Notice Information
Notice Title
Supply, installation, leasing, scheduled pre-planned and reactive maintenance for mains water chillers / coolers, bottled water chillers / coolers and instant hot water boiler
Notice Description
Suppliers will be required to provide the following services in a cost-effective structure: General Requirements * The Contractor shall supply, install, and maintain all specified equipment at RBFRS locations. * Provision for leasing options, enabling RBFRS to forecast costs, maintain budget compliance, and upgrade or alter equipment in line with operational requirements. * All equipment shall operate from a standard 13-amp power supply, with electrical connections located within 1 metre, and water/drainage connections within 15 metres of installation points. * The Contractor shall provide a fixed monthly price for all services and assets supplied under this contract Equipment Specifications and Requirements * Supply and install free-standing, mains-fed machines at designated locations. * Appearance and functionality must be suitable for high-traffic areas (station/office). * Provision of PAT test certificates and installation records for all machines. * State the energy efficiency rating of the proposed units. * Total care package to include descaling and filter replacement at intervals suitable for hardwater areas. Service intervals to be specified in the Service Level Agreement (SLA). Bottled Water Chillers * Supply bottled water chillers at up to 34 designated sites, as per inventory. * Deliver the required number of bottles during servicing visits; remove and dispose of used bottles in an environmentally responsible manner. * Provide an order process for individual Fire Stations and HQ to reorder directly via telephone or portal, with a capped maximum number per week. * Provide an SLA for servicing, including internal and external cleaning. Mains Water Chillers / Coolers * Supply and install free-standing, mains-fed water chillers as specified in the inventory. * Chillers must dispense both chilled and ambient temperature water. * The body of the chiller shall not be stainless steel; the Contractor must specify available colour/finish options. * Appearance and functionality to be suitable for high-traffic (station/office) environments. * State energy efficiency rating of each proposed unit. * Total care package to include cleaning reports/certificates, PAT testing records, and operative training for cleaning, descaling, and filter replacement at intervals appropriate for hard water areas. Service intervals must be detailed in the SLA. Instant Hot Water Boilers * Supply and install free-standing or wall-mounted hot water boilers as required. * Boilers must be capable of dispensing water at 100degC and accommodate various vessel sizes up to 2 litres. * Contractor to specify the material and available colour/finish options for the boiler body. * Appearance and functionality to be suitable for high-traffic (station/office) environments. * State energy efficiency rating of each proposed unit. * Total care package to include cleaning of exterior, descaling, and filter replacement, with service intervals confirmed in the SLA, appropriate for hard water areas. Maintenance and Compliance * Contractor to perform scheduled and reactive maintenance, ensuring all equipment remains fully operational and compliant with statutory requirements. * Provide all necessary PAT testing records and maintenance certificates. * Include training for RBFRS staff responsible for equipment cleaning and routine maintenance. Environmental Considerations * Contractor must demonstrate environmentally responsible practices for supply, disposal, and recycling of consumables and equipment. Service Level Agreement (SLA) * The Contractor shall provide a detailed SLA outlining all service intervals, response times, and performance standards for all equipment and services supplied under this contract Mobilisation * Prior to the commencement of the contract, the appointed contractor shall develop and execute a comprehensive mobilisation plan. This will include conducting site visits to perform assessment surveys of existing equipment. The assessment must verify the correct placement of units, evaluate the feasibility of transitioning from bottled water to a mains-fed cooling system, and incorporate any additional hot and cold-water points as directed by the relevant authority
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-h6vhtk-0667a5
- Publication Source
- Find A Tender Service
- Latest Notice
- https://www.find-tender.service.gov.uk/Notice/021993-2026
- Current Stage
- Award
- All Stages
- Award
Procurement Classification
- Notice Type
- UK7 - Contract Details Notice
- Procurement Type
- Standard
- Procurement Category
- Services
- Procurement Method
- Limited
- Procurement Method Details
- Below threshold - limited competition
- Tender Suitability
- Not specified
- Awardee Scale
- Large
Common Procurement Vocabulary (CPV)
- CPV Divisions
65 - Public utilities
-
- CPV Codes
65111000 - Drinking-water distribution
Notice Value(s)
- Tender Value
- Not specified
- Lots Value
- Not specified
- Awards Value
- Not specified
- Contracts Value
- £100,000 £100K-£500K
Notice Dates
- Publication Date
- 11 Mar 20263 days ago
- Submission Deadline
- Not specified
- Future Notice Date
- Not specified
- Award Date
- 24 Feb 20262 weeks ago
- Contract Period
- 25 Feb 2026 - 31 Jan 2028 1-2 years
- Recurrence
- Not specified
Notice Status
- Tender Status
- Complete
- Lots Status
- Complete
- Awards Status
- Active
- Contracts Status
- Active
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- ROYAL BERKSHIRE FIRE AUTHORITY
- Contact Name
- Available with D3 Tenders Premium →
- Contact Email
- Available with D3 Tenders Premium →
- Contact Phone
- Available with D3 Tenders Premium →
Buyer Location
- Locality
- READING
- Postcode
- RG31 7SD
- Post Town
- Reading
- Country
- England
-
- Major Region (ITL 1)
- TLJ South East (England)
- Basic Region (ITL 2)
- TLJ1 Berkshire, Buckinghamshire and Oxfordshire
- Small Region (ITL 3)
- TLJ16 Berkshire West
- Delivery Location
- Not specified
-
- Local Authority
- West Berkshire
- Electoral Ward
- Tilehurst Birch Copse
- Westminster Constituency
- Reading West and Mid Berkshire
Further Information
Notice Documents
-
https://www.find-tender.service.gov.uk/Notice/021993-2026
11th March 2026 - Contract details notice on Find a Tender
Open Contracting Data Standard (OCDS)
View full OCDS Record for this contracting process
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.
{
"tag": [
"compiled"
],
"id": "ocds-h6vhtk-0667a5-2026-03-11T16:39:27Z",
"date": "2026-03-11T16:39:27Z",
"ocid": "ocds-h6vhtk-0667a5",
"initiationType": "tender",
"parties": [
{
"id": "GB-PPON-PGTB-9133-ZLDZ",
"name": "Royal Berkshire Fire Authority",
"identifier": {
"scheme": "GB-PPON",
"id": "PGTB-9133-ZLDZ"
},
"address": {
"streetAddress": "Newsham Court",
"locality": "Reading",
"postalCode": "RG31 7SD",
"country": "GB",
"countryName": "United Kingdom",
"region": "UKJ11"
},
"contactPoint": {
"email": "procurementenquiries@rbfrs.co.uk"
},
"roles": [
"buyer"
],
"details": {
"classifications": [
{
"id": "publicAuthoritySubCentralGovernment",
"scheme": "UK_CA_TYPE",
"description": "Public authority - sub-central government"
}
]
}
},
{
"id": "GB-FTS-176920",
"name": "Circon Lt t/a Crown Water and Coffee",
"address": {
"streetAddress": "Cedar House, Grange Farm Long Lane Shaw",
"locality": "Newbury",
"postalCode": "RG14 2TF",
"country": "GB",
"countryName": "United Kingdom",
"region": "UKJ11"
},
"contactPoint": {
"email": "rupert@crowncoffee.co.uk"
},
"roles": [
"supplier"
],
"details": {
"scale": "large",
"vcse": false
}
}
],
"buyer": {
"id": "GB-PPON-PGTB-9133-ZLDZ",
"name": "Royal Berkshire Fire Authority"
},
"tender": {
"id": "1606",
"legalBasis": {
"id": "2023/54",
"scheme": "UKPGA",
"uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents"
},
"title": "Supply, installation, leasing, scheduled pre-planned and reactive maintenance for mains water chillers / coolers, bottled water chillers / coolers and instant hot water boiler",
"description": "Suppliers will be required to provide the following services in a cost-effective structure: General Requirements * The Contractor shall supply, install, and maintain all specified equipment at RBFRS locations. * Provision for leasing options, enabling RBFRS to forecast costs, maintain budget compliance, and upgrade or alter equipment in line with operational requirements. * All equipment shall operate from a standard 13-amp power supply, with electrical connections located within 1 metre, and water/drainage connections within 15 metres of installation points. * The Contractor shall provide a fixed monthly price for all services and assets supplied under this contract Equipment Specifications and Requirements * Supply and install free-standing, mains-fed machines at designated locations. * Appearance and functionality must be suitable for high-traffic areas (station/office). * Provision of PAT test certificates and installation records for all machines. * State the energy efficiency rating of the proposed units. * Total care package to include descaling and filter replacement at intervals suitable for hardwater areas. Service intervals to be specified in the Service Level Agreement (SLA). Bottled Water Chillers * Supply bottled water chillers at up to 34 designated sites, as per inventory. * Deliver the required number of bottles during servicing visits; remove and dispose of used bottles in an environmentally responsible manner. * Provide an order process for individual Fire Stations and HQ to reorder directly via telephone or portal, with a capped maximum number per week. * Provide an SLA for servicing, including internal and external cleaning. Mains Water Chillers / Coolers * Supply and install free-standing, mains-fed water chillers as specified in the inventory. * Chillers must dispense both chilled and ambient temperature water. * The body of the chiller shall not be stainless steel; the Contractor must specify available colour/finish options. * Appearance and functionality to be suitable for high-traffic (station/office) environments. * State energy efficiency rating of each proposed unit. * Total care package to include cleaning reports/certificates, PAT testing records, and operative training for cleaning, descaling, and filter replacement at intervals appropriate for hard water areas. Service intervals must be detailed in the SLA. Instant Hot Water Boilers * Supply and install free-standing or wall-mounted hot water boilers as required. * Boilers must be capable of dispensing water at 100degC and accommodate various vessel sizes up to 2 litres. * Contractor to specify the material and available colour/finish options for the boiler body. * Appearance and functionality to be suitable for high-traffic (station/office) environments. * State energy efficiency rating of each proposed unit. * Total care package to include cleaning of exterior, descaling, and filter replacement, with service intervals confirmed in the SLA, appropriate for hard water areas. Maintenance and Compliance * Contractor to perform scheduled and reactive maintenance, ensuring all equipment remains fully operational and compliant with statutory requirements. * Provide all necessary PAT testing records and maintenance certificates. * Include training for RBFRS staff responsible for equipment cleaning and routine maintenance. Environmental Considerations * Contractor must demonstrate environmentally responsible practices for supply, disposal, and recycling of consumables and equipment. Service Level Agreement (SLA) * The Contractor shall provide a detailed SLA outlining all service intervals, response times, and performance standards for all equipment and services supplied under this contract Mobilisation * Prior to the commencement of the contract, the appointed contractor shall develop and execute a comprehensive mobilisation plan. This will include conducting site visits to perform assessment surveys of existing equipment. The assessment must verify the correct placement of units, evaluate the feasibility of transitioning from bottled water to a mains-fed cooling system, and incorporate any additional hot and cold-water points as directed by the relevant authority",
"status": "complete",
"procurementMethod": "limited",
"procurementMethodDetails": "Below threshold - limited competition",
"lots": [
{
"id": "1",
"status": "complete"
}
]
},
"awards": [
{
"id": "1",
"status": "active",
"mainProcurementCategory": "services",
"suppliers": [
{
"id": "GB-FTS-176920",
"name": "Circon Lt t/a Crown Water and Coffee"
}
],
"items": [
{
"id": "1",
"additionalClassifications": [
{
"scheme": "CPV",
"id": "65111000",
"description": "Drinking-water distribution"
}
],
"deliveryAddresses": [
{
"region": "UKJ11",
"country": "GB",
"countryName": "United Kingdom"
}
],
"relatedLot": "1"
}
],
"relatedLots": [
"1"
]
}
],
"contracts": [
{
"id": "1",
"awardID": "1",
"title": "Supply, installation, leasing, scheduled pre-planned and reactive maintenance for mains water chillers / coolers, bottled water chillers / coolers and instant hot water boiler",
"status": "active",
"period": {
"startDate": "2026-02-25T00:00:00Z",
"endDate": "2028-01-31T23:59:59Z",
"maxExtentDate": "2030-01-31T23:59:59Z"
},
"hasRenewal": true,
"renewal": {
"description": "Option to extend for two further years in one year increments."
},
"value": {
"amountGross": 120000,
"amount": 100000,
"currency": "GBP"
},
"aboveThreshold": false,
"dateSigned": "2026-02-24T00:00:00Z",
"documents": [
{
"id": "021993-2026",
"documentType": "contractNotice",
"noticeType": "UK7",
"description": "Contract details notice on Find a Tender",
"url": "https://www.find-tender.service.gov.uk/Notice/021993-2026",
"datePublished": "2026-03-11T16:39:27Z",
"format": "text/html"
}
]
}
],
"language": "en"
}