Summary of the contracting process

Sir Roger Manwood’s School is procuring refurbishment and alteration works to an existing building to create a sixth form centre. The work is a construction project, with the school in Sandwich, Kent, as the buying organisation. The scope includes construction and associated pre-construction work; bidders are asked to price preliminaries, overheads and profit and provide a construction programme. The intended building work is at the school. This is a single construction requirement rather than a set of separately described lots, and the opportunity is identified as suitable for small and medium-sized businesses. The school’s brief describes a two-stage tender, with the final contract sum to be negotiated against the developed design after first-stage submissions.

The school invited offers through an open procedure. This is the tender stage: the first-stage submission is followed by an intended negotiation with one contractor, although the school reserves the right to approach more than one. Enquiries were due by 30 November 2026 at 23:59 UTC, and tenders by 13 December 2026 at 23:59 UTC. The planned contract period runs from 1 January to 31 August 2027; the award decision was due by 18 December 2026. The estimated value is £1.55 million excluding VAT (£1.86 million including VAT). Evaluation is based on price and quality: the stated scores are 60% for price and 40% for quality. Quality covers project delivery experience, methodology and site constraints, team and qualifications, programme, and social value and sustainability.

This opportunity suits building contractors able to refurbish and alter an existing school building and deliver a sixth form centre. Bidders need to demonstrate relevant project delivery experience and explain how they would carry out the works, including how they would manage site constraints. The school expects details of the proposed project team, its roles and responsibilities, and staff qualifications, alongside a detailed programme with milestones, work breakdown and critical paths. First-stage submissions must include a priced contract sum analysis, fully priced preliminaries, overheads and profit, any fees or costs between tender stages, a construction programme and a budget cost with commentary against the school’s elemental budget. Contractors are also expected to address affordability, social value and sustainability. The brief anticipates development of the design before final price negotiation.

How relevant is this notice?

Notice Information

Notice Title

Sir Roger Manwood's School - Grange Sixth Form refurbishment

Notice Description

Refurbishment and alterations to an existing building to create a sixth form centre. The Tenderer must submit the following as part of their first stage tender submission:- 1st Stage Tender * Priced copy of the Contract Sum Analysis (see Section Nr 6) with fully priced preliminaries book (fixed and time-related items) and overheads and profit only (refer to Appendix C2 for pricing requirements) * Fees, overheads and profit between Stage 1 and 2 tender (if required) * Construction programme detailing the works required to complete the project * Budget cost for the construction works - providing commentary and comparison to the elemental budget figures provided within Section Nr. 6 2nd Stage Tender Following the 1st Stage, the intention is that a single contractor will be invited to negotiate a final contract sum based on the RIBA 4 design information . However, the Employer reserves the right to approach more than one contractor during the second stage.

Notice Details

Publication & Lifecycle

Open Contracting ID
ocds-h6vhtk-07bbd3
Publication Source
Find A Tender Service
Latest Notice
https://www.find-tender.service.gov.uk/Notice/108688-2026
Current Stage
Tender
All Stages
Tender

Procurement Classification

Notice Type
UK4 - Tender Notice
Procurement Type
Standard
Procurement Category
Works
Procurement Method
Open
Procurement Method Details
Open procedure
Tender Suitability
SME
Awardee Scale
Not specified

Common Procurement Vocabulary (CPV)

CPV Divisions

45 - Construction work


CPV Codes

45000000 - Construction work

Notice Value(s)

Tender Value
£1,550,000 £1M-£10M
Lots Value
£1,550,000 £1M-£10M
Awards Value
Not specified
Contracts Value
Not specified

Notice Dates

Publication Date
16 Nov 2026Today
Submission Deadline
13 Dec 20264 weeks to go
Future Notice Date
Not specified
Award Date
Not specified
Contract Period
1 Jan 2027 - 31 Aug 2027 6-12 months
Recurrence
Not specified

Notice Status

Tender Status
Active
Lots Status
Active
Awards Status
Not Specified
Contracts Status
Not Specified

Buyer & Supplier

Contracting Authority (Buyer)

Main Buyer
Sir Roger Manwood's School
Contact Name
Available with D3 Tenders Premium →
Contact Email
Available with D3 Tenders Premium →
Contact Phone
Available with D3 Tenders Premium →

Buyer Location

Locality
SANDWICH
Postcode
CT13 9JX
Postcode Area
Canterbury
Country
England

Major Region (ITL 1)
TLJ South East (England)
Basic Region (ITL 2)
TLJ4 Kent
Small Region (ITL 3)
TLJ44 East Kent
Delivery Location
TLC North East (England), TLD North West (England), TLE Yorkshire and The Humber, TLF East Midlands (England), TLG West Midlands (England), TLH East (England), TLI London, TLJ South East (England), TLK South West (England)

Local Authority
Dover
Electoral Ward
Sandwich
Westminster Constituency
Herne Bay and Sandwich

Further Information

Notice Documents

Open Contracting Data Standard (OCDS)

View full OCDS Record for this contracting process

JSON Markdown

The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.

Loading OCDS record...