheme": "CPV",
"id": "45111000",
"description": "Demolition, site preparation and clearance work"
},
{
"scheme": "CPV",
"id": "45211000",
"description": "Construction work for multi-dwelling buildings and individual houses"
},
{
"scheme": "CPV",
"id": "45213000",
"description": "Construction work for commercial buildings, warehouses and industrial buildings, buildings relating to transport"
},
{
"scheme": "CPV",
"id": "45300000",
"description": "Building installation work"
},
{
"scheme": "CPV",
"id": "45400000",
"description": "Building completion work"
},
{
"scheme": "CPV",
"id": "70000000",
"description": "Real estate services"
}
],
"deliveryAddresses": [
{
"region": "UKD74"
}
],
"relatedLot": "1"
}
],
"procurementMethod": "limited",
"procurementMethodDetails": "Negotiated without publication of a contract notice",
"coveredBy": [
"GPA"
],
"reviewDetails": "Wirral Borough Council will observe a standstill period following the publication of this Voluntary Ex Ante Transparency Notice (VTN) of a minimum of 10 calendar days prior to entering into the Contract.",
"procurementMethodRationaleClassifications": [
{
"scheme": "TED_PT_AWARD_CONTRACT_WITHOUT_CALL",
"id": "D_PROTECT_RIGHTS",
"description": "The works, supplies or services can be provided only by a particular economic operator due to protection of exclusive rights, including intellectual property rights"
}
],
"procurementMethodRationale": "The works can only be provided by a particular economic operator due to the protection of exclusive rights in accordance with regulation 32(2)(b) of the Public Contracts Regulations 2015. The site is made up of various parcels of land including land owned by both the Council and Ion, and the individual land parcels are intrinsically linked. Of particular note, as part of the regeneration of the site there is a requirement to demolish a flyover which straddles land that is owned by the Council and land that is owned by Ion. Given the proximity of the various land parcels, coupled with the requirement for demolition works to be provided to the flyover on land controlled by Ion, the Council considers that Ion is the only developer able to deliver the regeneration works on the basis of Ion's existing exclusive rights over key areas of land within the overall regeneration site. In light of the above, and on the basis that key parts of the land that form the overall development site are owned (or optioned) by Ion, the Council has concluded there are no reasonable alternative or substitute developers who would be able to develop the site (given that much of the site is already owned by Ion) and for the reasons set out in this VTN, Ion is the only economic operator capable of providing the works on the basis of Ion's exclusive rights over parts of the site, including key parts of the site that are connected by the existing flyover.",
"amendments": [
{
"id": "1",
"unstructuredChanges": [
{
"oldValue": {
"text": "No"
},
"newValue": {
"text": "The Master Development Agreement is a 15 year agreement with the option of 10 year extension."
},
"where": {
"section": "II.2.11",
"label": "Information about options"
}
}
]
}
]
},
"awards": [
{
"id": "001909-2025-1",
"relatedLots": [
"1"
],
"status": "active",
"suppliers": [
{
"id": "GB-COH-03498080",
"name": "Ion Property Developments Limited"
}
]
}
],
"parties": [
{
"id": "GB-FTS-135547",
"name": "Wirral Metropolitan Borough Council",
"identifier": {
"legalName": "Wirral Metropolitan Borough Council",
"noIdentifierRationale": "notOnAnyRegister"
},
"address": {
"locality": "Wirral",
"region": "UKD74",
"countryName": "United Kingdom"
},
"contactPoint": {
"email": "thomasbooty@wirral.gov.uk"
},
"roles": [
"buyer"
],
"details": {
"url": "https://www.wirral.gov.uk/",
"classifications": [
{
"scheme": "TED_CA_TYPE",
"id": "REGIONAL_AUTHORITY",
"description": "Regional or local authority"
},
{
"scheme": "COFOG",
"id": "01",
"description": "General public services"
}
]
}
},
{
"id": "GB-COH-03498080",
"name": "Ion Property Developments Limited",
"identifier": {
"legalName": "Ion Property Developments Limited",
"id": "03498080",
"scheme": "GB-COH"
},
"address": {
"locality": "Liverpool",
"region": "UKD72",
"countryName": "United Kingdom"
},
"roles": [
"supplier"
],
"details": {
"scale": "sme"
}
},
{
"id": "GB-FTS-136",
"name": "High Court of England and Wales",
"identifier": {
"legalName": "High Court of England and Wales"
},
"address": {
"locality": "London",
"countryName": "United Kingdom"
},
"roles": [
"reviewBody",
"mediationBody"
]
},
{
"id": "GB-FTS-569",
"name": "Cabinet Office",
"identifier": {
"legalName": "Cabinet Office"
},
"address": {
"locality": "London",
"countryName": "United Kingdom"
},
"roles": [
"reviewContactPoint"
]
}
],
"buyer": {
"id": "GB-FTS-135547",
"name": "Wirral Metropolitan Borough Council"
},
"contracts": [
{
"id": "001909-2025-1",
"awardID": "001909-2025-1",
"status": "active",
"value": {
"amount": 575000000,
"currency": "GBP"
},
"dateSigned": "2025-01-20T00:00:00Z"
}
],
"language": "en"
}