Contract Timeline
- Publication Date
-
7th January 2025 16:00:04 PM
- Tender Deadline
-
24th January 2025 15:11:00 PM Expired
-
Contract Summary
Fluence Energy (A Siemens and AES Company) have an exciting BoP EPC project pipeline for 2025. Fluence are working with some fantastic new and existing customers, helping them to deliver comprehensive turnkey Battery Energy Storage Solutions (BESS). We are looking to contract with Balance of Plant (BoP) Civil and Electrical contractors to deliver an initial pipeline of 3 projects. All three projects are Turnkey and located within UK & Ireland. The Specific areas of these projects are in close proximity to: East Ayrshire (Scotland), Greater Manchester (England) and Dublin (Ireland). Typical BoP scope activities includes (but not limited to): Preliminaries: Project & Site Management Design & Engineering Management Electrical System Studies Site Setup Civil Works: Enabling Works Setting out and surveys HSE, site infrastructure and CDM compliance Temporary works requirements Establish Finished platform Piling Drainage works Ducting and troughing installation Installation of equipment bases Control Room Installation Equipment lifting Landscaping Electrical Works: Lightning Protection, earthing, bonding Supply & install of switchboards Supply & Install cables including terminations Supply & Install Auxiliar Transformers Supply & Install Containerised Building/Control Room/s Control & Protection Panels & Wiring Supply & Install BESS External Lighting Supply & Install BESS CCTV System (optional) Supply & Install DC Systems (Containerised Building) (Optional) Installation of Fire Alarm Panels (including wiring ) BESS - Offloading, Positioning & Installation of Battery Enclosures BESS - Cooling Liquid filling of Battery Enclosures BESS - Offloading, Positioning & Installation of Power Conversion Systems BESS - Offloading, Positioning & Installation of Core Transformers BESS - Offloading, Positioning & Installation of Core Support Enclosures BESS - Offloading, Positioning & Installation of Core Auxiliary Power Panel BESS - Supply & Installation of Cables in all Battery Nodes BESS - Supply & Installation of Communication Cables BESS - Supply & Installation of Auxiliary Power Cables BESS - Supply & Installation of All Cables from BESS PEC Unit to IPP Customer Control Building BESS - Supply & Installation of Auxiliary F-Stop Cables BESS - Supply & Installation of Fire Alarm System Cables Test & Commissioning: Test & Commissioning Containerised Building (Switchgear, LV AC & DC, Fire, C&P and FO Cables) Quality Assurance Documentation
-
Contract Details
- Open Contracting ID
-
ocds-b5fd17-e3ff282e-a4be-4140-88e9-9c1dc9e601ff
- Publication Source
-
Contracts Finder
- Procurement Stage
-
Tender
- Procurement Method
-
N/A
- Procurement Method Details
- Procurement Category
-
Works
- Tender Suitability
-
SME
- Framework / DPS
-
Contract Classification
- CPV Code(s)
-
09330000
09332000
31121300
31422000
31600000
43310000
45200000
71311100
71314000 - CPV Division(s)
-
09 - Petroleum products, fuel, electricity and other sources of energy
31 - Electrical machinery, apparatus, equipment and consumables; Lighting
43 - Machinery for mining, quarrying, construction equipment
45 - Construction work
71 - Architectural, construction, engineering and inspection services
-
Awarding Authority
- Buyer Name
-
Matthew Cemm
- Buyer Email
-
matthew.cemm@fluenceenergy.com
- Buyer Phone
-
07891367141
- Buyer Address
-
3rd Floor, Exmouth House, 3-11 Pine Street
London
EC1R 0JH
UK