Planning

Traffic Management (Main Works)

GALLIFORD TRY INFRASTRUCTURE LIMITED

This public procurement record has 1 release in its history.

Planning

15 Aug 2024 at 11:25

Summary of the contracting process

Galliford Try Infrastructure Limited is in the planning stage of a public procurement process for Traffic Management (Main Works) in the A47 North Tuddenham to Easton Scheme, located in Norfolk, East of England. This project is part of a major improvement scheme for the existing A47, converting single carriageways into dual carriageways. The notice was published on 15th August 2024, with an engagement end date of 22nd August 2024. The procurement process involves subcontracting for traffic management, including planning, implementing, and maintaining traffic control measures. The commencement of works is anticipated in February 2025, with interested contractors required to submit notifications of interest by 22nd August 2024.

This tender presents significant opportunities for businesses in the construction industry, especially those specialising in traffic management and control. Small and medium-sized enterprises (SMEs) with relevant certification, qualifications, and experience are highly suited to compete. The procurement method includes passing the PAS91 onboarding process through Builders Profile. Successful engagement could lead to substantial growth by securing a role in a major infrastructure project, enhancing expertise and public sector portfolio. Interested firms should assess their capabilities and submit detailed expressions of interest promptly to the specified email address.

Find more tenders on our Open Data Platform.
How relevant is this notice?

D3 Tenders Premium

Win More Public Sector Contracts

AI-powered tender discovery, pipeline management, and market intelligence — everything you need to grow your public sector business.

Notice Title

Traffic Management (Main Works)

Notice Description

NOTIFICATION OF SUBCONTRACT PACKAGE A47 North Tuddenham to Easton Scheme Galliford Try, as one of the East Region Delivery Integration Partners, is delivering the A47 North Tuddenham to Easton project in the County of Norfolk on behalf of National Highways. This project, which is part of major improvements to the existing A47, replaces the existing single carriageways between North Tuddenham and Easton with a dual carriageway, linking the existing dual carriageway at North Tuddenham to the Southern Norwich Bypass at Easton. The route is offline and crosses the existing A47 at three separate locations. Package: Traffic Management Outline Scope of Works: Planning, implementing, and maintaining traffic control measures to ensure the safe and efficient movement of vehicles and pedestrians around a worksite. This includes the design of traffic management plans, installation of signs, barriers, and temporary traffic lights, coordination with local authorities, monitoring of traffic conditions, and adjustment of control measures as needed. The scope also covers the provision of traffic controllers and ongoing risk assessments to mitigate disruptions and enhance safety. Full details and specifications will be provided to the successfully shortlisted suppliers. Suppliers should be aware of the scale of this project and should assess their internal capabilities to be able to carry out the intended scope of works, prior to completing this expression of interest (EOI). All interested contractors should hold all the relevant certification, qualifications and experience of providing this type of work. Programme: It is anticipated that the above scope of works will commence in February 2025 Timing: Deadline for Notifications of Interest 17:30 hrs on 22nd August 2024 Galliford Try Procurement Process: To secure work with Galliford Try, a supplier will need to pass the PAS91 onboarding process administered through Builders Profile. Details will be shared with shortlisted Subcontractors. If this package is of interest to your Company, please contact our procurement team by e-mail via the following email address: a47procurement@gallifordtry.co.uk, by the above deadline with your notification of interest and details of your capabilities, including the package title within the subject of the email. Any notifications of interest after the above deadline will not receive a response.

Publication & Lifecycle

Open Contracting ID
ocds-b5fd17-0ce6ac93-5e85-4efa-9e93-0922519c1122
Publication Source
Contracts Finder
Latest Notice
https://www.contractsfinder.service.gov.uk/Notice/9c9a6d5e-8a0c-4bf5-bf85-44a8f27791e6
Current Stage
Planning
All Stages
Planning

Procurement Classification

Notice Type
Market Engagement Notice
Procurement Type
Standard
Procurement Category
Not specified
Procurement Method
Not Specified
Procurement Method Details
Not specified
Tender Suitability
SME
Awardee Scale
Not specified

Common Procurement Vocabulary (CPV)

CPV Divisions

44 - Construction structures and materials; auxiliary products to construction (except electric apparatus)

45 - Construction work


CPV Codes

44000000 - Construction structures and materials; auxiliary products to construction (except electric apparatus)

45000000 - Construction work

Notice Value(s)

Tender Value
Not specified
Lots Value
Not specified
Awards Value
Not specified
Contracts Value
Not specified

Notice Dates

Publication Date
15 Aug 20241 years ago
Submission Deadline
Not specified
Future Notice Date
22 Aug 2024Expired
Award Date
Not specified
Contract Period
Not specified - Not specified
Recurrence
Not specified

Notice Status

Tender Status
Planning
Lots Status
Not Specified
Awards Status
Not Specified
Contracts Status
Not Specified

Contracting Authority (Buyer)

Main Buyer
GALLIFORD TRY INFRASTRUCTURE LIMITED
Contact Name
Available with D3 Tenders Premium →
Contact Email
Available with D3 Tenders Premium →
Contact Phone
Available with D3 Tenders Premium →

Buyer Location

Locality
NORWICH
Postcode
NR9 5DJ
Post Town
Norwich
Country
England

Major Region (ITL 1)
TLH East (England)
Basic Region (ITL 2)
TLH5 Norfolk
Small Region (ITL 3)
TLH51 Norwich and East Norfolk
Delivery Location
Not specified

Local Authority
Broadland
Electoral Ward
Great Witchingham
Westminster Constituency
Broadland and Fakenham

Open Contracting Data Standard (OCDS)

View full OCDS Record for this contracting process

Download

The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.

{
    "tag": [
        "compiled"
    ],
    "id": "ocds-b5fd17-0ce6ac93-5e85-4efa-9e93-0922519c1122-2024-08-15T12:25:29+01:00",
    "date": "2024-08-15T12:25:29+01:00",
    "ocid": "ocds-b5fd17-0ce6ac93-5e85-4efa-9e93-0922519c1122",
    "language": "en",
    "initiationType": "tender",
    "title": "Traffic Management (Main Works)",
    "planning": {
        "milestones": [
            {
                "id": "1",
                "title": "Engagement end date",
                "type": "engagement",
                "dueDate": "2024-08-22T23:59:59+01:00"
            }
        ],
        "documents": [
            {
                "id": "1",
                "documentType": "marketEngagementNotice",
                "description": "Early engagement notice on Contracts Finder",
                "url": "https://www.contractsfinder.service.gov.uk/Notice/9c9a6d5e-8a0c-4bf5-bf85-44a8f27791e6",
                "datePublished": "2024-08-15T12:25:29+01:00",
                "format": "text/html",
                "language": "en"
            }
        ]
    },
    "tender": {
        "id": "A47 Tuddenham to Easton - Traffic Management (Main Works)",
        "title": "Traffic Management (Main Works)",
        "description": "NOTIFICATION OF SUBCONTRACT PACKAGE A47 North Tuddenham to Easton Scheme Galliford Try, as one of the East Region Delivery Integration Partners, is delivering the A47 North Tuddenham to Easton project in the County of Norfolk on behalf of National Highways. This project, which is part of major improvements to the existing A47, replaces the existing single carriageways between North Tuddenham and Easton with a dual carriageway, linking the existing dual carriageway at North Tuddenham to the Southern Norwich Bypass at Easton. The route is offline and crosses the existing A47 at three separate locations. Package: Traffic Management Outline Scope of Works: Planning, implementing, and maintaining traffic control measures to ensure the safe and efficient movement of vehicles and pedestrians around a worksite. This includes the design of traffic management plans, installation of signs, barriers, and temporary traffic lights, coordination with local authorities, monitoring of traffic conditions, and adjustment of control measures as needed. The scope also covers the provision of traffic controllers and ongoing risk assessments to mitigate disruptions and enhance safety. Full details and specifications will be provided to the successfully shortlisted suppliers. Suppliers should be aware of the scale of this project and should assess their internal capabilities to be able to carry out the intended scope of works, prior to completing this expression of interest (EOI). All interested contractors should hold all the relevant certification, qualifications and experience of providing this type of work. Programme: It is anticipated that the above scope of works will commence in February 2025 Timing: Deadline for Notifications of Interest 17:30 hrs on 22nd August 2024 Galliford Try Procurement Process: To secure work with Galliford Try, a supplier will need to pass the PAS91 onboarding process administered through Builders Profile. Details will be shared with shortlisted Subcontractors. If this package is of interest to your Company, please contact our procurement team by e-mail via the following email address: a47procurement@gallifordtry.co.uk, by the above deadline with your notification of interest and details of your capabilities, including the package title within the subject of the email. Any notifications of interest after the above deadline will not receive a response.",
        "status": "planning",
        "classification": {
            "scheme": "CPV",
            "id": "44000000",
            "description": "Construction structures and materials; auxiliary products to construction (except electric apparatus)"
        },
        "additionalClassifications": [
            {
                "scheme": "CPV",
                "id": "45000000",
                "description": "Construction work"
            }
        ],
        "items": [
            {
                "id": "1",
                "deliveryAddresses": [
                    {
                        "region": "East of England",
                        "countryName": "United Kingdom"
                    }
                ]
            }
        ],
        "suitability": {
            "sme": true,
            "vcse": false
        }
    },
    "parties": [
        {
            "id": "GB-SRS-sid4gov.cabinetoffice.gov.uk/qDxe7WEc",
            "name": "GALLIFORD TRY INFRASTRUCTURE LIMITED",
            "identifier": {
                "legalName": "GALLIFORD TRY INFRASTRUCTURE LIMITED",
                "scheme": "GB-SRS",
                "id": "sid4gov.cabinetoffice.gov.uk/qDxe7WEc"
            },
            "address": {
                "streetAddress": "Galliford Try Tuddenham Site Office, Mattishall Road, Honingham",
                "locality": "Norwich",
                "postalCode": "NR9 5DJ",
                "countryName": "England"
            },
            "contactPoint": {
                "name": "Ben Houghton",
                "email": "a47procurement@gallifordtry.co.uk"
            },
            "details": {
                "url": "https://www.gallifordtry.co.uk/sectors/infrastructure/"
            },
            "roles": [
                "buyer"
            ]
        }
    ],
    "buyer": {
        "id": "GB-SRS-sid4gov.cabinetoffice.gov.uk/qDxe7WEc",
        "name": "GALLIFORD TRY INFRASTRUCTURE LIMITED"
    }
}