Pumped Storage Hydro Project in Scotland, UK.
Notice Description
Expressions of interest are sought from globally experienced pump storage power station designers and construction execution companies & consortia who have proven capabilities to deliver a new build 600MW Pumped Storage Hydro Project in Scotland, UK. Geotechnical investigations commence from Q4 2022 in support of a FEED study and eventual detailed design works. The construction phase starts in Q4 2025. Project Description; The physical construction works include the construction of a new intake structure within an operational upper reservoir connected via new hydraulic tunnel systems to the powerhouse complex excavated in quartz dolorite rock 400m below ground level. The powerhouse will be a series of underground caverns containing reversible pump-turbines, motor-generators and associated equipment including transformers and switchgear. A new tailrace tunnel will be constructed from the powerhouse to a new outfall structure in an existing lower reservoir. A vertical ventilation shaft from the powerhouse will connect through to an expanded existing above ground sub-station complex. A new 1.45km main access tunnel will link the powerhouse to a new jetty constructed along the lower reservoir. Forming the main access tunnel portal will require the diversion of a trunk road. The construction spoil is planned to be taken out through the mountain to the jetty and stored prior to off-site removal. New administration and workshop buildings will be built on the jetty. Existing access roads will be upgraded together with the construction of new roads as required.
Lot Information
Lot 1
Expressions of interest are sought from globally experienced pump storage power station designers and construction execution companies & consortia who have proven capabilities to deliver a new build 600MW Pumped Storage Hydro Project in Scotland, UK. Geotechnical investigations commence from Q4 2022 in support of a FEED study and eventual detailed design works. The construction phase starts in Q4 2025. Project Description; The physical construction works include the construction of a new intake structure within an operational upper reservoir connected via new hydraulic tunnel systems to the powerhouse complex excavated in quartz dolorite rock 400m below ground level. The powerhouse will be a series of underground caverns containing reversible pump-turbines, motor-generators and associated equipment including transformers and switchgear. A new tailrace tunnel will be constructed from the powerhouse to a new outfall structure in an existing lower reservoir. A vertical ventilation shaft from the powerhouse will connect through to an expanded existing above ground sub-station complex. A new 1.45km main access tunnel will link the powerhouse to a new jetty constructed along the lower reservoir. Forming the main access tunnel portal will require the diversion of a trunk road. The construction spoil is planned to be taken out through the mountain to the jetty and stored prior to off-site removal. New administration and workshop buildings will be built on the jetty. Existing access roads will be upgraded together with the construction of new roads as required.
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-h6vhtk-035728
- Publication Source
- Find A Tender Service
- Latest Notice
- https://www.find-tender.service.gov.uk/Notice/020708-2022
- Current Stage
- Planning
- All Stages
- Planning
Procurement Classification
- Notice Type
- Planning Notice
- Procurement Type
- Standard
- Procurement Category
- Works
- Procurement Method
- Not Specified
- Procurement Method Details
- Not specified
- Tender Suitability
- Not specified
- Awardee Scale
- Not specified
Common Procurement Vocabulary (CPV)
- CPV Divisions
45 - Construction work
-
- CPV Codes
45220000 - Engineering works and construction works
Notice Value(s)
- Tender Value
- Not specified
- Lots Value
- Not specified
- Awards Value
- Not specified
- Contracts Value
- Not specified
Notice Dates
- Publication Date
- 28 Jul 20223 years ago
- Submission Deadline
- Not specified
- Future Notice Date
- 6 Oct 2022Expired
- Award Date
- Not specified
- Contract Period
- Not specified - Not specified
- Recurrence
- Not specified
Notice Status
- Tender Status
- Planned
- Lots Status
- Planned
- Awards Status
- Not Specified
- Contracts Status
- Not Specified
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- DRAX POWER LTD
- Contact Name
- Not specified
- Contact Email
- enquiries.capprojects@drax.com
- Contact Phone
- +44 1757618381
Buyer Location
- Locality
- SELBY
- Postcode
- YO8 9PH
- Post Town
- York
- Country
- England
-
- Major Region (ITL 1)
- TLE Yorkshire and The Humber
- Basic Region (ITL 2)
- TLE2 North Yorkshire
- Small Region (ITL 3)
- TLE22 North Yorkshire
- Delivery Location
- TLM63 Lochaber, Skye and Lochalsh, Arran and Cumbrae, and Argyll and Bute
-
- Local Authority
- North Yorkshire
- Electoral Ward
- Thorpe Willoughby & Hambleton
- Westminster Constituency
- Selby
Further Information
Open Contracting Data Standard (OCDS)
View full OCDS Record for this contracting process
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.
{
"tag": [
"compiled"
],
"id": "ocds-h6vhtk-035728-2022-07-28T19:14:07+01:00",
"date": "2022-07-28T19:14:07+01:00",
"ocid": "ocds-h6vhtk-035728",
"description": "Expressions of interest are sought from globally experienced pump storage power station designers and construction execution companies & consortia who have proven capabilities to deliver a new build 600MW Pumped Storage Hydro Project in Scotland, UK. This is a broad request for services and contractor capability. We are looking for companies to provide Owners Engineer support during FEED stages and beyond, also contractors with the capabilities to complete a project as described whether in consortium or individually. please use the e-mail Enquiries.CapProjects@drax.com for further information or to submit your interest. (MT Ref:226936)",
"initiationType": "tender",
"tender": {
"id": "ocds-h6vhtk-035728",
"legalBasis": {
"id": "32014L0024",
"scheme": "CELEX"
},
"title": "Pumped Storage Hydro Project in Scotland, UK.",
"status": "planned",
"classification": {
"scheme": "CPV",
"id": "45220000",
"description": "Engineering works and construction works"
},
"mainProcurementCategory": "works",
"description": "Expressions of interest are sought from globally experienced pump storage power station designers and construction execution companies & consortia who have proven capabilities to deliver a new build 600MW Pumped Storage Hydro Project in Scotland, UK. Geotechnical investigations commence from Q4 2022 in support of a FEED study and eventual detailed design works. The construction phase starts in Q4 2025. Project Description; The physical construction works include the construction of a new intake structure within an operational upper reservoir connected via new hydraulic tunnel systems to the powerhouse complex excavated in quartz dolorite rock 400m below ground level. The powerhouse will be a series of underground caverns containing reversible pump-turbines, motor-generators and associated equipment including transformers and switchgear. A new tailrace tunnel will be constructed from the powerhouse to a new outfall structure in an existing lower reservoir. A vertical ventilation shaft from the powerhouse will connect through to an expanded existing above ground sub-station complex. A new 1.45km main access tunnel will link the powerhouse to a new jetty constructed along the lower reservoir. Forming the main access tunnel portal will require the diversion of a trunk road. The construction spoil is planned to be taken out through the mountain to the jetty and stored prior to off-site removal. New administration and workshop buildings will be built on the jetty. Existing access roads will be upgraded together with the construction of new roads as required.",
"lots": [
{
"id": "1",
"description": "Expressions of interest are sought from globally experienced pump storage power station designers and construction execution companies & consortia who have proven capabilities to deliver a new build 600MW Pumped Storage Hydro Project in Scotland, UK. Geotechnical investigations commence from Q4 2022 in support of a FEED study and eventual detailed design works. The construction phase starts in Q4 2025. Project Description; The physical construction works include the construction of a new intake structure within an operational upper reservoir connected via new hydraulic tunnel systems to the powerhouse complex excavated in quartz dolorite rock 400m below ground level. The powerhouse will be a series of underground caverns containing reversible pump-turbines, motor-generators and associated equipment including transformers and switchgear. A new tailrace tunnel will be constructed from the powerhouse to a new outfall structure in an existing lower reservoir. A vertical ventilation shaft from the powerhouse will connect through to an expanded existing above ground sub-station complex. A new 1.45km main access tunnel will link the powerhouse to a new jetty constructed along the lower reservoir. Forming the main access tunnel portal will require the diversion of a trunk road. The construction spoil is planned to be taken out through the mountain to the jetty and stored prior to off-site removal. New administration and workshop buildings will be built on the jetty. Existing access roads will be upgraded together with the construction of new roads as required.",
"status": "planned"
}
],
"items": [
{
"id": "1",
"additionalClassifications": [
{
"scheme": "CPV",
"id": "45220000",
"description": "Engineering works and construction works"
}
],
"deliveryAddresses": [
{
"region": "UKM63"
}
],
"deliveryLocation": {
"description": "Scotland"
},
"relatedLot": "1"
}
],
"communication": {
"futureNoticeDate": "2022-10-07T00:00:00+01:00"
}
},
"parties": [
{
"id": "GB-FTS-60179",
"name": "Drax Power Ltd",
"identifier": {
"legalName": "Drax Power Ltd"
},
"address": {
"streetAddress": "Drax Power Station",
"locality": "Selby",
"region": "UK",
"postalCode": "YO8 9PH",
"countryName": "United Kingdom"
},
"contactPoint": {
"telephone": "+44 1757618381",
"email": "Enquiries.CapProjects@drax.com"
},
"roles": [
"buyer",
"centralPurchasingBody"
],
"details": {
"url": "http://www.drax.com",
"buyerProfile": "https://www.mytenders.co.uk/search/Search_AuthProfile.aspx?ID=AA43133",
"classifications": [
{
"scheme": "TED_CA_TYPE",
"description": "Private company"
},
{
"scheme": "COFOG",
"description": "Power generation"
}
]
}
}
],
"buyer": {
"id": "GB-FTS-60179",
"name": "Drax Power Ltd"
},
"language": "en"
}