TenderUpdate
T322 NIEN Transmission Substation Turnkey (Amended)
NORTHERN IRELAND ELECTRICITY NETWORKS
-
Contract Timeline
- Publication Date
-
18th April 2025 13:58:02 PM
-
Contract Summary
It is proposed to establish a Multi-Party Framework which will consist of two lots, • Lot 1 will consist of larger scale substations with a range between 110 – 400kV and an estimated cost range between £20 to £100m. • Lot 2 will consist of medium scale substations with a range between 33 – 275kV and an estimated cost range between £1 - £20m • The scope of works to be procured will include predominantly substation works including turnkey electrical, mechanical, civils and enabling works, with the inclusion of local overhead lines and cables within the curtilage of the site. • NIEN wish to retain the flexibility for each lot to utilise both Design and Build (D&B) and Engineering Procurement and Construction (EPC) models. • The default approach will be that equipment supply (transformers and switchgear etc.) will be in the scope of projects. Free issue of equipment will be limited to those projects for which NIEN have equipment ordered.
-
Contract Details
- Open Contracting ID
-
ocds-h6vhtk-04fdbe
- Publication Source
-
Find a Tender Service
- Procurement Stage
-
TenderUpdate
- Procurement Method
-
Selective
- Procurement Method Details
-
Competitive Flexible Procedure
- Procurement Category
-
Works
- Tender Suitability
-
- Framework / DPS
-
Framework
-
Contract Classification
- CPV Code(s)
- CPV Division(s)
-
Awarding Authority
NORTHERN IRELAND ELECTRICITY NETWORKS
- Buyer Name
-
Paul Martin
- Buyer Email
-
paul.martin@nienetworks.co.uk
- Buyer Phone
- Buyer Address
-
120 Malone Road
Belfast
BT9 5HT
United Kingdom