Notice Information
Notice Title
Port of Dover Ferry Charging
Notice Description
The Port of Dover are seeking expressions of interest from strategic funding partners to work with us on an exciting new project to develop and enable the Port to facilitate green straights between Dover, Calais and Dunkirk, which will allow the port to offer ferry shore power charging. The port system generates approximately 1.1 million tonnes of CO2 annually (which is equivalent to 8% of UK maritime emissions as a whole), shipping being the largest contributor representing 75% of those emissions, the electrification of these ferries will drastically reduce these carbon and air quality emissions. The electrification of the ferries would mean that this vital trade route would also become a high-volume Green Corridor which would directly support DfT's Maritime Decarbonisation Strategy, COP26 and the Clydebank Declaration objectives progressing the nation's move to Net Zero 2050. This work would demonstrate a large-scale, real-world application for net zero shipping corridors, opening the door for similar investments and innovations across both the UK and the world, cementing the UK's position as a leader in maritime decarbonisation. Whilst the works will be for the Port of Dover there is a requirement for strategic alignment with both the Port Boulogne Calais and the Port of Dunkerque. There are currently three ferry companies operating from the Port of Dover of which DFDS have made a public commitment to electrify their channel fleet by 2035, starting with 2 fully electric ferries joining the route as early as 2030. Due to the complexity, scale and capital requirements of these power demands the Port of Dover sees significant benefits in developing a strategic partnership approach. This approach would be a partnership with the Ferry operators and an appropriate 3rd party provider to deliver this step change in power for shore side ferry charging under a long-term power purchase agreement with appropriate commercial terms between parties. The intent is that the strategic funding partner will develop the following; - A new internal High Voltage (HV) network within the Port, dedicated to ferry charging, to facilitate an estimated 160MW inline with the requirements of the Ferry Operators (with on-site BESS and/or harmonisation of the ferry schedule this could reduce). - The necessary transformers, switch gear, on site BESS and cable infrastructure to allow the port to manage the power demand profile and locate power on multiple berths at the port. - Partner with a suitable supplier of the "plug" solution to allow the vessels to re-charge or connect to shore power when in berth, including power conversion equipment. Expressions of interest must be via our In-Tend Procurement Platform - available for enrolment here: https://in-tendhost.co.uk/portofdover/aspx/Home
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-h6vhtk-0569db
- Publication Source
- Find A Tender Service
- Latest Notice
- https://www.find-tender.service.gov.uk/Notice/044622-2025
- Current Stage
- Planning
- All Stages
- Planning
Procurement Classification
- Notice Type
- UK3 - Planned Procurement Notice
- Procurement Type
- Standard
- Procurement Category
- Works
- Procurement Method
- Selective
- Procurement Method Details
- Competitive flexible procedure
- Tender Suitability
- Not specified
- Awardee Scale
- Not specified
Common Procurement Vocabulary (CPV)
- CPV Divisions
31 - Electrical machinery, apparatus, equipment and consumables; lighting
45 - Construction work
-
- CPV Codes
31321300 - High-voltage cable
45232220 - Substation construction work
45310000 - Electrical installation work
45315100 - Electrical engineering installation works
45315300 - Electricity supply installations
45315400 - High voltage installation work
45317300 - Electrical installation work of electrical distribution apparatus
Notice Value(s)
- Tender Value
- Not specified
- Lots Value
- Not specified
- Awards Value
- Not specified
- Contracts Value
- Not specified
Notice Dates
- Publication Date
- 31 Jul 20256 months ago
- Submission Deadline
- Not specified
- Future Notice Date
- 18 Sep 2025Expired
- Award Date
- Not specified
- Contract Period
- 7 Jun 2026 - 1 Jan 2035 Over 5 years
- Recurrence
- Not specified
Notice Status
- Tender Status
- Planned
- Lots Status
- Planned
- Awards Status
- Not Specified
- Contracts Status
- Not Specified
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- DOVER HARBOUR BOARD
- Contact Name
- Not specified
- Contact Email
- supplier.support@portofdover.com
- Contact Phone
- Not specified
Buyer Location
- Locality
- DOVER
- Postcode
- CT17 9BU
- Post Town
- Canterbury
- Country
- England
-
- Major Region (ITL 1)
- TLJ South East (England)
- Basic Region (ITL 2)
- TLJ4 Kent
- Small Region (ITL 3)
- TLJ44 East Kent
- Delivery Location
- Not specified
-
- Local Authority
- Dover
- Electoral Ward
- Town & Castle
- Westminster Constituency
- Dover and Deal
Further Information
Notice Documents
-
https://www.find-tender.service.gov.uk/Notice/044622-2025
31st July 2025 - Planned procurement notice on Find a Tender -
https://www.find-tender.service.gov.uk/Notice/044617-2025
31st July 2025 - Planned procurement notice on Find a Tender
Open Contracting Data Standard (OCDS)
View full OCDS Record for this contracting process
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.
{
"tag": [
"compiled"
],
"id": "ocds-h6vhtk-0569db-2025-07-31T10:42:31+01:00",
"date": "2025-07-31T10:42:31+01:00",
"ocid": "ocds-h6vhtk-0569db",
"initiationType": "tender",
"planning": {
"documents": [
{
"id": "044617-2025",
"documentType": "plannedProcurementNotice",
"noticeType": "UK3",
"description": "Planned procurement notice on Find a Tender",
"url": "https://www.find-tender.service.gov.uk/Notice/044617-2025",
"datePublished": "2025-07-31T10:35:17+01:00",
"format": "text/html"
},
{
"id": "044622-2025",
"documentType": "plannedProcurementNotice",
"noticeType": "UK3",
"description": "Planned procurement notice on Find a Tender",
"url": "https://www.find-tender.service.gov.uk/Notice/044622-2025",
"datePublished": "2025-07-31T10:42:31+01:00",
"format": "text/html"
}
]
},
"parties": [
{
"id": "GB-PPON-PBWQ-3165-XGNL",
"name": "Dover Harbour Board",
"identifier": {
"scheme": "GB-PPON",
"id": "PBWQ-3165-XGNL"
},
"address": {
"streetAddress": "Harbour House, Marine Parade",
"locality": "Dover",
"postalCode": "CT17 9BU",
"country": "GB",
"countryName": "United Kingdom",
"region": "UKJ44"
},
"contactPoint": {
"email": "supplier.support@portofdover.com"
},
"roles": [
"buyer"
],
"details": {
"classifications": [
{
"scheme": "UK_CA_TYPE",
"id": "privateUtility",
"description": "Private utility"
}
]
}
}
],
"buyer": {
"id": "GB-PPON-PBWQ-3165-XGNL",
"name": "Dover Harbour Board"
},
"tender": {
"id": "ocds-h6vhtk-0569db",
"legalBasis": {
"id": "2023/54",
"scheme": "UKPGA",
"uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents"
},
"title": "Port of Dover Ferry Charging",
"description": "The Port of Dover are seeking expressions of interest from strategic funding partners to work with us on an exciting new project to develop and enable the Port to facilitate green straights between Dover, Calais and Dunkirk, which will allow the port to offer ferry shore power charging. The port system generates approximately 1.1 million tonnes of CO2 annually (which is equivalent to 8% of UK maritime emissions as a whole), shipping being the largest contributor representing 75% of those emissions, the electrification of these ferries will drastically reduce these carbon and air quality emissions. The electrification of the ferries would mean that this vital trade route would also become a high-volume Green Corridor which would directly support DfT's Maritime Decarbonisation Strategy, COP26 and the Clydebank Declaration objectives progressing the nation's move to Net Zero 2050. This work would demonstrate a large-scale, real-world application for net zero shipping corridors, opening the door for similar investments and innovations across both the UK and the world, cementing the UK's position as a leader in maritime decarbonisation. Whilst the works will be for the Port of Dover there is a requirement for strategic alignment with both the Port Boulogne Calais and the Port of Dunkerque. There are currently three ferry companies operating from the Port of Dover of which DFDS have made a public commitment to electrify their channel fleet by 2035, starting with 2 fully electric ferries joining the route as early as 2030. Due to the complexity, scale and capital requirements of these power demands the Port of Dover sees significant benefits in developing a strategic partnership approach. This approach would be a partnership with the Ferry operators and an appropriate 3rd party provider to deliver this step change in power for shore side ferry charging under a long-term power purchase agreement with appropriate commercial terms between parties. The intent is that the strategic funding partner will develop the following; - A new internal High Voltage (HV) network within the Port, dedicated to ferry charging, to facilitate an estimated 160MW inline with the requirements of the Ferry Operators (with on-site BESS and/or harmonisation of the ferry schedule this could reduce). - The necessary transformers, switch gear, on site BESS and cable infrastructure to allow the port to manage the power demand profile and locate power on multiple berths at the port. - Partner with a suitable supplier of the \"plug\" solution to allow the vessels to re-charge or connect to shore power when in berth, including power conversion equipment. Expressions of interest must be via our In-Tend Procurement Platform - available for enrolment here: https://in-tendhost.co.uk/portofdover/aspx/Home",
"status": "planned",
"items": [
{
"id": "1",
"additionalClassifications": [
{
"scheme": "CPV",
"id": "45315400",
"description": "High voltage installation work"
},
{
"scheme": "CPV",
"id": "31321300",
"description": "High-voltage cable"
},
{
"scheme": "CPV",
"id": "45310000",
"description": "Electrical installation work"
},
{
"scheme": "CPV",
"id": "45315300",
"description": "Electricity supply installations"
},
{
"scheme": "CPV",
"id": "45315100",
"description": "Electrical engineering installation works"
},
{
"scheme": "CPV",
"id": "45317300",
"description": "Electrical installation work of electrical distribution apparatus"
},
{
"scheme": "CPV",
"id": "45232220",
"description": "Substation construction work"
}
],
"relatedLot": "1"
}
],
"value": {
"amountGross": 0,
"currency": "GBP"
},
"procurementMethod": "selective",
"procurementMethodDetails": "Competitive flexible procedure",
"mainProcurementCategory": "works",
"aboveThreshold": true,
"submissionMethodDetails": "https://in-tendhost.co.uk/portofdover/aspx/Home",
"submissionTerms": {
"electronicSubmissionPolicy": "notAllowed",
"languages": [
"en"
]
},
"expressionOfInterestDeadline": "2025-09-30T23:59:59+01:00",
"awardPeriod": {
"endDate": "2026-04-01T23:59:59+01:00"
},
"lots": [
{
"id": "1",
"status": "planned",
"value": {
"amountGross": 0,
"currency": "AED"
},
"contractPeriod": {
"startDate": "2026-06-08T00:00:00+01:00",
"endDate": "2035-01-01T23:59:59+00:00"
}
}
],
"communication": {
"futureNoticeDate": "2025-09-18T23:59:59+01:00"
}
},
"language": "en"
}