Notice Information
Notice Title
Ground Investigations
Notice Description
Ground investigation will inform many aspects of the infrastructure design including slope angles for earthworks, foundations for all structures, suitability of material for reuse as fill, contaminated land, retaining wall, drainage design and design of temporary works. The ground investigations will inform the preliminary design for DCO and for the upcoming detailed design. The Phase 1 ground investigation will target areas that are identified by the designer as critical to the design such as major structures or areas of known geotechnical complexity.
Lot Information
Lot 1
Ground investigation surveys to inform many aspects of the infrastructure design including slope angles for earthworks, foundations for all structures, suitability of material for reuse as fill, contaminated land, retaining wall, drainage design and design of temporary works. considers that in circumstances where the Contractor was merely exercising a right to claim compensation under an NEC4 Option B "Priced Contract with a Bill of Quantities where there has been a change to the required quantities and the scope of the contract had not otherwise changed there has been no modification but that this is properly characterized as the operation of the contract as originally awarded. However as regards the additional ground investigation surveys, now required EWR acknowledges that this will involve a contractual modification to extend the scope.
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-h6vhtk-06cc82
- Publication Source
- Find A Tender Service
- Latest Notice
- https://www.find-tender.service.gov.uk/Notice/067106-2026
- Current Stage
- Award
- All Stages
- Award
Procurement Classification
- Notice Type
- Award Notice
- Procurement Type
- Dynamic
- Procurement Category
- Works
- Procurement Method
- Selective
- Procurement Method Details
- Restricted procedure
- Tender Suitability
- Not specified
- Awardee Scale
- SME
Common Procurement Vocabulary (CPV)
- CPV Divisions
-
- CPV Codes
45000000 - Construction work
Notice Value(s)
- Tender Value
- Not specified
- Lots Value
- Not specified
- Awards Value
- Not specified
- Contracts Value
- £31,308,167 £10M-£100M
Notice Dates
- Publication Date
- 16 Jul 20262 weeks ago
- Submission Deadline
- Not specified
- Future Notice Date
- Not specified
- Award Date
- 9 Oct 20241 years ago
- Contract Period
- Not specified - Not specified
- Recurrence
- Not specified
Notice Status
- Tender Status
- Complete
- Lots Status
- Cancelled
- Awards Status
- Active
- Contracts Status
- Active
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- EAST WEST RAILWAY COMPANY LIMITED
- Contact Name
- Available with D3 Tenders Premium →
- Contact Email
- Available with D3 Tenders Premium →
- Contact Phone
- Available with D3 Tenders Premium →
Buyer Location
- Locality
- MILTON KEYNES
- Postcode
- MK9 1EN
- Post Town
- Milton Keynes
- Country
- England
-
- Major Region (ITL 1)
- TLJ South East (England)
- Basic Region (ITL 2)
- TLJ1 Berkshire, Buckinghamshire and Oxfordshire
- Small Region (ITL 3)
- TLJ12 Milton Keynes
- Delivery Location
- Not specified
-
- Local Authority
- Milton Keynes
- Electoral Ward
- Central Milton Keynes
- Westminster Constituency
- Milton Keynes Central
Further Information
Open Contracting Data Standard (OCDS)
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.
{
"tag": [
"compiled"
],
"id": "ocds-h6vhtk-06cc82-2026-07-16T10:40:04+01:00",
"date": "2026-07-16T10:40:04+01:00",
"ocid": "ocds-h6vhtk-06cc82",
"description": "The value of this contract was initially estimated ( before commencing the procurement) as a below threshold contract. The contract was procured competitively through the RISQS qualification system using a competitive process akin to the restrictive procedure and a contract summary was published from contract finder. This summary indicated that the actual value of the contract, as awarded, was in fact above threshold.",
"initiationType": "tender",
"tender": {
"id": "CT3227",
"legalBasis": {
"id": "32014L0025",
"scheme": "CELEX"
},
"title": "Ground Investigations",
"status": "complete",
"classification": {
"scheme": "CPV",
"id": "45000000",
"description": "Construction work"
},
"mainProcurementCategory": "works",
"description": "Ground investigation will inform many aspects of the infrastructure design including slope angles for earthworks, foundations for all structures, suitability of material for reuse as fill, contaminated land, retaining wall, drainage design and design of temporary works. The ground investigations will inform the preliminary design for DCO and for the upcoming detailed design. The Phase 1 ground investigation will target areas that are identified by the designer as critical to the design such as major structures or areas of known geotechnical complexity.",
"lots": [
{
"id": "1",
"description": "Ground investigation surveys to inform many aspects of the infrastructure design including slope angles for earthworks, foundations for all structures, suitability of material for reuse as fill, contaminated land, retaining wall, drainage design and design of temporary works. considers that in circumstances where the Contractor was merely exercising a right to claim compensation under an NEC4 Option B \"Priced Contract with a Bill of Quantities where there has been a change to the required quantities and the scope of the contract had not otherwise changed there has been no modification but that this is properly characterized as the operation of the contract as originally awarded. However as regards the additional ground investigation surveys, now required EWR acknowledges that this will involve a contractual modification to extend the scope.",
"awardCriteria": {
"criteria": [
{
"name": "Health wellbeing safe and security",
"type": "quality",
"description": "21"
},
{
"name": "Geotechnical and Geoenvironmental",
"type": "quality",
"description": "42"
},
{
"name": "Environmental sustainability and social value",
"type": "quality",
"description": "7"
},
{
"name": "Pricing schedule",
"type": "cost",
"description": "30"
}
]
},
"hasOptions": false,
"status": "cancelled",
"contractPeriod": {
"durationInDays": 720
}
}
],
"items": [
{
"id": "1",
"deliveryAddresses": [
{
"region": "UK"
},
{
"region": "UK"
}
],
"relatedLot": "1"
}
],
"procurementMethod": "selective",
"procurementMethodDetails": "Restricted procedure",
"techniques": {
"hasDynamicPurchasingSystem": true
},
"coveredBy": [
"GPA"
]
},
"awards": [
{
"id": "067081-2026-CT3227-1",
"relatedLots": [
"1"
],
"status": "active",
"suppliers": [
{
"id": "GB-COH-03401367",
"name": "Concept engineering consultant Ltd"
}
]
},
{
"id": "067106-2026-CT3227-1",
"relatedLots": [
"1"
],
"status": "active",
"suppliers": [
{
"id": "GB-COH-03401367",
"name": "Concept engineering consultants Ltd"
}
]
}
],
"parties": [
{
"id": "GB-COH-11072935",
"name": "EAST WEST RAILWAY COMPANY LIMITED",
"identifier": {
"legalName": "EAST WEST RAILWAY COMPANY LIMITED",
"id": "11072935",
"scheme": "GB-COH"
},
"address": {
"streetAddress": "The Quadrant",
"locality": "Milton Keynes",
"region": "UKJ12",
"postalCode": "MK91EN",
"countryName": "United Kingdom"
},
"contactPoint": {
"name": "annmarie quinlan",
"telephone": "+44 3301340067",
"email": "annmarie.quinlan@eastwestrail.co.uk"
},
"roles": [
"buyer"
],
"details": {
"url": "http://www.eastwestrail.co.uk",
"classifications": [
{
"scheme": "TED_CE_ACTIVITY",
"description": "transport"
}
]
}
},
{
"id": "GB-COH-03401367",
"name": "Concept engineering consultants Ltd",
"identifier": {
"legalName": "Concept engineering consultants Ltd",
"id": "03401367",
"scheme": "GB-COH"
},
"address": {
"locality": "Leicester",
"region": "UK",
"postalCode": "Le3 3aw",
"countryName": "United Kingdom"
},
"roles": [
"supplier"
],
"details": {
"scale": "sme"
}
},
{
"id": "GB-FTS-184856",
"name": "Technology and Construction Court",
"identifier": {
"legalName": "Technology and Construction Court"
},
"address": {
"streetAddress": "7 Rolls Buildings, Fetter Lane",
"locality": "London",
"countryName": "United Kingdom"
},
"roles": [
"reviewBody"
]
},
{
"id": "GB-FTS-184858",
"name": "Technology and construction court",
"identifier": {
"legalName": "Technology and construction court"
},
"address": {
"streetAddress": "7 Rolls Buildings, Fetter Lane",
"locality": "London",
"countryName": "United Kingdom"
},
"roles": [
"reviewBody"
]
}
],
"buyer": {
"id": "GB-COH-11072935",
"name": "EAST WEST RAILWAY COMPANY LIMITED"
},
"contracts": [
{
"id": "067081-2026-CT3227-1",
"awardID": "067081-2026-CT3227-1",
"status": "active",
"value": {
"amount": 6308167.33,
"currency": "GBP"
},
"dateSigned": "2024-10-10T00:00:00+01:00"
},
{
"id": "067106-2026-CT3227-1",
"awardID": "067106-2026-CT3227-1",
"status": "active",
"value": {
"amount": 25000000,
"currency": "GBP"
},
"dateSigned": "2024-10-10T00:00:00+01:00",
"period": {
"durationInDays": 720
},
"items": [
{
"id": "1",
"classification": {
"scheme": "CPV",
"id": "45000000",
"description": "Construction work"
},
"deliveryAddresses": [
{
"region": "UK"
}
],
"relatedLot": "1"
}
],
"amendments": [
{
"id": "1",
"description": "Increase in value to enable continued delivery of works pending replacement arrangements",
"rationale": "Need for additional works, services or supplies by the original contractor/concessionaire: Primary justification - Regulation 88(1)(b) UCR 2016 (Additional services) The modification is required to procure additional works of the same type from the original contractor which have become necessary for the continued delivery of the programme and were not included in the original procurement. As design develops to take account of consultation feedback and identifications of new risks and opportunities it is not unusual for additional surveys to be required. The conditions for Regulation 88(1)(b) are satisfied as follows: 1. Necessity of additional services * Provision of additional ground investigation surveys is required to support ongoing rail infrastructure development by informing the design and ensuring on-time delivery of the East West Rail Development Consent Orderr * These additional surveys/ boreholes clearly do not change the overall nature of the contract 2. Inability to change contractor for economic / technical reasons without major inconvenience or cost duplication * The contracting entity has recently procured a replacement contractor, Kier Integrated Services Limited (\"Kier\") to lead Surveys Phase 2 through the SCAPE Utilities Works and Services Framework. Part of the responsibilities of the replacement contractor include surveys, including ground investigation surveys. Kier has been appointed from the SCAPE framework to provide the works and are expected to commence works in June 2026. Given this appointment it would not be feasible to hold a further competitive tender to make a short-term interim appointment to deliver the additional ground investigations required surveys prior to the commencement of the replacement Surveys Phase 2 contract with Kier. To do so would cause major inconvenience by delaying the EWR programme and impacting on the process of obtaining the Development Consent Order. Such an appointment would also involve cost duplication, for example by having two separate contractors incur mobilization costs) given that Kier will separately be mobilising. Therefore, only practicable step to deliver the approximate additional ground investigation surveys is to modify the existing appointment to facilitate this."
}
]
}
],
"bids": {
"statistics": [
{
"id": "1",
"measure": "bids",
"relatedLot": "1",
"value": 5
}
]
},
"links": [
{
"rel": "prev",
"href": "https://ted.europa.eu/udl?uri=TED:NOTICE:443168-2020:TEXT:EN:HTML"
}
],
"language": "en"
}