Notice Information
Notice Title
Supply Chain Notice: WAT-0044-02- Design and Install a Tug Berth Pontoon Replacement
Notice Description
The Tenderer should be aware that the works detailed in this package are constrained due to the nature of the location they are to be conducted in. Project location HM Naval Base Portsmouth The Contractor shall be expected to adhere by the HMNB site security requirements, all Contractors and Sub-Contractors shall be BPSS security vetted and will be required to hold the relevant site security passes. The Contractor shall be expected to hold the following levels of insurance PS10m Public Liability, PS10m Product Liability, PS5m Professional Indemnity KBS Maritime - Introduction KBS Maritime is a joint venture between KBR and BAE Systems, bringing together two global players with a rich heritage of delivering excellence, innovation and reliability. The joint venture will combine the expertise of KBR as a global leader in infrastructure asset management and services with BAE Systems' experience and capability within Portsmouth Naval Base. KBS Maritime are delivering an ambitious, modern and enduring change to the Portsmouth Naval base infrastructure, securing investment in the local community and ensuring fit-for-purpose, world-leading fleet support for the Royal Navy and the UK in the decades ahead. Project Background KBS Maritime have a requirement to design and install a berthing pontoon and structure to support the tug operations relating to Portsmouth Naval Base. The pontoons shall have the compatibility to interchange between the existing structure and the newly designed installation. For the newly designed structure, the Contractor shall assume a piled retention system with a max berthing force requirement of 800T. The design and subsequent works will require an investigation/survey of the seabed; construction of the civil engineering enabling works; installation (including mechanical and electrical services). Additionally, the removal and disposal of the existing pontoon and piles shall be considered. Key Dates (approximate) Expressions of Interest: 08 August 2023 ITT Published: 14 August 2023 ITT Close: 28 September 2023 Bidders Selected: 31 October 2023 Construction commencement: Nov 2023 Construction Completion: TBC Additional information: If you are interested in this opportunity, please contact Paul Homshaw - at Tenders@kbsmaritime.com to express interest, quoting ref WAT-0044-02 Design and Install a Tug Berth Pontoon Replacement. Please also visit Asite Marketplace to register as a supplier. Once registered / if you are already a registered user, please email tenders@kbsmaritime.com to be added to our connected supply list, quoting full Company Name. Once the notice has closed, suppliers will be invited to Pre-Qualify and/or Invited to Tender. Open or restricted tender procedure will be dependent on the number of expressions of interest received. A Non-Disclosure Agreement will also be required, prior to participating in a Pre Qualification and/or Invitation to Tender
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-b5fd17-af2329c4-fa17-42f6-9acd-89f0ca185036
- Publication Source
- Contracts Finder
- Latest Notice
- https://www.contractsfinder.service.gov.uk/Notice/768be75b-9f6e-4a47-b2ab-a214f249c498
- Current Stage
- Planning
- All Stages
- Planning
Procurement Classification
- Notice Type
- Market Engagement Notice
- Procurement Type
- Standard
- Procurement Category
- Not specified
- Procurement Method
- Not Specified
- Procurement Method Details
- Not specified
- Tender Suitability
- SME
- Awardee Scale
- Not specified
Common Procurement Vocabulary (CPV)
- CPV Divisions
45 - Construction work
-
- CPV Codes
45241300 - Pier construction work
Notice Value(s)
- Tender Value
- Not specified
- Lots Value
- Not specified
- Awards Value
- Not specified
- Contracts Value
- Not specified
Notice Dates
- Publication Date
- 24 Jul 20232 years ago
- Submission Deadline
- Not specified
- Future Notice Date
- 8 Aug 2023Expired
- Award Date
- Not specified
- Contract Period
- Not specified - Not specified
- Recurrence
- Not specified
Notice Status
- Tender Status
- Planning
- Lots Status
- Not Specified
- Awards Status
- Not Specified
- Contracts Status
- Not Specified
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- MINISTRY OF DEFENCE
- Contact Name
- Not specified
- Contact Email
- tenders@kbsmaritime.com
- Contact Phone
- Not specified
Buyer Location
- Locality
- PORTSMOUTH
- Postcode
- PO1 3NH
- Post Town
- Portsmouth
- Country
- England
-
- Major Region (ITL 1)
- TLJ South East (England)
- Basic Region (ITL 2)
- TLJ3 Hampshire and Isle of Wight
- Small Region (ITL 3)
- TLJ31 Portsmouth
- Delivery Location
- TLJ South East (England)
-
- Local Authority
- Portsmouth
- Electoral Ward
- Charles Dickens
- Westminster Constituency
- Portsmouth South
Further Information
Notice Documents
-
https://www.contractsfinder.service.gov.uk/Notice/768be75b-9f6e-4a47-b2ab-a214f249c498
24th July 2023 - Early engagement notice on Contracts Finder
Open Contracting Data Standard (OCDS)
View full OCDS Record for this contracting process
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.
{
"tag": [
"compiled"
],
"id": "ocds-b5fd17-af2329c4-fa17-42f6-9acd-89f0ca185036-2023-07-24T14:07:00+01:00",
"date": "2023-07-24T14:07:00+01:00",
"ocid": "ocds-b5fd17-af2329c4-fa17-42f6-9acd-89f0ca185036",
"language": "en",
"initiationType": "tender",
"title": "Supply Chain Notice: WAT-0044-02- Design and Install a Tug Berth Pontoon Replacement",
"planning": {
"milestones": [
{
"id": "1",
"title": "Engagement end date",
"type": "engagement",
"dueDate": "2023-08-08T23:59:59+01:00"
}
],
"documents": [
{
"id": "1",
"documentType": "marketEngagementNotice",
"description": "Early engagement notice on Contracts Finder",
"url": "https://www.contractsfinder.service.gov.uk/Notice/768be75b-9f6e-4a47-b2ab-a214f249c498",
"datePublished": "2023-07-24T14:07:00+01:00",
"format": "text/html",
"language": "en"
}
]
},
"tender": {
"id": "tender_380684/1239648",
"title": "Supply Chain Notice: WAT-0044-02- Design and Install a Tug Berth Pontoon Replacement",
"description": "The Tenderer should be aware that the works detailed in this package are constrained due to the nature of the location they are to be conducted in. Project location HM Naval Base Portsmouth The Contractor shall be expected to adhere by the HMNB site security requirements, all Contractors and Sub-Contractors shall be BPSS security vetted and will be required to hold the relevant site security passes. The Contractor shall be expected to hold the following levels of insurance PS10m Public Liability, PS10m Product Liability, PS5m Professional Indemnity KBS Maritime - Introduction KBS Maritime is a joint venture between KBR and BAE Systems, bringing together two global players with a rich heritage of delivering excellence, innovation and reliability. The joint venture will combine the expertise of KBR as a global leader in infrastructure asset management and services with BAE Systems' experience and capability within Portsmouth Naval Base. KBS Maritime are delivering an ambitious, modern and enduring change to the Portsmouth Naval base infrastructure, securing investment in the local community and ensuring fit-for-purpose, world-leading fleet support for the Royal Navy and the UK in the decades ahead. Project Background KBS Maritime have a requirement to design and install a berthing pontoon and structure to support the tug operations relating to Portsmouth Naval Base. The pontoons shall have the compatibility to interchange between the existing structure and the newly designed installation. For the newly designed structure, the Contractor shall assume a piled retention system with a max berthing force requirement of 800T. The design and subsequent works will require an investigation/survey of the seabed; construction of the civil engineering enabling works; installation (including mechanical and electrical services). Additionally, the removal and disposal of the existing pontoon and piles shall be considered. Key Dates (approximate) Expressions of Interest: 08 August 2023 ITT Published: 14 August 2023 ITT Close: 28 September 2023 Bidders Selected: 31 October 2023 Construction commencement: Nov 2023 Construction Completion: TBC Additional information: If you are interested in this opportunity, please contact Paul Homshaw - at Tenders@kbsmaritime.com to express interest, quoting ref WAT-0044-02 Design and Install a Tug Berth Pontoon Replacement. Please also visit Asite Marketplace to register as a supplier. Once registered / if you are already a registered user, please email tenders@kbsmaritime.com to be added to our connected supply list, quoting full Company Name. Once the notice has closed, suppliers will be invited to Pre-Qualify and/or Invited to Tender. Open or restricted tender procedure will be dependent on the number of expressions of interest received. A Non-Disclosure Agreement will also be required, prior to participating in a Pre Qualification and/or Invitation to Tender",
"status": "planning",
"classification": {
"scheme": "CPV",
"id": "45241300",
"description": "Pier construction work"
},
"items": [
{
"id": "1",
"deliveryAddresses": [
{
"region": "South East",
"countryName": "United Kingdom"
}
]
}
],
"suitability": {
"sme": true,
"vcse": false
}
},
"parties": [
{
"id": "GB-CFS-239071",
"name": "Ministry of Defence",
"identifier": {
"legalName": "Ministry of Defence"
},
"address": {
"streetAddress": "Victory Building, Portsmouth Naval Base,",
"locality": "Portsmouth",
"postalCode": "PO1 3NH",
"countryName": "England"
},
"contactPoint": {
"email": "tenders@kbsmaritime.com"
},
"roles": [
"buyer"
]
}
],
"buyer": {
"id": "GB-CFS-239071",
"name": "Ministry of Defence"
}
}