Notice Information
Notice Title
Construction works for the Advanced Manufacturing and Innovation District Scotland South (AMIDS South)
Notice Description
The Advanced Manufacturing Innovation District Scotland (AMIDS) South plays a key role in completing Renfrewshire Council's proposed network of infrastructure projects by connecting the town of Paisley (population, circa 77,000), the largest local settlement, by all modes to AMIDS some 3km distance from the town centre and other nearby settlements of Renfrew and Inchinnan (and beyond) and providing direct links to existing and planned active travel routes (ATR). The over-arching AMIDS South project objectives are: Stimulation of increased economy and development activity in Paisley and the wider area, Attract and retain an increased working age population in the local area, Improve strategic, gateway and local access connections and perceptions between: Paisley Town Centre, Paisley Gilmour Street, AMIDS, /Glasgow Airport and the neighbouring communities. Improve integration of the area and key institutions (such as West College Scotland): north and south of Paisley Gilmour Street and east and west of the White Cart and Capture the benefits of major infrastructure improvements and associated development for Paisley Town Centre, Paisley, Renfrewshire and reinforce the value of planned investment at AMIDS. The AMIDS south project will provide new and more direct links to the proposed new Secondary School and Community Campus for the communities west of the White Cart Water. The proposed works for AMIDS South construction comprise: Upgrade and widening of approximately 1.7km existing road including new road infrastructure - North to South Route including new sewer structure, Upgrade of existing retaining walls for riverbank retention work at east-bank of White Cart Water, Construction of a new 93-meter span steel arch bridge over the White Cart Water and Construction of a new offline road over 550m - East to West Route. For details refer to drawing numbers: AMIDSS-AMEY-HGN-DR-CH-000002 to 000004 - General Arrangements Main components are summarised in Appendix 1 - Statement of Requirements and "AMIDSS Scope Part 1 - Final - Stage 1" as contained in the Suppliers Attachment Area. General information on the Project can be found here: Paisley to AMIDS transport links - Renfrewshire Website
Lot Information
Lot 1
The AMIDS South construction works contract is intended to be in the form of an NEC4 Engineering and Construction Contract Option A Fixed Priced Contract with an Activity Schedule including X optional and Z additional and amended clauses. The works are primarily Employer's design with Contractor's Design Portions. In the event the Council requires to enter into negotiation to improve tenders, the Council may consider including additional elements of Contractor's Design such as the White Cart Crossing bridge. The construction programme is anticipated to be 24 months with a 24 months defects period. There will be a key date for completion of the works contained in Zone X which includes the pedestrian and vehicular access for the new Paisley Grammar School Campus by 30 May 2026. Planning consent for the project is in place and the Contractor will be directly responsible for discharging a number of planning consent conditions as detailed in the Scope. The proposed works for AMIDS South construction comprise: Upgrade and widening of approximately 1.7km existing road including new road infrastructure - North to South Route including new sewer structure, Upgrade of existing retaining walls for riverbank retention work at east-bank of White Cart Water, Construction of a new 93-meter span steel arch bridge over the White Cart Water and Construction of a new offline road over 550m - East to West Route. Full details of the works can be found in the document titled "AMIDSS Scope Part 1 - Final - Stage 1". The draft conditions of contract are included with the ITP documents. These may be subject to change as the scope, drawings and specifications for the work are finalised. Final versions will be published in the ITT. Further information on the negotiation process will be provided to Bidders selected to submit a tender in the initial ITT.. The Council is conducting the procurement process under the competitive procedure with negotiation in accordance with the Public Contracts (Scotland) Regulations 2015 and the Council's Standing Orders Relating to Contracts. The SPD Information and Instructions, contained in the Suppliers Attachment Area on the PCS-Tender System, provides Bidders with detailed information on the Project.
Options: The Council intends to procure the Gallowhill Cycle Link as part of a separate procurement process, however reserves the right to instruct this as a variation to the scope for this contract or award directly to the appointed contractor subject to Council assessment of best value.
Renewal: Extensions of time as permitted by the conditions of contract
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-r6ebe6-0000761193
- Publication Source
- Public Contracts Scotland
- Latest Notice
- https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=AUG537831
- Current Stage
- Award
- All Stages
- Tender, Award
Procurement Classification
- Notice Type
- OJEU - F3 - Contract Award Notice
- Procurement Type
- Standard
- Procurement Category
- Works
- Procurement Method
- Selective
- Procurement Method Details
- Competitive procedure with negotiation
- Tender Suitability
- Not specified
- Awardee Scale
- Large
Common Procurement Vocabulary (CPV)
- CPV Divisions
44 - Construction structures and materials; auxiliary products to construction (except electric apparatus)
45 - Construction work
71 - Architectural, construction, engineering and inspection services
-
- CPV Codes
44212100 - Bridge
45112730 - Landscaping work for roads and motorways
45220000 - Engineering works and construction works
45221000 - Construction work for bridges and tunnels, shafts and subways
45221100 - Construction work for bridges
45221111 - Road bridge construction work
45233000 - Construction, foundation and surface works for highways, roads
45233100 - Construction work for highways, roads
45233120 - Road construction works
45233121 - Main road construction works
45233123 - Secondary road construction work
45233125 - Road junction construction work
45233220 - Surface work for roads
45233221 - Road-surface painting work
45233290 - Installation of road signs
45233294 - Installation of road signals
45233300 - Foundation work for highways, roads, streets and footpaths
45233320 - Foundation work for roads
45316110 - Installation of road lighting equipment
71300000 - Engineering services
71311000 - Civil engineering consultancy services
71311100 - Civil engineering support services
71312000 - Structural engineering consultancy services
71320000 - Engineering design services
71322000 - Engineering design services for the construction of civil engineering works
Notice Value(s)
- Tender Value
- £25,500,000 £10M-£100M
- Lots Value
- £25,500,000 £10M-£100M
- Awards Value
- Not specified
- Contracts Value
- £34,714,649 £10M-£100M
Notice Dates
- Publication Date
- 27 Aug 20256 months ago
- Submission Deadline
- 29 Apr 2024Expired
- Future Notice Date
- Not specified
- Award Date
- 14 Aug 20256 months ago
- Contract Period
- 5 Mar 2025 - 29 May 2027 2-3 years
- Recurrence
- Not specified
Notice Status
- Tender Status
- Complete
- Lots Status
- Complete
- Awards Status
- Not Specified
- Contracts Status
- Active
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- RENFREWSHIRE COUNCIL
- Contact Name
- Rebecca Park
- Contact Email
- rebecca.park@renfrewshire.gov.uk
- Contact Phone
- +44 3003000300
Buyer Location
- Locality
- PAISLEY
- Postcode
- PA1 1JD
- Post Town
- Paisley
- Country
- Scotland
-
- Major Region (ITL 1)
- TLM Scotland
- Basic Region (ITL 2)
- TLM3 West Central Scotland
- Small Region (ITL 3)
- TLM33 Inverclyde, East Renfrewshire, and Renfrewshire
- Delivery Location
- TLM83 Inverclyde, East Renfrewshire, and Renfrewshire
-
- Local Authority
- Renfrewshire
- Electoral Ward
- Paisley East and Central
- Westminster Constituency
- Paisley and Renfrewshire South
Further Information
Notice Documents
-
https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=MAR501862
Construction works for the Advanced Manufacturing and Innovation District Scotland South (AMIDS South) - The Advanced Manufacturing Innovation District Scotland (AMIDS) South plays a key role in completing Renfrewshire Council's proposed network of infrastructure projects by connecting the town of Paisley (population, circa 77,000), the largest local settlement, by all modes to AMIDS some 3km distance from the town centre and other nearby settlements of Renfrew and Inchinnan (and beyond) and providing direct links to existing and planned active travel routes (ATR). The over-arching AMIDS South project objectives are: Stimulation of increased economy and development activity in Paisley and the wider area, Attract and retain an increased working age population in the local area, Improve strategic, gateway and local access connections and perceptions between: Paisley Town Centre, Paisley Gilmour Street, AMIDS, /Glasgow Airport and the neighbouring communities. Improve integration of the area and key institutions (such as West College Scotland): north and south of Paisley Gilmour Street and east and west of the White Cart and Capture the benefits of major infrastructure improvements and associated development for Paisley Town Centre, Paisley, Renfrewshire and reinforce the value of planned investment at AMIDS. The AMIDS south project will provide new and more direct links to the proposed new Secondary School and Community Campus for the communities west of the White Cart Water. The proposed works for AMIDS South construction comprise: Upgrade and widening of approximately 1.7km existing road including new road infrastructure - North to South Route including new sewer structure, Upgrade of existing retaining walls for riverbank retention work at east-bank of White Cart Water, Construction of a new 93-meter span steel arch bridge over the White Cart Water and Construction of a new offline road over 550m - East to West Route. For details refer to drawing numbers: AMIDSS-AMEY-HGN-DR-CH-000002 to 000004 - General Arrangements Main components are summarised in Appendix 1 - Statement of Requirements and "AMIDSS Scope Part 1 - Final - Stage 1" as contained in the Suppliers Attachment Area. General information on the Project can be found here: Paisley to AMIDS transport links - Renfrewshire Website -
https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=AUG537831
Construction works for the Advanced Manufacturing and Innovation District Scotland South (AMIDS South) - The Advanced Manufacturing Innovation District Scotland (AMIDS) South plays a key role in completing Renfrewshire Council's proposed network of infrastructure projects by connecting the town of Paisley (population, circa 77,000), the largest local settlement, by all modes to AMIDS some 3km distance from the town centre and other nearby settlements of Renfrew and Inchinnan (and beyond) and providing direct links to existing and planned active travel routes (ATR). The over-arching AMIDS South project objectives are: Stimulation of increased economy and development activity in Paisley and the wider area, Attract and retain an increased working age population in the local area, Improve strategic, gateway and local access connections and perceptions between: Paisley Town Centre, Paisley Gilmour Street, AMIDS, /Glasgow Airport and the neighbouring communities. Improve integration of the area and key institutions (such as West College Scotland): north and south of Paisley Gilmour Street and east and west of the White Cart and Capture the benefits of major infrastructure improvements and associated development for Paisley Town Centre, Paisley, Renfrewshire and reinforce the value of planned investment at AMIDS. The AMIDS south project will provide new and more direct links to the proposed new Secondary School and Community Campus for the communities west of the White Cart Water. The proposed works for AMIDS South construction comprise: Upgrade and widening of approximately 1.7km existing road including new road infrastructure - North to South Route including new sewer structure, Upgrade of existing retaining walls for riverbank retention work at east-bank of White Cart Water, Construction of a new 93-meter span steel arch bridge over the White Cart Water and Construction of a new offline road over 550m - East to West Route. For details refer to drawing numbers: AMIDSS-AMEY-HGN-DR-CH-000002 to 000004 - General Arrangements Main components are summarised in Appendix 1 - Statement of Requirements and "AMIDSS Scope Part 1 - Final - Stage 1" as contained in the Suppliers Attachment Area. General information on the Project can be found here: Paisley to AMIDS transport links - Renfrewshire Website
Open Contracting Data Standard (OCDS)
View full OCDS Record for this contracting process
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.
{
"tag": [
"compiled"
],
"id": "ocds-r6ebe6-0000761193-2025-08-27T00:00:00Z",
"date": "2025-08-27T00:00:00Z",
"ocid": "ocds-r6ebe6-0000761193",
"initiationType": "tender",
"parties": [
{
"id": "org-30",
"name": "Renfrewshire Council",
"identifier": {
"legalName": "Renfrewshire Council"
},
"address": {
"streetAddress": "Renfrewshire House",
"locality": "Paisley",
"region": "UKM83",
"postalCode": "PA1 1JD"
},
"contactPoint": {
"name": "Rebecca Park",
"email": "rebecca.park@renfrewshire.gov.uk",
"telephone": "+44 3003000300",
"url": "https://www.publictendersscotland.publiccontractsscotland.gov.uk"
},
"roles": [
"buyer"
],
"details": {
"classifications": [
{
"id": "Regional or local authority",
"scheme": "TED_CA_TYPE"
},
{
"id": "01",
"description": "General public services",
"scheme": "COFOG"
}
],
"url": "http://www.renfrewshire.gov.uk"
}
},
{
"id": "org-31",
"name": "Refer to Section VI.4.3",
"identifier": {
"legalName": "Refer to Section VI.4.3"
},
"address": {
"locality": "Refer to Section VI.4.3"
},
"contactPoint": {
"url": "http://"
},
"roles": [
"reviewBody"
]
},
{
"id": "org-13",
"name": "Court of Session",
"identifier": {
"legalName": "Court of Session"
},
"address": {
"streetAddress": "Parliament House, Parliament Square",
"locality": "Edinburgh",
"postalCode": "EH1 1RQ"
},
"contactPoint": {
"url": "http://"
},
"roles": [
"reviewBody",
"reviewContactPoint"
]
},
{
"id": "org-35",
"name": "Renfrewshire Council",
"identifier": {
"legalName": "Renfrewshire Council"
},
"address": {
"streetAddress": "Renfrewshire House",
"locality": "Paisley",
"region": "UKM83",
"postalCode": "PA1 1JD"
},
"contactPoint": {
"name": "Rebecca Park",
"email": "rebecca.park@renfrewshire.gov.uk",
"telephone": "+44 3003000300",
"url": "http://"
},
"roles": [
"buyer"
],
"details": {
"classifications": [
{
"id": "Regional or local authority",
"scheme": "TED_CA_TYPE"
},
{
"id": "01",
"description": "General public services",
"scheme": "COFOG"
}
],
"url": "http://www.renfrewshire.gov.uk"
}
},
{
"id": "org-36",
"name": "Farrans Construction trading as a division of Northstone (NI) Limited",
"identifier": {
"legalName": "Farrans Construction trading as a division of Northstone (NI) Limited"
},
"address": {
"streetAddress": "99 Kingsway",
"locality": "Belfast",
"region": "UKN0",
"postalCode": "BT17 9NU"
},
"contactPoint": {
"telephone": "+44 2890551300"
},
"roles": [
"supplier"
],
"details": {
"scale": "large",
"url": "http://"
}
},
{
"id": "org-37",
"name": "Refer to Section VI.4.3",
"identifier": {
"legalName": "Refer to Section VI.4.3"
},
"address": {
"locality": "Refer to Section VI.4.3"
},
"contactPoint": {
"url": "http://"
},
"roles": [
"reviewBody"
]
},
{
"id": "org-38",
"name": "Court of Session",
"identifier": {
"legalName": "Court of Session"
},
"address": {
"streetAddress": "Parliament Square",
"locality": "Edinburgh",
"postalCode": "EH1 1RQ"
},
"contactPoint": {
"url": "http://"
},
"roles": [
"reviewContactPoint",
"reviewBody"
]
}
],
"buyer": {
"name": "Renfrewshire Council",
"id": "org-35"
},
"tender": {
"id": "RC-CPU-22-352",
"title": "Construction works for the Advanced Manufacturing and Innovation District Scotland South (AMIDS South)",
"description": "The Advanced Manufacturing Innovation District Scotland (AMIDS) South plays a key role in completing Renfrewshire Council's proposed network of infrastructure projects by connecting the town of Paisley (population, circa 77,000), the largest local settlement, by all modes to AMIDS some 3km distance from the town centre and other nearby settlements of Renfrew and Inchinnan (and beyond) and providing direct links to existing and planned active travel routes (ATR). The over-arching AMIDS South project objectives are: Stimulation of increased economy and development activity in Paisley and the wider area, Attract and retain an increased working age population in the local area, Improve strategic, gateway and local access connections and perceptions between: Paisley Town Centre, Paisley Gilmour Street, AMIDS, /Glasgow Airport and the neighbouring communities. Improve integration of the area and key institutions (such as West College Scotland): north and south of Paisley Gilmour Street and east and west of the White Cart and Capture the benefits of major infrastructure improvements and associated development for Paisley Town Centre, Paisley, Renfrewshire and reinforce the value of planned investment at AMIDS. The AMIDS south project will provide new and more direct links to the proposed new Secondary School and Community Campus for the communities west of the White Cart Water. The proposed works for AMIDS South construction comprise: Upgrade and widening of approximately 1.7km existing road including new road infrastructure - North to South Route including new sewer structure, Upgrade of existing retaining walls for riverbank retention work at east-bank of White Cart Water, Construction of a new 93-meter span steel arch bridge over the White Cart Water and Construction of a new offline road over 550m - East to West Route. For details refer to drawing numbers: AMIDSS-AMEY-HGN-DR-CH-000002 to 000004 - General Arrangements Main components are summarised in Appendix 1 - Statement of Requirements and \"AMIDSS Scope Part 1 - Final - Stage 1\" as contained in the Suppliers Attachment Area. General information on the Project can be found here: Paisley to AMIDS transport links - Renfrewshire Website",
"status": "complete",
"items": [
{
"id": "1",
"additionalClassifications": [
{
"id": "45112730",
"scheme": "CPV"
},
{
"id": "45221111",
"scheme": "CPV"
},
{
"id": "45233000",
"scheme": "CPV"
},
{
"id": "45233100",
"scheme": "CPV"
},
{
"id": "45233120",
"scheme": "CPV"
},
{
"id": "45233121",
"scheme": "CPV"
},
{
"id": "45233123",
"scheme": "CPV"
},
{
"id": "45233125",
"scheme": "CPV"
},
{
"id": "45233220",
"scheme": "CPV"
},
{
"id": "45233221",
"scheme": "CPV"
},
{
"id": "45233300",
"scheme": "CPV"
},
{
"id": "45233320",
"scheme": "CPV"
},
{
"id": "45316110",
"scheme": "CPV"
},
{
"id": "45233294",
"scheme": "CPV"
},
{
"id": "45233290",
"scheme": "CPV"
},
{
"id": "71322000",
"scheme": "CPV"
},
{
"id": "71311100",
"scheme": "CPV"
},
{
"id": "71311000",
"scheme": "CPV"
},
{
"id": "71300000",
"scheme": "CPV"
},
{
"id": "71312000",
"scheme": "CPV"
},
{
"id": "71320000",
"scheme": "CPV"
},
{
"id": "44212100",
"scheme": "CPV"
},
{
"id": "45221000",
"scheme": "CPV"
},
{
"id": "45221100",
"scheme": "CPV"
}
],
"deliveryLocation": {
"description": "Paisley"
},
"deliveryAddresses": [
{
"region": "UKM83"
},
{
"region": "UKM83"
}
],
"relatedLot": "1"
}
],
"value": {
"amount": 25500000,
"currency": "GBP"
},
"procurementMethod": "selective",
"procurementMethodDetails": "Competitive procedure with negotiation",
"mainProcurementCategory": "works",
"submissionMethod": [
"electronicSubmission"
],
"submissionMethodDetails": "https://www.publictendersscotland.publiccontractsscotland.gov.uk",
"tenderPeriod": {
"endDate": "2024-04-29T12:00:00Z"
},
"documents": [
{
"id": "MAR501862",
"documentType": "contractNotice",
"title": "Construction works for the Advanced Manufacturing and Innovation District Scotland South (AMIDS South)",
"description": "The Advanced Manufacturing Innovation District Scotland (AMIDS) South plays a key role in completing Renfrewshire Council's proposed network of infrastructure projects by connecting the town of Paisley (population, circa 77,000), the largest local settlement, by all modes to AMIDS some 3km distance from the town centre and other nearby settlements of Renfrew and Inchinnan (and beyond) and providing direct links to existing and planned active travel routes (ATR). The over-arching AMIDS South project objectives are: Stimulation of increased economy and development activity in Paisley and the wider area, Attract and retain an increased working age population in the local area, Improve strategic, gateway and local access connections and perceptions between: Paisley Town Centre, Paisley Gilmour Street, AMIDS, /Glasgow Airport and the neighbouring communities. Improve integration of the area and key institutions (such as West College Scotland): north and south of Paisley Gilmour Street and east and west of the White Cart and Capture the benefits of major infrastructure improvements and associated development for Paisley Town Centre, Paisley, Renfrewshire and reinforce the value of planned investment at AMIDS. The AMIDS south project will provide new and more direct links to the proposed new Secondary School and Community Campus for the communities west of the White Cart Water. The proposed works for AMIDS South construction comprise: Upgrade and widening of approximately 1.7km existing road including new road infrastructure - North to South Route including new sewer structure, Upgrade of existing retaining walls for riverbank retention work at east-bank of White Cart Water, Construction of a new 93-meter span steel arch bridge over the White Cart Water and Construction of a new offline road over 550m - East to West Route. For details refer to drawing numbers: AMIDSS-AMEY-HGN-DR-CH-000002 to 000004 - General Arrangements Main components are summarised in Appendix 1 - Statement of Requirements and \"AMIDSS Scope Part 1 - Final - Stage 1\" as contained in the Suppliers Attachment Area. General information on the Project can be found here: Paisley to AMIDS transport links - Renfrewshire Website",
"url": "https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=MAR501862",
"format": "text/html"
},
{
"id": "AUG537831",
"documentType": "awardNotice",
"title": "Construction works for the Advanced Manufacturing and Innovation District Scotland South (AMIDS South)",
"description": "The Advanced Manufacturing Innovation District Scotland (AMIDS) South plays a key role in completing Renfrewshire Council's proposed network of infrastructure projects by connecting the town of Paisley (population, circa 77,000), the largest local settlement, by all modes to AMIDS some 3km distance from the town centre and other nearby settlements of Renfrew and Inchinnan (and beyond) and providing direct links to existing and planned active travel routes (ATR). The over-arching AMIDS South project objectives are: Stimulation of increased economy and development activity in Paisley and the wider area, Attract and retain an increased working age population in the local area, Improve strategic, gateway and local access connections and perceptions between: Paisley Town Centre, Paisley Gilmour Street, AMIDS, /Glasgow Airport and the neighbouring communities. Improve integration of the area and key institutions (such as West College Scotland): north and south of Paisley Gilmour Street and east and west of the White Cart and Capture the benefits of major infrastructure improvements and associated development for Paisley Town Centre, Paisley, Renfrewshire and reinforce the value of planned investment at AMIDS. The AMIDS south project will provide new and more direct links to the proposed new Secondary School and Community Campus for the communities west of the White Cart Water. The proposed works for AMIDS South construction comprise: Upgrade and widening of approximately 1.7km existing road including new road infrastructure - North to South Route including new sewer structure, Upgrade of existing retaining walls for riverbank retention work at east-bank of White Cart Water, Construction of a new 93-meter span steel arch bridge over the White Cart Water and Construction of a new offline road over 550m - East to West Route. For details refer to drawing numbers: AMIDSS-AMEY-HGN-DR-CH-000002 to 000004 - General Arrangements Main components are summarised in Appendix 1 - Statement of Requirements and \"AMIDSS Scope Part 1 - Final - Stage 1\" as contained in the Suppliers Attachment Area. General information on the Project can be found here: Paisley to AMIDS transport links - Renfrewshire Website",
"url": "https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=AUG537831",
"format": "text/html"
}
],
"lots": [
{
"id": "1",
"description": "The AMIDS South construction works contract is intended to be in the form of an NEC4 Engineering and Construction Contract Option A Fixed Priced Contract with an Activity Schedule including X optional and Z additional and amended clauses. The works are primarily Employer's design with Contractor's Design Portions. In the event the Council requires to enter into negotiation to improve tenders, the Council may consider including additional elements of Contractor's Design such as the White Cart Crossing bridge. The construction programme is anticipated to be 24 months with a 24 months defects period. There will be a key date for completion of the works contained in Zone X which includes the pedestrian and vehicular access for the new Paisley Grammar School Campus by 30 May 2026. Planning consent for the project is in place and the Contractor will be directly responsible for discharging a number of planning consent conditions as detailed in the Scope. The proposed works for AMIDS South construction comprise: Upgrade and widening of approximately 1.7km existing road including new road infrastructure - North to South Route including new sewer structure, Upgrade of existing retaining walls for riverbank retention work at east-bank of White Cart Water, Construction of a new 93-meter span steel arch bridge over the White Cart Water and Construction of a new offline road over 550m - East to West Route. Full details of the works can be found in the document titled \"AMIDSS Scope Part 1 - Final - Stage 1\". The draft conditions of contract are included with the ITP documents. These may be subject to change as the scope, drawings and specifications for the work are finalised. Final versions will be published in the ITT. Further information on the negotiation process will be provided to Bidders selected to submit a tender in the initial ITT.. The Council is conducting the procurement process under the competitive procedure with negotiation in accordance with the Public Contracts (Scotland) Regulations 2015 and the Council's Standing Orders Relating to Contracts. The SPD Information and Instructions, contained in the Suppliers Attachment Area on the PCS-Tender System, provides Bidders with detailed information on the Project.",
"status": "complete",
"value": {
"amount": 25500000,
"currency": "GBP"
},
"awardCriteria": {
"criteria": [
{
"type": "quality",
"name": "Quality",
"description": "40"
},
{
"type": "price",
"description": "60"
}
]
},
"options": {
"description": "The Council intends to procure the Gallowhill Cycle Link as part of a separate procurement process, however reserves the right to instruct this as a variation to the scope for this contract or award directly to the appointed contractor subject to Council assessment of best value."
},
"hasOptions": true,
"secondStage": {
"minimumCandidates": 3,
"maximumCandidates": 3
},
"submissionTerms": {
"variantPolicy": "notAllowed"
},
"contractPeriod": {
"startDate": "2025-03-05T00:00:00Z",
"endDate": "2027-05-29T00:00:00Z"
},
"hasRenewal": true,
"renewal": {
"description": "Extensions of time as permitted by the conditions of contract"
}
}
],
"contractTerms": {
"hasElectronicPayment": true,
"hasElectronicOrdering": true,
"electronicInvoicingPolicy": "allowed",
"performanceTerms": "Will be detailed in the Procurement Documents and Conditions of Contract"
},
"coveredBy": [
"GPA"
],
"otherRequirements": {
"requiresStaffNamesAndQualifications": true
},
"secondStage": {
"successiveReduction": true,
"noNegotiationNecessary": true,
"invitationDate": "2024-05-15T00:00:00Z"
},
"selectionCriteria": {
"criteria": [
{
"type": "suitability",
"description": "The Bidder must be registered or enrolled in the relevant trade register kept in the Member State of its establishment (as described in Schedule 5 of Public Contracts (Scotland) Regulations 2015. Bidders may be assessed as a FAIL and be excluded from the competition if they fail to provide a response to this question."
},
{
"type": "economic",
"description": "Full details can be found in the SPD and the SPD Information and Instructions which can be accessed through the website referenced in section I.3 of this Contract Notice. At least one Consortium Member or Reliance Entity (e.g. parent company guarantor) must meet the minimum economic and financial standing selection criteria on behalf of the Consortium to pass. SPD 4B.1.1 Statement: Bidders will be required to have a general yearly turnover of a minimum of 50m GBP for the last 3 years. The average turnover stated shall be based upon the figures reported in the last 3 year's audited financial statements. Where, for any valid reason, the Bidder does not have 3 years' audited financial statements available, the Council may accept other forms of documentation which it considers acceptable as proof. SPD 4B.5 Statement: The bidder confirms they already have or can commit to obtain, prior to the commencement of the contract, the levels of insurance cover as follows: Professional Risk Indemnity Insurance = MINIMUM 10 MILLION GPB in the aggregate with one annual reinstatement OR MINIMUM 25 MILLION GBP in the aggregate Employer's (Compulsory) Liability Insurance = MINIMUM 10 MILLION GBP each and every claim Public Liability Insurance = MINIMUM 25 million GBP each and every claim (in the aggregate for products) Contract's All Risk Insurance = value of works +15% Motor Vehicle Insurance = Statutory THIRD-PARTY INSURANCE - MINIMUM 5 MILLION GBP each and every claim 4B.6 The Bidder (including all Consortium Members in a Consortium) have a Dun & Bradstreet Failure Score of 20 or above in order to demonstrate its financial strength and stability.",
"minimum": "Bidders will be required to have a general yearly turnover of a minimum of 50m GBP for the last 3 years. Bidder will require to evidence insurance cover to the levels specified. he Bidder (including all Consortium Members in a Consortium) will be required to have a Dun & Bradstreet Failure Score of 20 or above in order to demonstrate its financial strength and stability. Where the Bidder is not able to make such a declaration, provides full details of the relevant events alongside an explanation of the expected impact on the Bidder's economic and financial standing. Supporting evidence must be provided where available."
},
{
"type": "technical",
"description": "Full details can be found in the SPD and the SPD Information and Instructions which can be accessed through the website referenced in section I.3 of this Contract Notice. Where the Bidder is relying on the technical experience of a Consortium Member or Reliance Entity to meet the requirements of the Selection Criteria and/or Down Selection Criteria, the experience relied on must be consistent with the Consortium Member's or Reliance Entity's role under this Project. The Selection Criteria and the Down Selection Criteria will evaluate Bidders on the basis of: 4C.1.A - Project Delivery 4C.1.B - Contractor's Design Portion and Temporary Works Design 4C.1.C - Stakeholders on Major Infrastructure project 4C.1.D - Traffic and Pedestrian Management Urban Areas 4C.1.E - Undertaking works near major utility 4C.1.F - Undertaking works near quay wall 4C.4 - Supply Chain Management"
}
]
},
"submissionTerms": {
"languages": [
"en"
],
"bidValidityPeriod": {
"endDate": "2025-03-31T00:00:00Z"
}
},
"classification": {
"id": "45220000",
"scheme": "CPV"
},
"reviewDetails": "An economic operator that suffers or risks suffering, loss or damage attributable to breach of duty under the Public Contracts (Scotland) Regulations 2015 (SSI 2015/446, as amended) may bring proceedings in the Sheriff Court or the Court of Session in accordance with Regulation 88 of the 2015 Regulations.",
"hasRecurrence": false,
"legalBasis": {
"id": "32014L0024",
"scheme": "CELEX"
}
},
"language": "EN",
"relatedProcesses": [
{
"id": "1",
"relationship": [
"planning"
],
"scheme": "EU-OJ",
"identifier": "2024/S 000-009960"
}
],
"description": "Bidders should note that the Council is currently assembling the land required to construct the works. The Council has published 1 Compulsory Purchase Order (CPO) in relation to the land required and is in advanced discussions with the majority of landowners. The CPO ca be viewed here: Advanced Manufacturing Innovation District Scotland (AMIDS) South Compulsory Purchase Order 2023 - Renfrewshire Website Award of a contract as a result of this procurement exercise will be subject to the Council receiving confirmation of the CPO to allow for the acquisition of land required. An update on land assembly and land made available will be included with the ITT. Bidders should note that award of any contract as a result of this procurement process is subject to approval of the Full Business Case by the Levelling Up Fund and Council internal governance procedures. (SC Ref:808402)",
"links": [
{
"rel": "canonical",
"href": "https://api.publiccontractsscotland.gov.uk/v1/Notice?id=ocds-r6ebe6-0000761193"
},
{
"rel": "canonical",
"href": "https://api.publiccontractsscotland.gov.uk/v1/Notice?id=ocds-r6ebe6-0000761193"
}
],
"noticetype": "OJEU - F3 - Contract Award Notice",
"awards": [
{
"id": "RC-CPU-22-352",
"suppliers": [
{
"id": "org-36",
"name": "Farrans Construction trading as a division of Northstone (NI) Limited"
}
],
"relatedLots": [
"1"
],
"hasSubcontracting": true,
"subcontracting": {
"maximumPercentage": 0.6,
"minimumPercentage": 0.6
}
}
],
"contracts": [
{
"id": "RC-CPU-22-352",
"awardID": "RC-CPU-22-352",
"status": "active",
"value": {
"amount": 34714649.54,
"currency": "GBP"
},
"dateSigned": "2025-08-14T00:00:00Z"
}
],
"bids": {
"statistics": [
{
"id": "71",
"measure": "bids",
"value": 2,
"relatedLot": "1"
},
{
"id": "72",
"measure": "smeBids",
"value": 0,
"relatedLot": "1"
},
{
"id": "73",
"measure": "foreignBidsFromEU",
"value": 0,
"relatedLot": "1"
},
{
"id": "74",
"measure": "foreignBidsFromNonEU",
"value": 2,
"relatedLot": "1"
},
{
"id": "75",
"measure": "electronicBids",
"value": 2,
"relatedLot": "1"
}
]
}
}