Award

Construction of Red Smiddy to Erskine Active Travel Route Phases 4, 5 and 6

RENFREWSHIRE COUNCIL

This public procurement record has 2 releases in its history.

Summary of the contracting process

See notice for full details.

Find more tenders on our Open Data Platform.
How relevant is this notice?

D3 Tenders Premium

Win More Public Sector Contracts

AI-powered tender discovery, pipeline management, and market intelligence — everything you need to grow your public sector business.

Notice Title

Construction of Red Smiddy to Erskine Active Travel Route Phases 4, 5 and 6

Notice Description

Renfrewshire Council has appointed a single Contractor to undertake two contracts: 1. Phases 4 and 5 (contract reference RC-CPU-25-158)is for the construction of 1.4km of shared footway and cycleway from the end of the existing shared footway/cycleway on Greenock Road, round Red Smiddy Roundabout, north onto Southbar Road to Southholm Roundabout. There is an existing footway at Red Smiddy Roundabout which is widened, and new construction on Southbar Road. In places the existing carriageway is widened. 2. Phase 6 (contract reference RC-CPU-25-159) is for the construction of 0.616km of shared footway and cycleway from Southholm Roundabout to the overbridge on the A726 on the northbound verge. This will include the relocation of street lighting columns, road signs and installation of new drainage. The works will involve the construction of a ramp to create a connection to the existing footway overbridge over the A726. The Council has awarded both contracts for this project to one Contractor.

Lot Information

Lot 1

Renfrewshire Council has appointed a single Contractor to undertake two contracts: 1. Phases 4 and 5 (contract reference RC-CPU-25-158)is for the construction of 1.4km of shared footway and cycleway from the end of the existing shared footway/cycleway on Greenock Road, round Red Smiddy Roundabout, north onto Southbar Road to Southholm Roundabout. There is an existing footway at Red Smiddy Roundabout which is widened, and new construction on Southbar Road. In places the existing carriageway is widened. 2. Phase 6 (contract reference RC-CPU-25-159) is for the construction of 0.616km of shared footway and cycleway from Southholm Roundabout to the overbridge on the A726 on the northbound verge. This will include the relocation of street lighting columns, road signs and installation of new drainage. The works will involve the construction of a ramp to create a connection to the existing footway overbridge over the A726. The Council has awarded both contracts for this project to one Contractor.

Publication & Lifecycle

Open Contracting ID
ocds-r6ebe6-0000815289
Publication Source
Public Contracts Scotland
Latest Notice
https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=JAN546984
Current Stage
Award
All Stages
Tender, Award

Procurement Classification

Notice Type
PCS Notice - Website Contract Award Notice
Procurement Type
Standard
Procurement Category
Works
Procurement Method
Open
Procurement Method Details
Open procedure
Tender Suitability
Not specified
Awardee Scale
SME

Common Procurement Vocabulary (CPV)

CPV Divisions

45 - Construction work


CPV Codes

45000000 - Construction work

45233162 - Cycle path construction work

Notice Value(s)

Tender Value
Not specified
Lots Value
Not specified
Awards Value
Not specified
Contracts Value
£1,056,774 £1M-£10M

Notice Dates

Publication Date
12 Jan 20261 months ago
Submission Deadline
11 Dec 2025Expired
Future Notice Date
Not specified
Award Date
7 Jan 20261 months ago
Contract Period
Not specified - Not specified
Recurrence
Not specified

Notice Status

Tender Status
Complete
Lots Status
Complete
Awards Status
Not Specified
Contracts Status
Active

Contracting Authority (Buyer)

Main Buyer
RENFREWSHIRE COUNCIL
Contact Name
Rachel Anne Davison
Contact Email
brian.bradley@renfrewshire.gov.uk, rachel.davison@renfrewshire.gov.uk
Contact Phone
+44 3003000300

Buyer Location

Locality
PAISLEY
Postcode
PA1 1JB
Post Town
Paisley
Country
Scotland

Major Region (ITL 1)
TLM Scotland
Basic Region (ITL 2)
TLM3 West Central Scotland
Small Region (ITL 3)
TLM33 Inverclyde, East Renfrewshire, and Renfrewshire
Delivery Location
TLM83 Inverclyde, East Renfrewshire, and Renfrewshire

Local Authority
Renfrewshire
Electoral Ward
Paisley East and Central
Westminster Constituency
Paisley and Renfrewshire South

Supplier Information

Number of Suppliers
1
Supplier Name

JOHN MCGEADY

Further Information

Notice Documents

  • https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=NOV543514
    Construction of Red Smiddy to Erskine Active Travel Route Phases 4, 5 and 6 - Renfrewshire Council wishes to appoint a single Contractor to undertake two contracts: 1. Phases 4 and 5 will be for the construction of 1.4km of shared footway and cycleway from the end of the existing shared footway/cycleway on Greenock Road, round Red Smiddy Roundabout, north onto Southbar Road to Southholm Roundabout. There is an existing footway at Red Smiddy Roundabout which is widened, and new construction on Southbar Road. In places the existing carriageway is widened. 2. Phase 6 will be for the construction of 0.616km of shared footway and cycleway from Southholm Roundabout to the overbridge on the A726 on the northbound verge. This will include the relocation of street lighting columns, road signs and installation of new drainage. The works will involve the construction of a ramp to create a connection to the existing footway overbridge over the A726. The Council will award both contracts for this project to one Contractor.
  • https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=JAN546984
    Construction of Red Smiddy to Erskine Active Travel Route Phases 4, 5 and 6 - Renfrewshire Council has appointed a single Contractor to undertake two contracts: 1. Phases 4 and 5 (contract reference RC-CPU-25-158)is for the construction of 1.4km of shared footway and cycleway from the end of the existing shared footway/cycleway on Greenock Road, round Red Smiddy Roundabout, north onto Southbar Road to Southholm Roundabout. There is an existing footway at Red Smiddy Roundabout which is widened, and new construction on Southbar Road. In places the existing carriageway is widened. 2. Phase 6 (contract reference RC-CPU-25-159) is for the construction of 0.616km of shared footway and cycleway from Southholm Roundabout to the overbridge on the A726 on the northbound verge. This will include the relocation of street lighting columns, road signs and installation of new drainage. The works will involve the construction of a ramp to create a connection to the existing footway overbridge over the A726. The Council has awarded both contracts for this project to one Contractor.

Open Contracting Data Standard (OCDS)

View full OCDS Record for this contracting process

Download

The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.

{
    "tag": [
        "compiled"
    ],
    "id": "ocds-r6ebe6-0000815289-2026-01-12T00:00:00Z",
    "date": "2026-01-12T00:00:00Z",
    "ocid": "ocds-r6ebe6-0000815289",
    "initiationType": "tender",
    "parties": [
        {
            "id": "org-91",
            "name": "Renfrewshire Council",
            "identifier": {
                "legalName": "Renfrewshire Council"
            },
            "address": {
                "streetAddress": "Renfrewshire House, Cotton Street",
                "locality": "Paisley",
                "region": "UKM83",
                "postalCode": "PA1 1JB"
            },
            "contactPoint": {
                "email": "brian.bradley@renfrewshire.gov.uk",
                "telephone": "+44 3003000300",
                "url": "https://www.publictendersscotland.publiccontractsscotland.gov.uk/esop/pts-host/public/pts/web/login.html"
            },
            "roles": [
                "buyer"
            ],
            "details": {
                "classifications": [
                    {
                        "id": "Regional or local authority",
                        "scheme": "TED_CA_TYPE"
                    },
                    {
                        "id": "01",
                        "description": "General public services",
                        "scheme": "COFOG"
                    }
                ],
                "url": "http://www.renfrewshire.gov.uk"
            }
        },
        {
            "id": "org-43",
            "name": "Court of Session",
            "identifier": {
                "legalName": "Court of Session"
            },
            "address": {
                "locality": "Edinburgh"
            },
            "contactPoint": {
                "url": "http://"
            },
            "roles": [
                "reviewBody"
            ]
        },
        {
            "id": "org-80",
            "name": "Renfrewshire Council",
            "identifier": {
                "legalName": "Renfrewshire Council"
            },
            "address": {
                "streetAddress": "Renfrewshire House, Cotton Street",
                "locality": "Paisley",
                "region": "UKM83",
                "postalCode": "PA1 1JB"
            },
            "contactPoint": {
                "name": "Rachel Anne Davison",
                "email": "rachel.davison@renfrewshire.gov.uk",
                "telephone": "+44 3003000300",
                "url": "http://"
            },
            "roles": [
                "buyer"
            ],
            "details": {
                "classifications": [
                    {
                        "id": "Regional or local authority",
                        "scheme": "TED_CA_TYPE"
                    },
                    {
                        "id": "01",
                        "description": "General public services",
                        "scheme": "COFOG"
                    }
                ],
                "url": "http://www.renfrewshire.gov.uk"
            }
        },
        {
            "id": "org-129",
            "name": "John McGeady Ltd",
            "identifier": {
                "legalName": "John McGeady Ltd"
            },
            "address": {
                "streetAddress": "Craighead Industrial Estate, Whistleberry Road",
                "locality": "Blantyre",
                "region": "UK",
                "postalCode": "G72 0TH"
            },
            "contactPoint": {
                "telephone": "+44 1414221524"
            },
            "roles": [
                "supplier"
            ],
            "details": {
                "scale": "sme",
                "url": "http://"
            }
        },
        {
            "id": "org-82",
            "name": "Court of Session",
            "identifier": {
                "legalName": "Court of Session"
            },
            "address": {
                "streetAddress": "Parliament Square",
                "locality": "Edinburgh",
                "postalCode": "EH1 1RQ"
            },
            "contactPoint": {
                "url": "http://"
            },
            "roles": [
                "reviewBody",
                "reviewContactPoint",
                "mediationBody"
            ]
        }
    ],
    "buyer": {
        "name": "Renfrewshire Council",
        "id": "org-80"
    },
    "tender": {
        "id": "RC-CPU-25-158 and RC-CPU-25-159",
        "title": "Construction of Red Smiddy to Erskine Active Travel Route Phases 4, 5 and 6",
        "description": "Renfrewshire Council has appointed a single Contractor to undertake two contracts: 1. Phases 4 and 5 (contract reference RC-CPU-25-158)is for the construction of 1.4km of shared footway and cycleway from the end of the existing shared footway/cycleway on Greenock Road, round Red Smiddy Roundabout, north onto Southbar Road to Southholm Roundabout. There is an existing footway at Red Smiddy Roundabout which is widened, and new construction on Southbar Road. In places the existing carriageway is widened. 2. Phase 6 (contract reference RC-CPU-25-159) is for the construction of 0.616km of shared footway and cycleway from Southholm Roundabout to the overbridge on the A726 on the northbound verge. This will include the relocation of street lighting columns, road signs and installation of new drainage. The works will involve the construction of a ramp to create a connection to the existing footway overbridge over the A726. The Council has awarded both contracts for this project to one Contractor.",
        "status": "complete",
        "items": [
            {
                "id": "1",
                "additionalClassifications": [
                    {
                        "id": "45233162",
                        "scheme": "CPV"
                    }
                ],
                "deliveryLocation": {
                    "description": "Renfrewshire"
                },
                "deliveryAddresses": [
                    {
                        "region": "UKM83"
                    },
                    {
                        "region": "UKM83"
                    }
                ],
                "relatedLot": "1"
            }
        ],
        "procurementMethod": "open",
        "procurementMethodDetails": "Open procedure",
        "mainProcurementCategory": "works",
        "submissionMethod": [
            "electronicSubmission"
        ],
        "submissionMethodDetails": "https://www.publictendersscotland.publiccontractsscotland.gov.uk/esop/pts-host/public/pts/web/login.html",
        "tenderPeriod": {
            "endDate": "2025-12-11T12:00:00Z"
        },
        "awardPeriod": {
            "startDate": "2025-12-11T12:00:00Z"
        },
        "documents": [
            {
                "id": "NOV543514",
                "documentType": "contractNotice",
                "title": "Construction of Red Smiddy to Erskine Active Travel Route Phases 4, 5 and 6",
                "description": "Renfrewshire Council wishes to appoint a single Contractor to undertake two contracts: 1. Phases 4 and 5 will be for the construction of 1.4km of shared footway and cycleway from the end of the existing shared footway/cycleway on Greenock Road, round Red Smiddy Roundabout, north onto Southbar Road to Southholm Roundabout. There is an existing footway at Red Smiddy Roundabout which is widened, and new construction on Southbar Road. In places the existing carriageway is widened. 2. Phase 6 will be for the construction of 0.616km of shared footway and cycleway from Southholm Roundabout to the overbridge on the A726 on the northbound verge. This will include the relocation of street lighting columns, road signs and installation of new drainage. The works will involve the construction of a ramp to create a connection to the existing footway overbridge over the A726. The Council will award both contracts for this project to one Contractor.",
                "url": "https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=NOV543514",
                "format": "text/html"
            },
            {
                "id": "economic",
                "documentType": "economicSelectionCriteria"
            },
            {
                "id": "technical",
                "documentType": "technicalSelectionCriteria"
            },
            {
                "id": "JAN546984",
                "documentType": "awardNotice",
                "title": "Construction of Red Smiddy to Erskine Active Travel Route Phases 4, 5 and 6",
                "description": "Renfrewshire Council has appointed a single Contractor to undertake two contracts: 1. Phases 4 and 5 (contract reference RC-CPU-25-158)is for the construction of 1.4km of shared footway and cycleway from the end of the existing shared footway/cycleway on Greenock Road, round Red Smiddy Roundabout, north onto Southbar Road to Southholm Roundabout. There is an existing footway at Red Smiddy Roundabout which is widened, and new construction on Southbar Road. In places the existing carriageway is widened. 2. Phase 6 (contract reference RC-CPU-25-159) is for the construction of 0.616km of shared footway and cycleway from Southholm Roundabout to the overbridge on the A726 on the northbound verge. This will include the relocation of street lighting columns, road signs and installation of new drainage. The works will involve the construction of a ramp to create a connection to the existing footway overbridge over the A726. The Council has awarded both contracts for this project to one Contractor.",
                "url": "https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=JAN546984",
                "format": "text/html"
            }
        ],
        "lots": [
            {
                "id": "1",
                "description": "Renfrewshire Council has appointed a single Contractor to undertake two contracts: 1. Phases 4 and 5 (contract reference RC-CPU-25-158)is for the construction of 1.4km of shared footway and cycleway from the end of the existing shared footway/cycleway on Greenock Road, round Red Smiddy Roundabout, north onto Southbar Road to Southholm Roundabout. There is an existing footway at Red Smiddy Roundabout which is widened, and new construction on Southbar Road. In places the existing carriageway is widened. 2. Phase 6 (contract reference RC-CPU-25-159) is for the construction of 0.616km of shared footway and cycleway from Southholm Roundabout to the overbridge on the A726 on the northbound verge. This will include the relocation of street lighting columns, road signs and installation of new drainage. The works will involve the construction of a ramp to create a connection to the existing footway overbridge over the A726. The Council has awarded both contracts for this project to one Contractor.",
                "status": "complete",
                "hasOptions": false,
                "submissionTerms": {
                    "variantPolicy": "notAllowed"
                },
                "contractPeriod": {
                    "durationInDays": 180
                },
                "hasRenewal": false
            }
        ],
        "bidOpening": {
            "date": "2025-12-11T12:00:00Z",
            "address": {
                "streetAddress": "Renfrewshire Council, Renfrewshire House, Cotton Street, Paisley."
            },
            "description": "Tenders will be opened in accordance with the Council's Standing Orders"
        },
        "contractTerms": {
            "hasElectronicPayment": true,
            "hasElectronicOrdering": true
        },
        "selectionCriteria": {
            "criteria": [
                {
                    "type": "suitability",
                    "description": "Selection criteria as stated in the procurement documents"
                }
            ]
        },
        "submissionTerms": {
            "languages": [
                "en"
            ],
            "bidValidityPeriod": {
                "endDate": "2026-05-08T00:00:00Z"
            }
        },
        "classification": {
            "id": "45000000",
            "scheme": "CPV"
        },
        "hasRecurrence": false
    },
    "language": "EN",
    "description": "(SC Ref:820342)",
    "links": [
        {
            "rel": "canonical",
            "href": "https://api.publiccontractsscotland.gov.uk/v1/Notice?id=ocds-r6ebe6-0000815289"
        },
        {
            "rel": "canonical",
            "href": "https://api.publiccontractsscotland.gov.uk/v1/Notice?id=ocds-r6ebe6-0000815289"
        }
    ],
    "noticetype": "PCS Notice - Website Contract Award Notice",
    "awards": [
        {
            "id": "RC-CPU-25-158 and RC-CPU-25.159",
            "suppliers": [
                {
                    "id": "org-129",
                    "name": "John McGeady Ltd"
                }
            ],
            "relatedLots": [
                "1"
            ]
        }
    ],
    "contracts": [
        {
            "id": "RC-CPU-25-158 and RC-CPU-25.159",
            "awardID": "RC-CPU-25-158 and RC-CPU-25.159",
            "status": "active",
            "value": {
                "amount": 1056774.68,
                "currency": "GBP"
            },
            "dateSigned": "2026-01-07T00:00:00Z"
        }
    ],
    "bids": {
        "statistics": [
            {
                "id": "428",
                "measure": "bids",
                "value": 8,
                "relatedLot": "1"
            },
            {
                "id": "429",
                "measure": "smeBids",
                "value": 8,
                "relatedLot": "1"
            },
            {
                "id": "430",
                "measure": "foreignBidsFromEU",
                "value": 0,
                "relatedLot": "1"
            },
            {
                "id": "431",
                "measure": "foreignBidsFromNonEU",
                "value": 8,
                "relatedLot": "1"
            },
            {
                "id": "432",
                "measure": "electronicBids",
                "value": 8,
                "relatedLot": "1"
            }
        ]
    }
}