Notice Information
Notice Title
Thorne Electricity Supply
Notice Description
Natural England is the governments' adviser on the Natural Environment in England and is an executive non-departmental public body sponsored by DEFRA. Natural England are seeking suitably qualified suppliers to provide resource estimates for a forthcoming project based on the Humberhead Peatlands National Nature Reserve (NNR). National Nature Reserves (NNRs) were established to protect some of our most important habitats, species and geology, and to provide 'outdoor laboratories' for research. Most NNRs offer great opportunities to schools, specialist interest groups and the public to experience wildlife at first hand and to learn more about nature conservation. Suppliers must have the capabilities and capacity to install power via the existing distribution network, to a workshop/reserve base on the Humberhead Peatlands NNR. The Requirement is for a new 2 C low voltage connection to the Distribution System (with a maximum capacity of 55 kVA at the pumping station and workshop). Due to the ground conditions, the methodology must incorporate the usage of overhead power cables; specialist low pressure vehicles may be required. Suppliers are expected to comply with the following criteria: * Be NERS accredited * Comply with G81 and G88 regulations * Ensure that Northern Powergrid is the Distributor Network Operator * Submit their design application to Northern Powergrid by 14th July 2023 * Have full CDM plans and certificates available * Ensure that Risk assessments are accurately carried out * Ensure that they are working to the highest environmental standards and to best-practice guidelines To attend a site visit, all interested parties should contact Craig Ralston (craig.ralston@naturalengland.org.uk) by 5pm on Monday 3rd July. Further information on the location for this work is below: The current location for the nearest electricity supply is Top Moors Farm - DN14 8DT (this is the nearest post code to Bank Top - grid reference is SE75517 17152). The workshop is located approximately 1 mile along a limestone track. It is surrounded by peat bog and needs to feed a pumping station (grid reference is SE75117 16316), to then bring phase 3 electric into the workshop/Reserve base (grid reference is SE74626 15199). Maps are attached for further information.
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-b5fd17-4a5f4c5e-e5ee-4e63-91dc-958b579b22a8
- Publication Source
- Contracts Finder
- Latest Notice
- https://www.contractsfinder.service.gov.uk/Notice/8aee1b21-0950-423e-a33c-44da6501d26c
- Current Stage
- Planning
- All Stages
- Planning
Procurement Classification
- Notice Type
- Market Engagement Notice
- Procurement Type
- Standard
- Procurement Category
- Works
- Procurement Method
- Not Specified
- Procurement Method Details
- Not specified
- Tender Suitability
- SME, VCSE
- Awardee Scale
- Not specified
Common Procurement Vocabulary (CPV)
- CPV Divisions
09 - Petroleum products, fuel, electricity and other sources of energy
45 - Construction work
65 - Public utilities
-
- CPV Codes
09310000 - Electricity
45315300 - Electricity supply installations
65310000 - Electricity distribution
Notice Value(s)
- Tender Value
- Not specified
- Lots Value
- Not specified
- Awards Value
- Not specified
- Contracts Value
- Not specified
Notice Dates
- Publication Date
- 19 Jun 20232 years ago
- Submission Deadline
- Not specified
- Future Notice Date
- 3 Jul 2023Expired
- Award Date
- Not specified
- Contract Period
- Not specified - Not specified
- Recurrence
- Not specified
Notice Status
- Tender Status
- Planning
- Lots Status
- Not Specified
- Awards Status
- Not Specified
- Contracts Status
- Not Specified
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- NATURAL ENGLAND
- Contact Name
- Craig Ralston
- Contact Email
- craig.ralston@naturalengland.org.uk
- Contact Phone
- Not specified
Buyer Location
- Locality
- THORNE
- Postcode
- DN14 8DT
- Post Town
- Doncaster
- Country
- England
-
- Major Region (ITL 1)
- TLE Yorkshire and The Humber
- Basic Region (ITL 2)
- TLE1 East Yorkshire and Northern Lincolnshire
- Small Region (ITL 3)
- TLE12 East Riding of Yorkshire
- Delivery Location
- TLC North East (England), TLE Yorkshire and The Humber
-
- Local Authority
- East Riding of Yorkshire
- Electoral Ward
- Snaith, Airmyn, Rawcliffe and Marshland
- Westminster Constituency
- Goole and Pocklington
Further Information
Notice Documents
-
https://www.contractsfinder.service.gov.uk/Notice/8aee1b21-0950-423e-a33c-44da6501d26c
19th June 2023 - Early engagement notice on Contracts Finder
Open Contracting Data Standard (OCDS)
View full OCDS Record for this contracting process
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.
{
"tag": [
"compiled"
],
"id": "ocds-b5fd17-4a5f4c5e-e5ee-4e63-91dc-958b579b22a8-2023-06-19T12:50:39+01:00",
"date": "2023-06-19T12:50:39+01:00",
"ocid": "ocds-b5fd17-4a5f4c5e-e5ee-4e63-91dc-958b579b22a8",
"language": "en",
"initiationType": "tender",
"title": "Thorne Electricity Supply",
"planning": {
"milestones": [
{
"id": "1",
"title": "Engagement end date",
"type": "engagement",
"dueDate": "2023-07-03T23:59:59+01:00"
}
],
"documents": [
{
"id": "1",
"documentType": "marketEngagementNotice",
"description": "Early engagement notice on Contracts Finder",
"url": "https://www.contractsfinder.service.gov.uk/Notice/8aee1b21-0950-423e-a33c-44da6501d26c",
"datePublished": "2023-06-19T12:50:39+01:00",
"format": "text/html",
"language": "en"
},
{
"id": "2",
"description": "Thorne Site Maps",
"url": "https://www.contractsfinder.service.gov.uk/Notice/Attachment/3bac13c4-05cb-40fa-8bba-4aad3ca68eba",
"format": "application/vnd.openxmlformats-officedocument.wordprocessingml.document"
}
]
},
"tender": {
"id": "CF-0084500D8d000003VQwdEAG",
"title": "Thorne Electricity Supply",
"description": "Natural England is the governments' adviser on the Natural Environment in England and is an executive non-departmental public body sponsored by DEFRA. Natural England are seeking suitably qualified suppliers to provide resource estimates for a forthcoming project based on the Humberhead Peatlands National Nature Reserve (NNR). National Nature Reserves (NNRs) were established to protect some of our most important habitats, species and geology, and to provide 'outdoor laboratories' for research. Most NNRs offer great opportunities to schools, specialist interest groups and the public to experience wildlife at first hand and to learn more about nature conservation. Suppliers must have the capabilities and capacity to install power via the existing distribution network, to a workshop/reserve base on the Humberhead Peatlands NNR. The Requirement is for a new 2 C low voltage connection to the Distribution System (with a maximum capacity of 55 kVA at the pumping station and workshop). Due to the ground conditions, the methodology must incorporate the usage of overhead power cables; specialist low pressure vehicles may be required. Suppliers are expected to comply with the following criteria: * Be NERS accredited * Comply with G81 and G88 regulations * Ensure that Northern Powergrid is the Distributor Network Operator * Submit their design application to Northern Powergrid by 14th July 2023 * Have full CDM plans and certificates available * Ensure that Risk assessments are accurately carried out * Ensure that they are working to the highest environmental standards and to best-practice guidelines To attend a site visit, all interested parties should contact Craig Ralston (craig.ralston@naturalengland.org.uk) by 5pm on Monday 3rd July. Further information on the location for this work is below: The current location for the nearest electricity supply is Top Moors Farm - DN14 8DT (this is the nearest post code to Bank Top - grid reference is SE75517 17152). The workshop is located approximately 1 mile along a limestone track. It is surrounded by peat bog and needs to feed a pumping station (grid reference is SE75117 16316), to then bring phase 3 electric into the workshop/Reserve base (grid reference is SE74626 15199). Maps are attached for further information.",
"status": "planning",
"classification": {
"scheme": "CPV",
"id": "45315300",
"description": "Electricity supply installations"
},
"additionalClassifications": [
{
"scheme": "CPV",
"id": "09310000",
"description": "Electricity"
},
{
"scheme": "CPV",
"id": "65310000",
"description": "Electricity distribution"
},
{
"scheme": "CPV",
"id": "45315300",
"description": "Electricity supply installations"
}
],
"items": [
{
"id": "1",
"deliveryAddresses": [
{
"postalCode": "DN14 8DT"
},
{
"region": "North East",
"countryName": "United Kingdom"
},
{
"region": "Yorkshire and the Humber",
"countryName": "United Kingdom"
}
]
}
],
"suitability": {
"sme": true,
"vcse": true
},
"mainProcurementCategory": "works"
},
"parties": [
{
"id": "GB-CFS-249048",
"name": "Natural England",
"identifier": {
"legalName": "Natural England"
},
"address": {
"streetAddress": "Thorne",
"locality": "Thorne",
"postalCode": "DN14 8DT",
"countryName": "GB"
},
"contactPoint": {
"name": "Craig Ralston",
"email": "craig.ralston@naturalengland.org.uk"
},
"roles": [
"buyer"
]
}
],
"buyer": {
"id": "GB-CFS-249048",
"name": "Natural England"
}
}