Award

Solar PV and Battery Storage at Afon Taff School, Merthyr Vale

H FACTOR

This public procurement record has 2 releases in its history.

Summary of the contracting process

The buying organization H Factor has awarded the contract for a project titled "Solar PV and Battery Storage at Afon Taff School, Merthyr Vale" to Madola Energy Ltd. The procurement is in the works category and involves the retrofitting of a solar PV and energy storage system at Afon Taff School in Merthyr Tydfil. The project requires a 200 Kwp solar PV system, a 44kWh battery storage system, and compliance with various industry regulations and standards. The contract was signed on January 30, 2023, and the procurement process was in the award stage as of the most recent update on February 6, 2023.

This tender presents business growth opportunities for companies specializing in solar energy, solar installations, and battery storage systems. Businesses that are MCS accredited, comply with industry regulations and standards, and can provide ethically sourced solar panels are well-suited to compete. Successful bidders have the chance to contribute to cleaner air quality around the school, reduce energy costs, and carbon footprints, benefitting both the school and the local community in Merthyr Vale.

Find more tenders on our Open Data Platform.
How relevant is this notice?

D3 Tenders Premium

Win More Public Sector Contracts

AI-powered tender discovery, pipeline management, and market intelligence — everything you need to grow your public sector business.

Notice Title

Solar PV and Battery Storage at Afon Taff School, Merthyr Vale

Notice Description

Project to retro fit a Solar PV and energy storage system to Afon Taff School in Merthyr tydfil.Afon Taf High School, Yew Street, Troedyrhiw, Merthyr Tydfil. CF48 4EDBackgroundThe school has recently been refurbished, part of this process was the fitting of Alumasc Mastergold warm roofing system (membrane) to the buildings flat rooves, this is subject to a 25year guarantee.Renewable energy system requirements:Panel mountingThe new guaranteed Roof membrane means that a nonpenetrative ballasted solar panel mounting system must be used and this should include membrane compatible protection at all contact points with the roof and additionally a non-combustible layer is required between the array and roof surface (between the frames and under the panels - 20-40mm washed pebble blast or similar performing inorganic layer).Pre-construction, but post tender the appointed installation contractor will carry out a detailed structural survey for the system they intend to install, this will be used to confirm the structure is suitable for the installation and the cost should be included in the tender.Panels & PV systemThe Solar PV system should be 200 Kwp.The Panels must be ethically sourced from manufactures free from forced labour issues and ideally tier one Bloomberg classified.The panels should be IP68 rated and have a 12 year plus product warranty and a 25-year performance warranty on 84% of nominal power. The solarinstallation should include a 2-year workmanship warranty.The array will be subjected to DNO approval for its connection to the grid. Bidding contractors should allow for the cost to submit a G99 application to the DNO on behalf of the council for this purpose.The installation should include OFGEM approved generation meter and provision for an export meter.The system should include a monitoring system detailing the solar generation, the export along with the energy stored and used from the battery array.The design and installation will comply with the following:Latest UK Building RegulationsLatest European and UK standards and codes of practiceLatest industry recognised guidelines, including:o Engineering Recommendations G99o BS 7671 (current edition) - Requirements for electrical installations (all parts, but in particular Part 7-712 Requirements for special installations or locations - Solar photovoltaic (PV) power supply systems)o BS EN 62446 (current edition) - Grid connected photovoltaic systems - Minimum requirements for system documentation, commissioning tests and inspectiono IEC 60364 Low Voltage Electric Installationso IEC 60755 General requirements for residual current operated protective deviceso EC 61215 Crystalline moduleso IEC 61730 - Photovoltaic (PV) module safety qualificationo IEC 61557 Electrical safety in low voltage distribution systemoperating manuals for the system must be providedA fire isolation switch should be located externally to each building where PV panels are installed.The proposal must include structural engineering verification that the roof structure is suitable for Solar PV.Safe access for maintenance of the system must be considered in the proposal and the PV array must be designed with a minimum edge gap of 1.2M to the perimeter of the roof.Battery storage systemThe system should include a 44kWh battery capable of 90% depth of discharge, 97% charging efficiency and a 10 year warranty - the battery must be located in dedicated, suitable containment exterior to the main buildings that is sterile and fire resistant. Measures must be taken to ensure the battery cannot operate and temperatures that could be detrimental to its life or performance.Provision of a visual performance interfaceA user / pupil interface should be included with the system to display the system performance and benefits - a creative proposal for this interface rather than a dull display will be looked on favourably.

Publication & Lifecycle

Open Contracting ID
ocds-kuma6s-126505
Publication Source
Sell2Wales
Latest Notice
https://www.sell2wales.gov.wales/search/search_switch.aspx?ID=126505
Current Stage
Award
All Stages
Tender, Award

Procurement Classification

Notice Type
S2W Notice - Website Contract Award Notice
Procurement Type
Standard
Procurement Category
Works
Procurement Method
Open
Procurement Method Details
Not specified
Tender Suitability
Not specified
Awardee Scale
Not specified

Common Procurement Vocabulary (CPV)

CPV Divisions

09 - Petroleum products, fuel, electricity and other sources of energy

31 - Electrical machinery, apparatus, equipment and consumables; lighting


CPV Codes

09330000 - Solar energy

09331200 - Solar photovoltaic modules

09332000 - Solar installation

31422000 - Battery packs

Notice Value(s)

Tender Value
Not specified
Lots Value
Not specified
Awards Value
Not specified
Contracts Value
Not specified

Notice Dates

Publication Date
6 Feb 20233 years ago
Submission Deadline
5 Dec 2022Expired
Future Notice Date
Not specified
Award Date
30 Jan 20233 years ago
Contract Period
Not specified - Not specified
Recurrence
Not specified

Notice Status

Tender Status
Not Specified
Lots Status
Not Specified
Awards Status
Not Specified
Contracts Status
Active

Contracting Authority (Buyer)

Main Buyer
H FACTOR
Contact Name
Simon Conway, keith baker
Contact Email
spfconway@gmail.com
Contact Phone
+44 7496843652, +44 7730833111

Buyer Location

Locality
TREHARRIS
Postcode
CF46 5BS
Post Town
Cardiff
Country
Wales

Major Region (ITL 1)
TLL Wales
Basic Region (ITL 2)
TLL5 South East Wales
Small Region (ITL 3)
TLL51 Central Valleys and Bridgend
Delivery Location
Not specified

Local Authority
Merthyr Tydfil
Electoral Ward
Treharris
Westminster Constituency
Merthyr Tydfil and Aberdare

Supplier Information

Number of Suppliers
1
Supplier Name

MADOLA ENERGY

Open Contracting Data Standard (OCDS)

View full OCDS Record for this contracting process

Download

The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.

{
    "tag": [
        "compiled"
    ],
    "id": "ocds-kuma6s-126505-2023-02-06T08:44:21Z",
    "date": "2023-02-06T08:44:21Z",
    "ocid": "ocds-kuma6s-126505",
    "initiationType": "tender",
    "parties": [
        {
            "id": "org-68",
            "name": "H Factor",
            "address": {
                "streetAddress": "Penwaungoch, Pentwyn road,",
                "locality": "Treharris",
                "postalCode": "CF46 5BS"
            },
            "contactPoint": {
                "name": "Simon Conway",
                "email": "spfconway@gmail.com",
                "telephone": "+44 7496843652",
                "url": "http://"
            },
            "roles": [
                "buyer"
            ],
            "details": {
                "classifications": [
                    {
                        "id": "EU_INSTITUTION",
                        "description": "European institution/agency or international organisation",
                        "scheme": "TED_CA_TYPE"
                    }
                ]
            }
        },
        {
            "id": "org-46",
            "name": "H Factor",
            "address": {
                "streetAddress": "Penwaungoch, Pentwyn road,",
                "locality": "Treharris",
                "postalCode": "CF46 5BS"
            },
            "contactPoint": {
                "name": "keith baker",
                "telephone": "+44 7730833111"
            },
            "roles": [
                "buyer"
            ]
        },
        {
            "id": "org-159",
            "name": "Madola Energy Ltd",
            "address": {
                "streetAddress": "Unit 11-12 Geith Works, Crown Business Park,",
                "locality": "Tredegar",
                "postalCode": "NP224EF"
            },
            "contactPoint": {
                "url": "https://www.madolaenergy.com"
            },
            "roles": [
                "supplier"
            ]
        }
    ],
    "buyer": {
        "name": "H Factor",
        "id": "org-46"
    },
    "tender": {
        "id": "ocds-kuma6s-126505-tender-128832",
        "title": "Solar PV and Battery Storage at Afon Taff School, Merthyr Vale",
        "description": "Project to retro fit a Solar PV and energy storage system to Afon Taff School in Merthyr tydfil.Afon Taf High School, Yew Street, Troedyrhiw, Merthyr Tydfil. CF48 4EDBackgroundThe school has recently been refurbished, part of this process was the fitting of Alumasc Mastergold warm roofing system (membrane) to the buildings flat rooves, this is subject to a 25year guarantee.Renewable energy system requirements:Panel mountingThe new guaranteed Roof membrane means that a nonpenetrative ballasted solar panel mounting system must be used and this should include membrane compatible protection at all contact points with the roof and additionally a non-combustible layer is required between the array and roof surface (between the frames and under the panels - 20-40mm washed pebble blast or similar performing inorganic layer).Pre-construction, but post tender the appointed installation contractor will carry out a detailed structural survey for the system they intend to install, this will be used to confirm the structure is suitable for the installation and the cost should be included in the tender.Panels & PV systemThe Solar PV system should be 200 Kwp.The Panels must be ethically sourced from manufactures free from forced labour issues and ideally tier one Bloomberg classified.The panels should be IP68 rated and have a 12 year plus product warranty and a 25-year performance warranty on 84% of nominal power. The solarinstallation should include a 2-year workmanship warranty.The array will be subjected to DNO approval for its connection to the grid. Bidding contractors should allow for the cost to submit a G99 application to the DNO on behalf of the council for this purpose.The installation should include OFGEM approved generation meter and provision for an export meter.The system should include a monitoring system detailing the solar generation, the export along with the energy stored and used from the battery array.The design and installation will comply with the following:Latest UK Building RegulationsLatest European and UK standards and codes of practiceLatest industry recognised guidelines, including:o Engineering Recommendations G99o BS 7671 (current edition) - Requirements for electrical installations (all parts, but in particular Part 7-712 Requirements for special installations or locations - Solar photovoltaic (PV) power supply systems)o BS EN 62446 (current edition) - Grid connected photovoltaic systems - Minimum requirements for system documentation, commissioning tests and inspectiono IEC 60364 Low Voltage Electric Installationso IEC 60755 General requirements for residual current operated protective deviceso EC 61215 Crystalline moduleso IEC 61730 - Photovoltaic (PV) module safety qualificationo IEC 61557 Electrical safety in low voltage distribution systemoperating manuals for the system must be providedA fire isolation switch should be located externally to each building where PV panels are installed.The proposal must include structural engineering verification that the roof structure is suitable for Solar PV.Safe access for maintenance of the system must be considered in the proposal and the PV array must be designed with a minimum edge gap of 1.2M to the perimeter of the roof.Battery storage systemThe system should include a 44kWh battery capable of 90% depth of discharge, 97% charging efficiency and a 10 year warranty - the battery must be located in dedicated, suitable containment exterior to the main buildings that is sterile and fire resistant. Measures must be taken to ensure the battery cannot operate and temperatures that could be detrimental to its life or performance.Provision of a visual performance interfaceA user / pupil interface should be included with the system to display the system performance and benefits - a creative proposal for this interface rather than a dull display will be looked on favourably.",
        "procurementMethod": "open",
        "mainProcurementCategory": "works",
        "tenderPeriod": {
            "endDate": "2022-12-05T12:00:00Z"
        },
        "eligibilityCriteria": "System must be MCS accredited and installer must provide all documentation facilitate export of electricity to the grid.",
        "awardPeriod": {
            "endDate": "2022-12-07T00:00:00Z"
        },
        "communication": {
            "atypicalToolUrl": "https://sell2wales.gov.wales"
        },
        "additionalClassifications": [
            {
                "id": "09330000",
                "description": "Solar energy",
                "scheme": "CPV"
            },
            {
                "id": "09331200",
                "description": "Solar photovoltaic modules",
                "scheme": "CPV"
            },
            {
                "id": "09332000",
                "description": "Solar installation",
                "scheme": "CPV"
            },
            {
                "id": "31422000",
                "description": "Battery packs",
                "scheme": "CPV"
            }
        ]
    },
    "noticetype": "S2W Notice - Website Contract Award Notice",
    "awards": [
        {
            "id": "ocds-kuma6s-126505-award-128832-126",
            "suppliers": [
                {
                    "id": "org-159",
                    "name": "Madola Energy Ltd"
                }
            ],
            "items": [
                {
                    "id": "ocds-kuma6s-126505-awarditem-128832-126"
                }
            ]
        }
    ],
    "contracts": [
        {
            "id": "ocds-kuma6s-126505-award-128832-126",
            "awardID": "ocds-kuma6s-126505-award-128832-126",
            "status": "active",
            "dateSigned": "2023-01-30T00:00:00Z"
        }
    ],
    "bids": {
        "statistics": [
            {
                "id": "ocds-kuma6s-126505-bidsstatistic-128832-126",
                "measure": "bids",
                "value": 4
            }
        ]
    }
}