Tender

Rushmire Hill Geotechnical Remediation and Standish Multi-User Path

GLOUCESTERSHIRE COUNTY COUNCIL

  • Contract Timeline

    Publication Date

    26th September 2024 20:02:08 PM

    Tender Deadline

    31st October 2024 12:00:00 PM   32 days remaining

  • Contract Summary

    This advert is intended to notify potential suppliers of the combined tender including both the Rushmire Hill Geotechnical remediation and the Standish Multi-User Path works. These two pieces of work have been packaged as a single tender. Rushmire Hill Geotechnical Remediation Rushmire Hill is in South Gloucestershire, near Wotton-under-Edge, approximately 1.2 km south of Cotswold Edge Golf Course. The works are required to stabilise the B4058 carriageway, which has historically suffered deterioration from ground movement. Remediation works will include sheet piling along the GCC owned verge, verge and carriageway reconstruction. Site clearance will also be required to facilitate the piling works. Summary of Construction Phase key deliverables are as follows: Site clearance including tree clearance over approx. 255m, 3.5m width. Sheet piling installation along an approx. 255m length of verge. Partial carriageway reconstruction of the northbound carriageway over 280m. Carriageway resurfacing over approx. 300m Ground investigation including the installation of 3 no. inclinometers and 1 no. slotted standpipe in the carriageway Traffic Management during the construction works. Maintain residents' access during the construction works. Standish Multi User Path The works are located between the Horsemarling Lane roundabout and Blackbridge access track to the south of Standish, Gloucestershire. This scheme is part of a wider strategic scheme to boost active travel provision within the county, through the creation of the Gloucestershire Cycle Spine and includes a section of bridle way. Summary of Construction Phase key deliverables are as follows: Construction of 400m of 3m wide new shared use path and bridal way 150m of carriageway realignment and works to splinter island Streetlighting column installation and relocation. Columns will be supplied by GCC. Utility diversion works (pre-arranged by GCC for Principal Contractor to liaise/accommodate). Drainage works that tie-in to existing systems and includes ditch and attenuation pond construction. Traffic Management during the construction works. Maintain residents' access during the construction works Gloucestershire County Council are seeking a Principal Contractor to deliver the construction phase of this project. A summary of the outline programme for the combined packages of works is shown below: Tender period: 26th Sep - 31st Oct 2024 Award: Monday 25th November 2024 Anticipated Works Start Date: Monday 6th January 2025 Completion: Friday 30th May 2025 Overall Duration: 22 weeks Indicative Value: (£2.2M + £0.44M VAT) = £2.64M The proposed procurement route will be a single stage (Open Procedure) using the NEC4 ECC form of Contract, Option A Priced Contract with Activity Schedule. Full details will be available in the tender pack advertised on Procontract Thursday 26th September 2024. https://procontract.due-north.com/Advert?advertId=e79b7d6e-ad6f-ef11-812f-005056b64

  • Contract Details

    Open Contracting ID

    ocds-b5fd17-3d624723-6298-4f36-905f-61f8547a6226

    Publication Source

    Contracts Finder

    Procurement Stage

    Tender

    Procurement Method

    N/A

    Procurement Method Details

    Other -

    Procurement Category

    Works

    Tender Suitability

    SME

    Framework / DPS

  • Contract Classification

    CPV Code(s)

    45000000

    CPV Division(s)

    45 - Construction work

  • Awarding Authority

    GLOUCESTERSHIRE COUNTY COUNCIL

    Buyer Name

    Mike McGowan

    Buyer Email

    mike.mcgowan@gloucestershire.gov.uk

    Buyer Phone

    +44 1452328900

    Buyer Address

    Shire Hall

    Gloucester

    GL1 2TH

    England