Notice Information
Notice Title
Greek Street, Stockport. Rail bridge Reconstruction - FRC Package
Notice Description
CMP2/1a Greek street carries the two lane Greek Street Roundabout over the five track electrified West Coast Main Line, in Stockport City Centre. Two Tracks run below the East Span with the three remaining tracks below the west span. The bridge was originally a tunnel but was reconstructed as an overbridge in 1958. The Two span Simply supported superstructure consists of precast post-tensioned prestressed concrete deck beams and in-situ reinforced concrete deck slabs. Gaps between the beams are formed by in-situ reinforced concrete. The intermediate support is provided by a reinforced concrete crosshead beam, columns and foundation slab. The deck beams are post-tensioned transversely. Parapets for the structure are comprised of brickwork. The bridge has a skew spans of 9.14m on the east and 13.99m on the west side, at angles of 13 degrees. The carriageway width varies from 9 to 13m due to the layout of the roundabout. Footways are provided adjacent to the north and south parapets of the structure, with varying widths. Trief Kerbing with a mounted pedestrian guardrail are present to separate pedestrians from the carriageway. Greek Street Bridge is a two span post tensioned structure in which the latest PTSI assessment concluded that the structure is understrength and overstressed. Engineering standard NR/CIV/025 has been used to manage the substandard structure in the short term with additional monitoring in place. Specific elements of concern included exposed concrete reinforcement which has begun to corrode on the deck soffit, seepage of water onto the soffit which will cause degradation to accelerate further. The most recent assessment report stated that the risk of failure was 'High' to 'Very High' and that deck replacement is required in 2025, otherwise the structure would need to be closed to road traffic until completely reconstructed, due to the overstress and deterioration it would not be safe to operate. The project proposal is to replace the existing bridge with a single span removing the central pier in a 21 day core possession in August 2025. This will require alterations to the existing OLE equipment that runs underneath the structure. The highway will also be closed for a significant period whilst construction works are undertaken to replace the bridge - circa 50 weeks. The deck construction works will commence once all beams are landed, connected and waterproofing membrane is installed. The sub-contractor will then be responsible for setting up all formwork and erecting steel re-inforcement (Opportunity to construct in cages may arise during design development, but please assume in-situ at this stage). Supply all associated concrete. Sub-contractor to then provide 2no. concrete pumps for duration of their pouring works. Sub-contractor to also finish concrete. Additional information: Relevant due diligence checks will be carried out. Construction Line RISQS SSIP Financial Checks
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-b5fd17-ae89e703-23ab-415f-bfe1-8cb0d214e11f
- Publication Source
- Contracts Finder
- Latest Notice
- https://www.contractsfinder.service.gov.uk/Notice/de83de6f-58da-4421-a4e0-d943fa3504d6
- Current Stage
- Tender
- All Stages
- Tender
Procurement Classification
- Notice Type
- Tender Notice
- Procurement Type
- Standard
- Procurement Category
- Works
- Procurement Method
- Not Specified
- Procurement Method Details
- Tender Suitability
- SME
- Awardee Scale
- Not specified
Common Procurement Vocabulary (CPV)
- CPV Divisions
24 - Chemical products
42 - Industrial machinery
43 - Machinery for mining, quarrying, construction equipment
44 - Construction structures and materials; auxiliary products to construction (except electric apparatus)
45 - Construction work
-
- CPV Codes
24957200 - Additives for cements, mortars or concretes
42122190 - Concrete pumps
43413000 - Concrete or mortar mixers
44114000 - Concrete
44114100 - Ready-mixed concrete
44114200 - Concrete products
44114250 - Concrete slabs
45223500 - Reinforced-concrete structures
45262300 - Concrete work
45262310 - Reinforced-concrete work
45262311 - Concrete carcassing work
45262350 - Unreinforced-concrete work
45262370 - Concrete-coating work
Notice Value(s)
- Tender Value
- £500,000 £500K-£1M
- Lots Value
- Not specified
- Awards Value
- Not specified
- Contracts Value
- Not specified
Notice Dates
- Publication Date
- 5 Jul 20241 years ago
- Submission Deadline
- 26 Jul 2024Expired
- Future Notice Date
- Not specified
- Award Date
- Not specified
- Contract Period
- 30 Jul 2025 - 31 Aug 2025 1-6 months
- Recurrence
- Not specified
Notice Status
- Tender Status
- Active
- Lots Status
- Not Specified
- Awards Status
- Not Specified
- Contracts Status
- Not Specified
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- J MURPHY & SONS LIMITED
- Contact Name
- Available with D3 Tenders Premium →
- Contact Email
- Available with D3 Tenders Premium →
- Contact Phone
- Available with D3 Tenders Premium →
Buyer Location
- Locality
- LONDON
- Postcode
- NW5 1TN
- Post Town
- North West London
- Country
- England
-
- Major Region (ITL 1)
- TLI London
- Basic Region (ITL 2)
- TLI3 Inner London - West
- Small Region (ITL 3)
- TLI36 Camden
- Delivery Location
- TLD North West (England)
-
- Local Authority
- Camden
- Electoral Ward
- Kentish Town North
- Westminster Constituency
- Holborn and St Pancras
Further Information
Notice Documents
-
https://www.contractsfinder.service.gov.uk/Notice/de83de6f-58da-4421-a4e0-d943fa3504d6
5th July 2024 - Opportunity notice on Contracts Finder -
https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=82188497
Please follow this link to view the notice.
Open Contracting Data Standard (OCDS)
View full OCDS Record for this contracting process
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.
{
"tag": [
"compiled"
],
"id": "ocds-b5fd17-ae89e703-23ab-415f-bfe1-8cb0d214e11f-2024-07-05T11:30:03+01:00",
"date": "2024-07-05T11:30:03+01:00",
"ocid": "ocds-b5fd17-ae89e703-23ab-415f-bfe1-8cb0d214e11f",
"language": "en",
"initiationType": "tender",
"tender": {
"id": "C4N82188495",
"title": "Greek Street, Stockport. Rail bridge Reconstruction - FRC Package",
"description": "CMP2/1a Greek street carries the two lane Greek Street Roundabout over the five track electrified West Coast Main Line, in Stockport City Centre. Two Tracks run below the East Span with the three remaining tracks below the west span. The bridge was originally a tunnel but was reconstructed as an overbridge in 1958. The Two span Simply supported superstructure consists of precast post-tensioned prestressed concrete deck beams and in-situ reinforced concrete deck slabs. Gaps between the beams are formed by in-situ reinforced concrete. The intermediate support is provided by a reinforced concrete crosshead beam, columns and foundation slab. The deck beams are post-tensioned transversely. Parapets for the structure are comprised of brickwork. The bridge has a skew spans of 9.14m on the east and 13.99m on the west side, at angles of 13 degrees. The carriageway width varies from 9 to 13m due to the layout of the roundabout. Footways are provided adjacent to the north and south parapets of the structure, with varying widths. Trief Kerbing with a mounted pedestrian guardrail are present to separate pedestrians from the carriageway. Greek Street Bridge is a two span post tensioned structure in which the latest PTSI assessment concluded that the structure is understrength and overstressed. Engineering standard NR/CIV/025 has been used to manage the substandard structure in the short term with additional monitoring in place. Specific elements of concern included exposed concrete reinforcement which has begun to corrode on the deck soffit, seepage of water onto the soffit which will cause degradation to accelerate further. The most recent assessment report stated that the risk of failure was 'High' to 'Very High' and that deck replacement is required in 2025, otherwise the structure would need to be closed to road traffic until completely reconstructed, due to the overstress and deterioration it would not be safe to operate. The project proposal is to replace the existing bridge with a single span removing the central pier in a 21 day core possession in August 2025. This will require alterations to the existing OLE equipment that runs underneath the structure. The highway will also be closed for a significant period whilst construction works are undertaken to replace the bridge - circa 50 weeks. The deck construction works will commence once all beams are landed, connected and waterproofing membrane is installed. The sub-contractor will then be responsible for setting up all formwork and erecting steel re-inforcement (Opportunity to construct in cages may arise during design development, but please assume in-situ at this stage). Supply all associated concrete. Sub-contractor to then provide 2no. concrete pumps for duration of their pouring works. Sub-contractor to also finish concrete. Additional information: Relevant due diligence checks will be carried out. Construction Line RISQS SSIP Financial Checks",
"datePublished": "2024-07-05T11:30:03+01:00",
"status": "active",
"classification": {
"scheme": "CPV",
"id": "45262311",
"description": "Concrete carcassing work"
},
"additionalClassifications": [
{
"scheme": "CPV",
"id": "44114100",
"description": "Ready-mixed concrete"
},
{
"scheme": "CPV",
"id": "45262350",
"description": "Unreinforced-concrete work"
},
{
"scheme": "CPV",
"id": "24957200",
"description": "Additives for cements, mortars or concretes"
},
{
"scheme": "CPV",
"id": "45223500",
"description": "Reinforced-concrete structures"
},
{
"scheme": "CPV",
"id": "45262300",
"description": "Concrete work"
},
{
"scheme": "CPV",
"id": "44114000",
"description": "Concrete"
},
{
"scheme": "CPV",
"id": "45262310",
"description": "Reinforced-concrete work"
},
{
"scheme": "CPV",
"id": "44114250",
"description": "Concrete slabs"
},
{
"scheme": "CPV",
"id": "43413000",
"description": "Concrete or mortar mixers"
},
{
"scheme": "CPV",
"id": "44114200",
"description": "Concrete products"
},
{
"scheme": "CPV",
"id": "42122190",
"description": "Concrete pumps"
},
{
"scheme": "CPV",
"id": "45262370",
"description": "Concrete-coating work"
}
],
"items": [
{
"id": "1",
"deliveryAddresses": [
{
"region": "North West",
"countryName": "United Kingdom"
}
]
}
],
"minValue": {
"amount": 250000,
"currency": "GBP"
},
"value": {
"amount": 500000,
"currency": "GBP"
},
"tenderPeriod": {
"endDate": "2024-07-26T12:00:00+01:00"
},
"contractPeriod": {
"startDate": "2025-07-31T00:00:00+01:00",
"endDate": "2025-08-31T23:59:59+01:00"
},
"suitability": {
"sme": true,
"vcse": false
},
"mainProcurementCategory": "works",
"documents": [
{
"id": "1",
"documentType": "tenderNotice",
"description": "Opportunity notice on Contracts Finder",
"url": "https://www.contractsfinder.service.gov.uk/Notice/de83de6f-58da-4421-a4e0-d943fa3504d6",
"datePublished": "2024-07-05T11:30:03+01:00",
"format": "text/html",
"language": "en"
},
{
"id": "2",
"documentType": "tenderNotice",
"description": "Please follow this link to view the notice.",
"url": "https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=82188497"
}
]
},
"parties": [
{
"id": "GB-CFS-201385",
"name": "J Murphy & Sons Limited",
"identifier": {
"legalName": "J Murphy & Sons Limited"
},
"address": {
"streetAddress": "Hiview House, Highgate Road",
"locality": "London",
"postalCode": "NW51TN",
"countryName": "UK"
},
"contactPoint": {
"name": "Louise Day",
"email": "louiseday@murphygroup.co.uk",
"telephone": "07849630497"
},
"roles": [
"buyer"
]
}
],
"buyer": {
"id": "GB-CFS-201385",
"name": "J Murphy & Sons Limited"
}
}