Notice Information
Notice Title
CVL Transformation - Package 06A Permanent Way (Complex) - ITT
Notice Description
Scopes:Civils construction elements included in the framework:- Level Boarding- Under Track Crossings- Installation of Station Tactiles- Earthworks schemes- Retaining wall schemes- Culvert construction- Track drainageCwmbach Station Level BoardingDrawings - Cwmbach StationSupplier to carry out their own takeoff to confirm actual works and quantities- Corus Style Section - contains but not limited to- Remove front steel angle- Remove Coper and Tactile- Clean off steel deck- Make steel work adjustments- Reinstall coper to new line and level- Install tactile- Adjust platform surface to suit- Reapply white/yellow lines- Supply spare materials (10%)- Block & Beam - contains but not limited to- Remove Cope and Tactile- Clean off surface- Reinstall coper to new line and level- Install tactile- Adjust platform surface to suit- Reapply white/yellow lines- Supply spare materials (10%)- Engineer provision- Setting out and gauge surveys- As-built production of level boarding- Quality control - BIM360 checklists and sign offWorking/access availability- Works to be planned to be carried out Midweek Nights based on 7hour possession times and a Saturday night Possession window of 8 hoursAdditional Information- Schedule of rates (produce list of competencies)- Mid week days- Mid week nights- Weekend days- Weekend nights- Bank Holidays- Welfare Van- Groundhog- List of all materials including rates- Cancellation notice period- Stand Down RatesAttendances- BB/AIW to supply Main Welfare Accommodation- BB/AIW will provide Possession Management Staff- BB to provide access to digital systems - supplier to provide hardware (iPAD)- Supplier to provide all site labour including COSS/SWL- Supplier to ensure that COSS/SWL are to have iPADs to use the digital epics system- Supplier to provide localised welfare as required- Supplier to provide all materials (inc water etc)- Supplier to provide all plant and tools (inc site lighting)Pentrebach Station Level boardingDrawing - Pentrebach LBSupplier to carry out their own take off to confirm actual works and quantities- Supplier to provide full details of Method and Risks- Standard platform construction - contains but not limited to- Remove Coper and Tactile- Clean off surface- Raise blockwork and over sail blocks- Install FP McMann Tactile and coper unit- Raise ironwork- Install edging kerbs to back of platform and around cabinets- Alter platform drainage- Install surfacing to suit new coper levels and falls as per design- Reapply white/yellow lines- Supply spare materials (10%)- Engineer provision- Setting out and gauge surveys- As-built production of level boarding- Quality control - BIM360 checklists and sign offWorking/access availability- Works to be planned to be carried out during a blockade, please can the supplier identify how long they require to complete these works.Additional Information- Schedule of rates (produce list of competencies)- Mid week days- Mid week nights- Weekend days- Weekend nights- Bank Holidays- Welfare Van- Groundhog- List of all materials including rates- Cancellation notice period- Stand Down RatesAttendances- BB/AIW to supply Main Welfare Accommodation- BB/AIW will provide Possession Management Staff- Supplier to provide all site labour including COSS/SWL- Supplier to ensure that COSS/SWL are to have digital tablets to use the digital epics system- Supplier to provide localised welfare as required- Supplier to provide all materials (inc water etc)- Supplier to provide all plant and tools (inc site lighting)Taffs Well UTXTaffs Well UTX Drawing - TRAN01-KAW-R0-R2P-DDR-C-CV-000114 - 26082020.pdfStandard UTX Construction- Procurement of UTX Materials- Installation of Up Main Chamber- Installation of 9.150m 4 way duct crossing- Installation of Down Main Chamber- Installation of hardstanding's and handrail- Handback Engineer following each shift in the Track Support Zone- All plant and materials to complete the works (excluding RRV's)- Track monitoring shift following construction- 7 Days following construction in the first week- 2 days in the second week- 2 days in the third week- 1 day in the fourth week- Temporary works supervisor provision- Engineer provision- Setting out of snake grid coordinates- As-built production of UTX- Quality control - BIM360 checklists and sign offAdditional Information- Schedule of rates (produce list of competencies)- Mid week days- Mid week nights- Weekend days- Weekend nights- Bank Holidays- Welfare Van- Groundhog- List of all materials including rates- Cancellation notice period- Stand Down RatesAttendances- RRV's will be provided by BB- Temporary works provided by BB- BB/AIW to supply Main Welfare Accommodation- BB/AIW will provide Possession Management Staff- Supplier to provide all site labour including COSS/SWL- Supplier to ensure that COSS/SWL are to have digital tablets to use the digital epics system- Supplier to provide localised welfare as required- Supplier to provide all materials (inc water etc)- Supplier to provide all plant and tools (inc site lighting)NOTE: To register your interest in this notice and obtain any additional information please visit the Sell2Wales Web Site at https://www.sell2wales.gov.wales/Search/Search_Switch.aspx?ID=120841. Request for further information should be submitted through the Questions and Answers function on Sell2Wales. Please record your interest in the notice to submit a question. Sub-contracting opportunities published on Sell2Wales are business-to-business transactions and are not subject to the normal public sector and EU rules regarding procurement. The Welsh Government does not accept responsibility or liability for the content, evaluation or award of sub-contracting opportunities.(WA Ref:120841)Relates to the following project/programme financed by EU Community Funds: More details available upon request.
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-kuma6s-120841
- Publication Source
- Sell2Wales
- Latest Notice
- https://www.sell2wales.gov.wales/search/search_switch.aspx?ID=120841
- Current Stage
- Award
- All Stages
- Award
Procurement Classification
- Notice Type
- S2W Notice - Sub Contract Award
- Procurement Type
- Standard
- Procurement Category
- Works
- Procurement Method
- Not Specified
- Procurement Method Details
- Not specified
- Tender Suitability
- Not specified
- Awardee Scale
- Not specified
Common Procurement Vocabulary (CPV)
- CPV Divisions
-
- CPV Codes
Notice Value(s)
- Tender Value
- Not specified
- Lots Value
- Not specified
- Awards Value
- £3,000,000 £1M-£10M
- Contracts Value
- Not specified
Notice Dates
- Publication Date
- 13 Jan 20233 years ago
- Submission Deadline
- 6 May 2022Expired
- Future Notice Date
- Not specified
- Award Date
- 28 Apr 20223 years ago
- Contract Period
- Not specified - Not specified
- Recurrence
- Not specified
Notice Status
- Tender Status
- Not Specified
- Lots Status
- Not Specified
- Awards Status
- Not Specified
- Contracts Status
- Not Specified
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- BALFOUR BEATTY RAIL
- Contact Name
- Perminder Raju
- Contact Email
- perminder.raju@balfourbeatty.com
- Contact Phone
- +44 7973494330
Buyer Location
- Locality
- PONTYPRIDD
- Postcode
- CF37 5UT
- Post Town
- Cardiff
- Country
- Wales
-
- Major Region (ITL 1)
- TLL Wales
- Basic Region (ITL 2)
- TLL5 South East Wales
- Small Region (ITL 3)
- TLL51 Central Valleys and Bridgend
- Delivery Location
- Not specified
-
- Local Authority
- Rhondda Cynon Taf
- Electoral Ward
- Hawthorn and Lower Rhydfelen
- Westminster Constituency
- Pontypridd
Further Information
Open Contracting Data Standard (OCDS)
View full OCDS Record for this contracting process
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.
{
"tag": [
"compiled"
],
"id": "ocds-kuma6s-120841-2023-01-13T09:01:25Z",
"date": "2023-01-13T09:01:25Z",
"ocid": "ocds-kuma6s-120841",
"initiationType": "tender",
"parties": [
{
"id": "org-1",
"name": "Balfour Beatty Rail",
"address": {
"streetAddress": "Procurement, Transport for Wales CVL Infrastructure Depot, Treforest Industrial Estate,",
"locality": "Pontypridd",
"postalCode": "CF37 5UT"
},
"contactPoint": {
"name": "Perminder Raju",
"email": "perminder.raju@balfourbeatty.com",
"telephone": "+44 7973494330",
"url": "https://www.balfourbeatty.com/expertise/rail-engineering/"
},
"roles": [
"buyer"
]
},
{
"id": "org-2",
"name": "Enable Infrastructure Ltd",
"address": {
"streetAddress": "164 Westminster Bridge Road,",
"locality": "London",
"postalCode": "SE17RW"
},
"contactPoint": {
"email": "tendering@bcmconstruction.co.uk"
},
"roles": [
"supplier"
]
},
{
"id": "org-3",
"name": "Ngage Resourcing",
"address": {
"streetAddress": "148 High St ,",
"locality": "Merthyr Tydfil",
"postalCode": "cf478dp"
},
"contactPoint": {
"email": "andrew.mason@ngageresourcing.com"
},
"roles": [
"supplier"
]
},
{
"id": "org-4",
"name": "Mikerry Rail Limited",
"address": {
"streetAddress": "Unit 1 Pontsarn Road,",
"locality": "Merthyr Tydfil",
"postalCode": "CF482TN"
},
"contactPoint": {
"email": "REBECCA@MIKERRYRAIL.CO.UK"
},
"roles": [
"supplier"
]
},
{
"id": "org-5",
"name": "Critical Rail Ltd",
"address": {
"streetAddress": "19 Duke Street, Depot Road,",
"locality": "Aberdare",
"postalCode": "CF447ED"
},
"contactPoint": {
"email": "adam.hopkins@criticalrail.co.uk"
},
"roles": [
"supplier"
]
},
{
"id": "org-6",
"name": "Wps Special Projects",
"address": {
"streetAddress": "44 Boulevard,",
"locality": "Weston-Super-Mare",
"postalCode": "BS231NF"
},
"contactPoint": {
"email": "Paul@wpssp.co.uk"
},
"roles": [
"tenderer"
]
},
{
"id": "org-7",
"name": "Environmental Forestry Uk Ltd",
"address": {
"streetAddress": "1 Woodside Farm Cottages, Gosport Road, Privett,",
"locality": "Alton",
"postalCode": "GU343NJ"
},
"contactPoint": {
"email": "ryan@eflrail.co.uk"
},
"roles": [
"tenderer"
]
},
{
"id": "org-8",
"name": "Rts Tree Specialist Ltd",
"address": {
"streetAddress": "Unit 9, Ynyswen Industrial Estate,",
"locality": "Treorchy",
"postalCode": "CF426EP"
},
"contactPoint": {
"email": "Paul.kerslake@rtstreespecialist.com"
},
"roles": [
"tenderer"
]
},
{
"id": "org-9",
"name": "Ck Rail Solutions Ltd",
"address": {
"streetAddress": "Mcgregors Way, Turnoakes Business Park,",
"locality": "Chesterfield",
"postalCode": "S402WB"
},
"contactPoint": {
"email": "dawn.earnshaw@ck-rail.com"
},
"roles": [
"tenderer"
]
},
{
"id": "org-10",
"name": "Lbh Rail & Civil Engineering Ltd.",
"address": {
"streetAddress": "Unit 1, Pant Industrial Estate, Dowlais,",
"locality": "Merthyr Tydfil",
"postalCode": "CF482SR"
},
"contactPoint": {
"email": "debby@lbhrail.com"
},
"roles": [
"tenderer"
]
},
{
"id": "org-11",
"name": "Kpi Rail And Infrastructure",
"address": {
"streetAddress": "505 Etruria Road , Basford,",
"locality": "Stoke-On-Trent",
"postalCode": "ST46JH"
},
"contactPoint": {
"email": "GrahamP@KPIRI.co.uk"
},
"roles": [
"tenderer"
]
},
{
"id": "org-12",
"name": "Jj Williams (Painting Services) Ltd",
"address": {
"streetAddress": "75 Village Farm Road, Village Farm Industrial Estate,",
"locality": "Pyle",
"postalCode": "CF336BN"
},
"contactPoint": {
"email": "graham@jjwilliamsltd.com"
},
"roles": [
"tenderer"
]
},
{
"id": "org-13",
"name": "Amalgamated Construction Ltd",
"address": {
"streetAddress": "Whaley Road, Barugh,",
"locality": "Barnsley",
"postalCode": "S751HT"
},
"contactPoint": {
"email": "ktruelove@amco.co.uk"
},
"roles": [
"tenderer"
]
},
{
"id": "org-14",
"name": "Collis Engineering Limited",
"address": {
"streetAddress": "Salcombe Road,",
"locality": "Alfreton",
"postalCode": "DE557RG"
},
"contactPoint": {
"email": "Sales@collis.co.uk"
},
"roles": [
"tenderer"
]
},
{
"id": "org-15",
"name": "Tom Prichard Holdings Ltd",
"address": {
"streetAddress": "Tom Prichard Holdings Ltd, Earthmovers House Unit 16 Llantrisant Business Park,",
"locality": "Pontyclun",
"postalCode": "CF728LF"
},
"contactPoint": {
"email": "contracts@prichardholdings.co.uk"
},
"roles": [
"tenderer"
]
},
{
"id": "org-16",
"name": "Excell Rail Ltd",
"address": {
"streetAddress": "Rear Of Unit 5, Seven Road, Treforest Industrial Estate ,",
"locality": "Pontypridd",
"postalCode": "CF375SP"
},
"contactPoint": {
"email": "dan@excellrail.co.uk"
},
"roles": [
"tenderer"
]
},
{
"id": "org-17",
"name": "Ganymede Solutions Limited",
"address": {
"streetAddress": "G16-19 Ty Antur, Navigation Park ,",
"locality": "Abercynon",
"postalCode": "CF454SN"
},
"contactPoint": {
"email": "tenders@ganymedesolutions.co.uk"
},
"roles": [
"tenderer"
]
},
{
"id": "org-18",
"name": "Socotec Uk Limited",
"address": {
"streetAddress": "Socotec House, Bretby Business Park, Ashby Road,",
"locality": "Burton-On-Trent, Staffordshire",
"postalCode": "DE150YZ"
},
"contactPoint": {
"email": "Socotec.Bids@socotec.com"
},
"roles": [
"tenderer"
]
},
{
"id": "org-19",
"name": "Rss Infrastructure",
"address": {
"streetAddress": "Unit 36, Springvale Industrial Estate,",
"locality": "Cwmbran",
"postalCode": "NP445BD"
},
"contactPoint": {
"email": "s2w@rssinfrastructure.com"
},
"roles": [
"tenderer"
]
}
],
"buyer": {
"name": "Balfour Beatty Rail",
"id": "org-1"
},
"tender": {
"id": "ocds-kuma6s-120841-tender-120841",
"title": "CVL Transformation - Package 06A Permanent Way (Complex) - ITT",
"description": "Scopes:Civils construction elements included in the framework:- Level Boarding- Under Track Crossings- Installation of Station Tactiles- Earthworks schemes- Retaining wall schemes- Culvert construction- Track drainageCwmbach Station Level BoardingDrawings - Cwmbach StationSupplier to carry out their own takeoff to confirm actual works and quantities- Corus Style Section - contains but not limited to- Remove front steel angle- Remove Coper and Tactile- Clean off steel deck- Make steel work adjustments- Reinstall coper to new line and level- Install tactile- Adjust platform surface to suit- Reapply white/yellow lines- Supply spare materials (10%)- Block & Beam - contains but not limited to- Remove Cope and Tactile- Clean off surface- Reinstall coper to new line and level- Install tactile- Adjust platform surface to suit- Reapply white/yellow lines- Supply spare materials (10%)- Engineer provision- Setting out and gauge surveys- As-built production of level boarding- Quality control - BIM360 checklists and sign offWorking/access availability- Works to be planned to be carried out Midweek Nights based on 7hour possession times and a Saturday night Possession window of 8 hoursAdditional Information- Schedule of rates (produce list of competencies)- Mid week days- Mid week nights- Weekend days- Weekend nights- Bank Holidays- Welfare Van- Groundhog- List of all materials including rates- Cancellation notice period- Stand Down RatesAttendances- BB/AIW to supply Main Welfare Accommodation- BB/AIW will provide Possession Management Staff- BB to provide access to digital systems - supplier to provide hardware (iPAD)- Supplier to provide all site labour including COSS/SWL- Supplier to ensure that COSS/SWL are to have iPADs to use the digital epics system- Supplier to provide localised welfare as required- Supplier to provide all materials (inc water etc)- Supplier to provide all plant and tools (inc site lighting)Pentrebach Station Level boardingDrawing - Pentrebach LBSupplier to carry out their own take off to confirm actual works and quantities- Supplier to provide full details of Method and Risks- Standard platform construction - contains but not limited to- Remove Coper and Tactile- Clean off surface- Raise blockwork and over sail blocks- Install FP McMann Tactile and coper unit- Raise ironwork- Install edging kerbs to back of platform and around cabinets- Alter platform drainage- Install surfacing to suit new coper levels and falls as per design- Reapply white/yellow lines- Supply spare materials (10%)- Engineer provision- Setting out and gauge surveys- As-built production of level boarding- Quality control - BIM360 checklists and sign offWorking/access availability- Works to be planned to be carried out during a blockade, please can the supplier identify how long they require to complete these works.Additional Information- Schedule of rates (produce list of competencies)- Mid week days- Mid week nights- Weekend days- Weekend nights- Bank Holidays- Welfare Van- Groundhog- List of all materials including rates- Cancellation notice period- Stand Down RatesAttendances- BB/AIW to supply Main Welfare Accommodation- BB/AIW will provide Possession Management Staff- Supplier to provide all site labour including COSS/SWL- Supplier to ensure that COSS/SWL are to have digital tablets to use the digital epics system- Supplier to provide localised welfare as required- Supplier to provide all materials (inc water etc)- Supplier to provide all plant and tools (inc site lighting)Taffs Well UTXTaffs Well UTX Drawing - TRAN01-KAW-R0-R2P-DDR-C-CV-000114 - 26082020.pdfStandard UTX Construction- Procurement of UTX Materials- Installation of Up Main Chamber- Installation of 9.150m 4 way duct crossing- Installation of Down Main Chamber- Installation of hardstanding's and handrail- Handback Engineer following each shift in the Track Support Zone- All plant and materials to complete the works (excluding RRV's)- Track monitoring shift following construction- 7 Days following construction in the first week- 2 days in the second week- 2 days in the third week- 1 day in the fourth week- Temporary works supervisor provision- Engineer provision- Setting out of snake grid coordinates- As-built production of UTX- Quality control - BIM360 checklists and sign offAdditional Information- Schedule of rates (produce list of competencies)- Mid week days- Mid week nights- Weekend days- Weekend nights- Bank Holidays- Welfare Van- Groundhog- List of all materials including rates- Cancellation notice period- Stand Down RatesAttendances- RRV's will be provided by BB- Temporary works provided by BB- BB/AIW to supply Main Welfare Accommodation- BB/AIW will provide Possession Management Staff- Supplier to provide all site labour including COSS/SWL- Supplier to ensure that COSS/SWL are to have digital tablets to use the digital epics system- Supplier to provide localised welfare as required- Supplier to provide all materials (inc water etc)- Supplier to provide all plant and tools (inc site lighting)NOTE: To register your interest in this notice and obtain any additional information please visit the Sell2Wales Web Site at https://www.sell2wales.gov.wales/Search/Search_Switch.aspx?ID=120841. Request for further information should be submitted through the Questions and Answers function on Sell2Wales. Please record your interest in the notice to submit a question. Sub-contracting opportunities published on Sell2Wales are business-to-business transactions and are not subject to the normal public sector and EU rules regarding procurement. The Welsh Government does not accept responsibility or liability for the content, evaluation or award of sub-contracting opportunities.(WA Ref:120841)Relates to the following project/programme financed by EU Community Funds: More details available upon request.",
"mainProcurementCategory": "works",
"tenderPeriod": {
"endDate": "2022-05-06T16:00:00Z"
},
"awardPeriod": {
"endDate": "2022-06-10T00:00:00Z"
},
"documents": [
{
"id": "doc-obtain"
}
],
"additionalClassifications": [
{
"id": "61",
"description": "Transport For Wales - Core Valley Lines",
"scheme": "CPV"
}
]
},
"awards": [
{
"id": "ocds-kuma6s-120841-award-120841-1",
"title": "Civils Construction Framework",
"date": "2022-04-28T00:00:00Z"
},
{
"id": "ocds-kuma6s-120841-award-128120-1",
"value": {
"amount": 3000000
},
"suppliers": [
{
"id": "org-2",
"name": "Enable Infrastructure Ltd"
}
]
},
{
"id": "ocds-kuma6s-120841-award-128120-2",
"value": {
"amount": 3000000
},
"suppliers": [
{
"id": "org-3",
"name": "Ngage Resourcing"
}
]
},
{
"id": "ocds-kuma6s-120841-award-128120-3",
"value": {
"amount": 3000000
},
"suppliers": [
{
"id": "org-4",
"name": "Mikerry Rail Limited"
}
]
},
{
"id": "ocds-kuma6s-120841-award-128120-4",
"value": {
"amount": 3000000
},
"suppliers": [
{
"id": "org-5",
"name": "Critical Rail Ltd"
}
]
}
],
"noticetype": "S2W Notice - Sub Contract Award",
"contracts": [
{
"id": "ocds-kuma6s-120841-contract-128120-1",
"awardID": "awd-1",
"title": "Civils Construction Framework",
"description": "Scopes:Civils construction elements included in the framework:- Level Boarding- Under Track Crossings- Installation of Station Tactiles- Earthworks schemes- Retaining wall schemes- Culvert construction- Track drainageCwmbach Station Level BoardingDrawings - Cwmbach StationSupplier to carry out their own takeoff to confirm actual works and quantities- Corus Style Section - contains but not limited to- Remove front steel angle- Remove Coper and Tactile- Clean off steel deck- Make steel work adjustments- Reinstall coper to new line and level- Install tactile- Adjust platform surface to suit- Reapply white/yellow lines- Supply spare materials (10%)- Block & Beam - contains but not limited to- Remove Cope and Tactile- Clean off surface- Reinstall coper to new line and level- Install tactile- Adjust platform surface to suit- Reapply white/yellow lines- Supply spare materials (10%)- Engineer provision- Setting out and gauge surveys- As-built production of level boarding- Quality control - BIM360 checklists and sign offWorking/access availability- Works to be planned to be carried out Midweek Nights based on 7hour possession times and a Saturday night Possession window of 8 hoursAdditional Information- Schedule of rates (produce list of competencies)- Mid week days- Mid week nights- Weekend days- Weekend nights- Bank Holidays- Welfare Van- Groundhog- List of all materials including rates- Cancellation notice period- Stand Down RatesAttendances- BB/AIW to supply Main Welfare Accommodation- BB/AIW will provide Possession Management Staff- BB to provide access to digital systems - supplier to provide hardware (iPAD)- Supplier to provide all site labour including COSS/SWL- Supplier to ensure that COSS/SWL are to have iPADs to use the digital epics system- Supplier to provide localised welfare as required- Supplier to provide all materials (inc water etc)- Supplier to provide all plant and tools (inc site lighting)Pentrebach Station Level boardingDrawing - Pentrebach LBSupplier to carry out their own take off to confirm actual works and quantities- Supplier to provide full details of Method and Risks- Standard platform construction - contains but not limited to- Remove Coper and Tactile- Clean off surface- Raise blockwork and over sail blocks- Install FP McMann Tactile and coper unit- Raise ironwork- Install edging kerbs to back of platform and around cabinets- Alter platform drainage- Install surfacing to suit new coper levels and falls as per design- Reapply white/yellow lines- Supply spare materials (10%)- Engineer provision- Setting out and gauge surveys- As-built production of level boarding- Quality control - BIM360 checklists and sign offWorking/access availability- Works to be planned to be carried out during a blockade, please can the supplier identify how long they require to complete these works.Additional Information- Schedule of rates (produce list of competencies)- Mid week days- Mid week nights- Weekend days- Weekend nights- Bank Holidays- Welfare Van- Groundhog- List of all materials including rates- Cancellation notice period- Stand Down RatesAttendances- BB/AIW to supply Main Welfare Accommodation- BB/AIW will provide Possession Management Staff- Supplier to provide all site labour including COSS/SWL- Supplier to ensure that COSS/SWL are to have digital tablets to use the digital epics system- Supplier to provide localised welfare as required- Supplier to provide all materials (inc water etc)- Supplier to provide all plant and tools (inc site lighting)Taffs Well UTXTaffs Well UTX Drawing - TRAN01-KAW-R0-R2P-DDR-C-CV-000114 - 26082020.pdfStandard UTX Construction- Procurement of UTX Materials- Installation of Up Main Chamber- Installation of 9.150m 4 way duct crossing- Installation of Down Main Chamber- Installation of hardstanding's and handrail- Handback Engineer following each shift in the Track Support Zone- All plant and materials to complete the works (excluding RRV's)- Track monitoring shift following construction- 7 Days following construction in the first week- 2 days in the second week- 2 days in the third week- 1 day in the fourth week- Temporary works supervisor provision- Engineer provision- Setting out of snake grid coordinates- As-built production of UTX- Quality control - BIM360 checklists and sign offAdditional Information- Schedule of rates (produce list of competencies)- Mid week days- Mid week nights- Weekend days- Weekend nights- Bank Holidays- Welfare Van- Groundhog- List of all materials including rates- Cancellation notice period- Stand Down RatesAttendances- RRV's will be provided by BB- Temporary works provided by BB- BB/AIW to supply Main Welfare Accommodation- BB/AIW will provide Possession Management Staff- Supplier to provide all site labour including COSS/SWL- Supplier to ensure that COSS/SWL are to have digital tablets to use the digital epics system- Supplier to provide localised welfare as required- Supplier to provide all materials (inc water etc)- Supplier to provide all plant and tools (inc site lighting)"
}
]
}