T322 NIEN Transmission Substation Turnkey (Amended)

NORTHERN IRELAND ELECTRICITY NETWORKS

  • Contract Timeline

    Publication Date

    18th April 2025 13:58:02 PM

  • Contract Summary

    It is proposed to establish a Multi-Party Framework which will consist of two lots, • Lot 1 will consist of larger scale substations with a range between 110 – 400kV and an estimated cost range between £20 to £100m. • Lot 2 will consist of medium scale substations with a range between 33 – 275kV and an estimated cost range between £1 - £20m • The scope of works to be procured will include predominantly substation works including turnkey electrical, mechanical, civils and enabling works, with the inclusion of local overhead lines and cables within the curtilage of the site. • NIEN wish to retain the flexibility for each lot to utilise both Design and Build (D&B) and Engineering Procurement and Construction (EPC) models. • The default approach will be that equipment supply (transformers and switchgear etc.) will be in the scope of projects. Free issue of equipment will be limited to those projects for which NIEN have equipment ordered.

  • Contract Details

    Open Contracting ID

    ocds-h6vhtk-04fdbe

    Publication Source

    Find a Tender Service

    Procurement Stage

    TenderUpdate

    Procurement Method

    Selective

    Procurement Method Details

    Competitive Flexible Procedure

    Procurement Category

    Works

    Tender Suitability

    Framework / DPS

    Framework

  • Contract Classification

    CPV Code(s)

    CPV Division(s)

  • Awarding Authority

    NORTHERN IRELAND ELECTRICITY NETWORKS

    Buyer Name

    Paul Martin

    Buyer Email

    paul.martin@nienetworks.co.uk

    Buyer Phone

    Buyer Address

    120 Malone Road

    Belfast

    BT9 5HT

    United Kingdom


TenderUpdate

T322 NIEN Transmission Substation Turnkey (Amended)

NORTHERN IRELAND ELECTRICITY NETWORKS

  • Contract Timeline

    Publication Date

    18th April 2025 13:38:35 PM

  • Contract Summary

    It is proposed to establish a Multi-Party Framework which will consist of two lots, • Lot 1 will consist of larger scale substations with a range between 110 – 400kV and an estimated cost range between £20 to £100m. • Lot 2 will consist of medium scale substations with a range between 33 – 275kV and an estimated cost range between £1 - £20m • The scope of works to be procured will include predominantly substation works including turnkey electrical, mechanical, civils and enabling works, with the inclusion of local overhead lines and cables within the curtilage of the site. • NIEN wish to retain the flexibility for each lot to utilise both Design and Build (D&B) and Engineering Procurement and Construction (EPC) models. • The default approach will be that equipment supply (transformers and switchgear etc.) will be in the scope of projects. Free issue of equipment will be limited to those projects for which NIEN have equipment ordered.

  • Contract Details

    Open Contracting ID

    ocds-h6vhtk-04fdbe

    Publication Source

    Find a Tender Service

    Procurement Stage

    TenderUpdate

    Procurement Method

    Selective

    Procurement Method Details

    Competitive Flexible Procedure

    Procurement Category

    Works

    Tender Suitability

    Framework / DPS

    Framework

  • Contract Classification

    CPV Code(s)

    CPV Division(s)

  • Awarding Authority

    NORTHERN IRELAND ELECTRICITY NETWORKS

    Buyer Name

    Paul Martin

    Buyer Email

    paul.martin@nienetworks.co.uk

    Buyer Phone

    Buyer Address

    120 Malone Road

    Belfast

    BT9 5HT

    United Kingdom


Tender

T322 NIEN Transmission Substation Turnkey

NORTHERN IRELAND ELECTRICITY NETWORKS

  • Contract Timeline

    Publication Date

    6th April 2025 19:50:57 PM

  • Contract Summary

    It is proposed that the Multi-Party Framework will consist of two lots, • Lot 1 will consist of larger scale substations with a range between 110 – 400kV and an estimated cost range between £20 to £100m. • Lot 2 will consist of medium scale substations with a range between 33 – 275kV and an estimated cost range between £2 - £20m • The scope of works to be procured will include predominantly substation works including turnkey electrical, mechanical, civils and enabling works, with the inclusion of local overhead lines and cables within the curtilage of the site. • NIEN wish to retain the flexibility for each lot to utilise both Design and Build (D&B) and Engineering Procurement and Construction (EPC) models. • The default approach will be that equipment supply (transformers and switchgear etc.) will be in the scope of projects. Free issue of equipment will be limited to those projects for which NIEN have equipment ordered.

  • Contract Details

    Open Contracting ID

    ocds-h6vhtk-04fdbe

    Publication Source

    Find a Tender Service

    Procurement Stage

    Tender

    Procurement Method

    Selective

    Procurement Method Details

    Competitive Flexible Procedure

    Procurement Category

    Works

    Tender Suitability

    Framework / DPS

    Framework

  • Contract Classification

    CPV Code(s)

    CPV Division(s)

  • Awarding Authority

    NORTHERN IRELAND ELECTRICITY NETWORKS

    Buyer Name

    Paul Martin

    Buyer Email

    paul.martin@nienetworks.co.uk

    Buyer Phone

    Buyer Address

    120 Malone Road

    Belfast

    BT9 5HT

    United Kingdom