Notice Information
Notice Title
DE2957529 Appointment of an IST for New-Bridge Integrated College Loughbrickland
Notice Description
The project is for the design, supply, delivery, receiving, off-loading, setting into position, fixing, erection, building testing, commissioning and finishing in every respect of the new Post-Primary School for 670 pupils to include external hard play, synthetic and grass pitches, tennis courts, Sports Hall, School Meals Accommodation, car and bus parking and drop-off and a new entrance onto Donard View Road. The design has been completed to RIBA Stage 3. The successful IST will be responsible for completing RIBA Stage 4 onwards. It is proposed to construct the new school on the existing site with the grass pitches being developed on a newly purchased site adjacent to the existing. There are no established site services on the additional site. The main school building will be located on the middle portion of the site slightly further back on the site than the current main building of the School. It is anticipated that extensive phasing will be required with the school remaining fully operational during the construction period. By facilitating a phased development, a portion of the new school buildings are constructed on part of the footprint of the existing school buildings. This allows for a more efficient use of the site with no diversion of the mains sewer necessary. The estimated programme for the construction period is of the order of 30 months (overall incl pre-construction is 35 months approx). Full details will be provided in the ITT documentation.
Lot Information
Lot 1
The project is for the design, supply, delivery, receiving, off-loading, setting into position, fixing, erection, building testing, commissioning and finishing in every respect of the new Post-Primary School for 670 pupils to include external hard play, synthetic and grass pitches, tennis courts, Sports Hall, School Meals Accommodation, car and bus parking and drop-off and a new entrance onto Donard View Road. The design has been completed to RIBA Stage 3. The successful IST will be responsible for completing RIBA Stage 4 onwards. It is proposed to construct the new school on the existing site with the grass pitches being developed on a newly purchased site adjacent to the existing. There are no established site services on the additional site. The main school building will be located on the middle portion of the site slightly further back on the site than the current main building of the School. It is anticipated that extensive phasing will be required with the school remaining fully operational during the construction period. By facilitating a phased development, a portion of the new school buildings are constructed on part of the footprint of the existing school buildings. This allows for a more efficient use of the site with no diversion of the mains sewer necessary. The estimated programme for the construction period is of the order of 30 months (overall incl pre-construction is 35 months approx). Full details will be provided in the ITT documentation.
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-h6vhtk-02fe83
- Publication Source
- Find A Tender Service
- Latest Notice
- https://www.find-tender.service.gov.uk/Notice/030476-2021
- Current Stage
- Award
- All Stages
- Award
Procurement Classification
- Notice Type
- Award Notice
- Procurement Type
- Standard
- Procurement Category
- Works
- Procurement Method
- Selective
- Procurement Method Details
- Restricted procedure
- Tender Suitability
- Not specified
- Awardee Scale
- Large
Common Procurement Vocabulary (CPV)
- CPV Divisions
45 - Construction work
-
- CPV Codes
45210000 - Building construction work
45214200 - Construction work for school buildings
45214220 - Secondary school construction work
45310000 - Electrical installation work
45351000 - Mechanical engineering installation works
Notice Value(s)
- Tender Value
- Not specified
- Lots Value
- Not specified
- Awards Value
- Not specified
- Contracts Value
- £20,599,220 £10M-£100M
Notice Dates
- Publication Date
- 8 Dec 20214 years ago
- Submission Deadline
- Not specified
- Future Notice Date
- Not specified
- Award Date
- 26 Nov 20214 years ago
- Contract Period
- Not specified - Not specified
- Recurrence
- Not specified
Notice Status
- Tender Status
- Complete
- Lots Status
- Cancelled
- Awards Status
- Active
- Contracts Status
- Active
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- THE TRUSTEES OF NEW-BRIDGE INTEGRATED COLLEGE
- Contact Name
- Construct.Info
- Contact Email
- construct.info@finance-ni.gov.uk
- Contact Phone
- +44 2890816555
Buyer Location
- Locality
- BANBRIDGE
- Postcode
- BT32 3LN
- Post Town
- Northern Ireland
- Country
- Northern Ireland
-
- Major Region (ITL 1)
- TLN Northern Ireland
- Basic Region (ITL 2)
- TLN0 Northern Ireland
- Small Region (ITL 3)
- TLN07 Armagh City, Banbridge and Craigavon
- Delivery Location
- TLN0 Northern Ireland
-
- Local Authority
- Armagh City, Banbridge and Craigavon
- Electoral Ward
- Loughbrickland
- Westminster Constituency
- South Down
Further Information
Open Contracting Data Standard (OCDS)
View full OCDS Record for this contracting process
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.
{
"tag": [
"compiled"
],
"id": "ocds-h6vhtk-02fe83-2021-12-08T10:25:02Z",
"date": "2021-12-08T10:25:02Z",
"ocid": "ocds-h6vhtk-02fe83",
"initiationType": "tender",
"tender": {
"id": "ocds-h6vhtk-02fe83",
"legalBasis": {
"id": "32014L0024",
"scheme": "CELEX"
},
"title": "DE2957529 Appointment of an IST for New-Bridge Integrated College Loughbrickland",
"status": "complete",
"classification": {
"scheme": "CPV",
"id": "45310000",
"description": "Electrical installation work"
},
"mainProcurementCategory": "works",
"description": "The project is for the design, supply, delivery, receiving, off-loading, setting into position, fixing, erection, building testing, commissioning and finishing in every respect of the new Post-Primary School for 670 pupils to include external hard play, synthetic and grass pitches, tennis courts, Sports Hall, School Meals Accommodation, car and bus parking and drop-off and a new entrance onto Donard View Road. The design has been completed to RIBA Stage 3. The successful IST will be responsible for completing RIBA Stage 4 onwards. It is proposed to construct the new school on the existing site with the grass pitches being developed on a newly purchased site adjacent to the existing. There are no established site services on the additional site. The main school building will be located on the middle portion of the site slightly further back on the site than the current main building of the School. It is anticipated that extensive phasing will be required with the school remaining fully operational during the construction period. By facilitating a phased development, a portion of the new school buildings are constructed on part of the footprint of the existing school buildings. This allows for a more efficient use of the site with no diversion of the mains sewer necessary. The estimated programme for the construction period is of the order of 30 months (overall incl pre-construction is 35 months approx). Full details will be provided in the ITT documentation.",
"lots": [
{
"id": "1",
"description": "The project is for the design, supply, delivery, receiving, off-loading, setting into position, fixing, erection, building testing, commissioning and finishing in every respect of the new Post-Primary School for 670 pupils to include external hard play, synthetic and grass pitches, tennis courts, Sports Hall, School Meals Accommodation, car and bus parking and drop-off and a new entrance onto Donard View Road. The design has been completed to RIBA Stage 3. The successful IST will be responsible for completing RIBA Stage 4 onwards. It is proposed to construct the new school on the existing site with the grass pitches being developed on a newly purchased site adjacent to the existing. There are no established site services on the additional site. The main school building will be located on the middle portion of the site slightly further back on the site than the current main building of the School. It is anticipated that extensive phasing will be required with the school remaining fully operational during the construction period. By facilitating a phased development, a portion of the new school buildings are constructed on part of the footprint of the existing school buildings. This allows for a more efficient use of the site with no diversion of the mains sewer necessary. The estimated programme for the construction period is of the order of 30 months (overall incl pre-construction is 35 months approx). Full details will be provided in the ITT documentation.",
"awardCriteria": {
"criteria": [
{
"name": "QUALITY",
"type": "quality",
"description": "45"
},
{
"name": "PRICE",
"type": "cost",
"description": "55"
}
]
},
"hasOptions": false,
"status": "cancelled"
}
],
"items": [
{
"id": "1",
"additionalClassifications": [
{
"scheme": "CPV",
"id": "45214200",
"description": "Construction work for school buildings"
},
{
"scheme": "CPV",
"id": "45214220",
"description": "Secondary school construction work"
},
{
"scheme": "CPV",
"id": "45210000",
"description": "Building construction work"
},
{
"scheme": "CPV",
"id": "45351000",
"description": "Mechanical engineering installation works"
}
],
"deliveryAddresses": [
{
"region": "UKN0"
}
],
"relatedLot": "1"
}
],
"procurementMethod": "selective",
"procurementMethodDetails": "Restricted procedure",
"coveredBy": [
"GPA"
],
"reviewDetails": "This procurement is governed by the Public Contracts Regulations 2015 and. provides for economic operators who have suffered or who risk suffering loss or damage as a consequence of an alleged breach of the. duty owed in accordance with Regulation 91 to start proceedings in the High Court.. . A standstill period will commence at the point. information on the award of the contract is communicated to tenderers. That notification will provide information on the award decision.. The standstill period, which will be for a minimum of 10 calendar days, provides time for unsuccessful tenderers to challenge the award. decision before the contract is entered into.. . Any proceedings relating to any perceived non-compliance with the relevant law must be. started within 30 days, beginning with the date when the economic operator first knew, or ought to have known that grounds for starting. the proceedings had arisen. (A court may extend the time limit to 3 months, where the court considers that there is a good reason for. doing so).."
},
"awards": [
{
"id": "030476-2021-1-1",
"relatedLots": [
"1"
],
"title": "Contract",
"status": "active",
"suppliers": [
{
"id": "GB-FTS-37081",
"name": "GANSON UK LTD"
}
]
}
],
"parties": [
{
"id": "GB-FTS-37080",
"name": "The Trustees of New-Bridge Integrated College",
"identifier": {
"legalName": "The Trustees of New-Bridge Integrated College"
},
"address": {
"streetAddress": "25 Donard View Rd, Loughbrickland",
"locality": "Banbridge",
"region": "UK",
"postalCode": "BT32 3LN",
"countryName": "United Kingdom"
},
"contactPoint": {
"name": "Construct.Info",
"telephone": "+44 2890816555",
"email": "Construct.Info@finance-ni.gov.uk"
},
"roles": [
"buyer",
"centralPurchasingBody"
],
"details": {
"url": "https://etendersni.gov.uk/epps",
"buyerProfile": "https://etendersni.gov.uk/epps",
"classifications": [
{
"scheme": "TED_CA_TYPE",
"id": "BODY_PUBLIC",
"description": "Body governed by public law"
},
{
"scheme": "COFOG",
"id": "09",
"description": "Education"
}
]
}
},
{
"id": "GB-FTS-37081",
"name": "GANSON UK LTD",
"identifier": {
"legalName": "GANSON UK LTD"
},
"address": {
"streetAddress": "Clarmont Avenue",
"locality": "Newry",
"region": "UK",
"postalCode": "BT31 9BX",
"countryName": "United Kingdom"
},
"contactPoint": {
"email": "gerard@gansonuk.co.uk"
},
"roles": [
"supplier"
],
"details": {
"url": "https://etendersni.gov.uk/epps",
"scale": "large"
}
},
{
"id": "GB-FTS-37082",
"name": "Department of Finance, Construction Procurement Delivery Procurement Operations Branch",
"identifier": {
"legalName": "Department of Finance, Construction Procurement Delivery Procurement Operations Branch"
},
"address": {
"locality": "Belfast",
"countryName": "United Kingdom"
},
"roles": [
"reviewBody"
]
}
],
"buyer": {
"id": "GB-FTS-37080",
"name": "The Trustees of New-Bridge Integrated College"
},
"contracts": [
{
"id": "030476-2021-1-1",
"awardID": "030476-2021-1-1",
"title": "Contract",
"status": "active",
"value": {
"amount": 20599220,
"currency": "GBP"
},
"dateSigned": "2021-11-26T00:00:00Z"
}
],
"bids": {
"statistics": [
{
"id": "1",
"measure": "bids",
"relatedLot": "1",
"value": 8
},
{
"id": "2",
"measure": "smeBids",
"relatedLot": "1",
"value": 1
},
{
"id": "3",
"measure": "foreignBidsFromEU",
"relatedLot": "1",
"value": 0
},
{
"id": "4",
"measure": "foreignBidsFromNonEU",
"relatedLot": "1",
"value": 1
},
{
"id": "5",
"measure": "electronicBids",
"relatedLot": "1",
"value": 8
}
]
},
"links": [
{
"rel": "prev",
"href": "https://ted.europa.eu/udl?uri=TED:NOTICE:320302-2020:TEXT:EN:HTML"
}
],
"language": "en"
}