Notice Information
Notice Title
National Contractor Framework
Notice Description
Alder Hey Children's Hospital NHS Foundation Trust as the Contracting Authority in partnership with Procure Partnerships has let a National Contractor Framework with a maximum duration of four years, which may be used to award contracts by public sector bodies / 'Contracting Authorities' as defined by the Public Contracts Regulations 2015. The Framework is designed to align with the ambitions of the Construction Playbook, and to help the public sector deliver on the Government's ambition to 'build back better' bringing together commercial best practice and reform to drive better, faster, greener delivery. Potential Framework users may include Schools, Academies, Colleges, Universities, Blue Light/Emergency Services, NHS Bodies, Local Authorities, Health and Social Care Bodies, Housing Associations, Libraries and Museums, Registered Charities, Government Departments, Leisure Providers, Clinical Commissioning Groups; as more particularly set out in the Contract Notice 2023/S 000-010899 and the subsequent corrigendum notice ref: 2023/S 000-014178 published on 18th May 2023. Users of the Framework will be able to procure works with associated services (e.g. new build, refurbishment, fit out, infrastructure, single site/project works or multisite projects/ programmes of works) thereunder on the basis of established fixed Contractor overhead and profit rates, and hourly rates. Projects may be of Design and Build or Build Only in nature, under a Two Stage or Single Stage procurement route, embracing both NEC and JCT forms of contract, in compliance with the restrictions on and full freedoms for the range of works and building types provided by the CPV codes referenced. CPV codes 71000000 and 44000000 are to be taken as being covered by this procurement only in context of delivering 4500000 construction works. On the same basis, the Framework includes infrastructure works Lots; construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork. The framework also includes decarbonisation and demolition. Please note details of economic operators provided in this notice refer to their registered address which may differ from their operational address for the purpose of delivering works under this framework. For the avoidance of doubt and as previously communicated, the contract will be concluded in the name of Alder Hey Children's NHS Foundation Trust. Alder Hey is the public sector legal entity responsible for hosting the tender process related to the framework award and, on behalf of Alder Hey, Procure Partnerships will manage the operational running of the framework.
Lot Information
1. Construction - North East - PS50k to PS1m
Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
2. Construction - North East - PS1m to PS5mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
3. Construction - North East - PS5m to PS15mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
4. Construction - North East - PS15m to PS30mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
5. Construction - North East - PS30m+Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
6. Construction - Yorkshire - PS50k to PS1mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
7. Construction - Yorkshire - PS1m to PS5mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
8. Construction - Yorkshire - PS5m to PS15mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
9. Construction - Yorkshire - PS15m to PS30mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
10. Construction - Yorkshire - PS30m+Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
11. Construction - West Midlands - PS50k to PS1mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
12. Construction - West Midlands - PS1m to PS5mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
13. Construction - West Midlands - PS5m to PS15mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot. Additional information: Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
14. Construction - West Midlands - PS15m to PS30mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
15. Construction - West Midlands - PS30m+Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
16. Construction - East Midlands - PS50k to PS1mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
17. Construction - East Midlands - PS1m to PS5mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
18. Construction - East Midlands - PS5m to PS15mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
19. Construction - East Midlands - PS15m to PS30mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
20. Construction - East Midlands - PS30m+Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
21. Construction - East of England - PS50k to PS1mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
22. Construction - East of England - PS1m to PS5mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
23. Construction - East of England - PS5m to PS15mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
24. Construction - East of England - PS15m to PS30mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
25. Construction - East of England - PS30m+Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
26. Construction - South East - PS50k to PS1mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
27. Construction - South East - PS1m to PS5mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
28. Construction - South East - PS5m to PS15mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
29. Construction - South East - PS15m to PS30mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
30. Construction - South East - PS30m+Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
31. Construction - London - PS50k to PS1mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
32. Construction - London - PS1m to PS5mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
33. Construction - London - PS5m to PS15mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
34. Construction - London - PS15m to PS30mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
35. Construction - London - PS30m+Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
36. Construction - South West - PS50k to PS1mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
37. Construction - South West - PS1m to PS5mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
38. Construction - South West - PS5m to PS15mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
39. Construction - South West - PS15m to PS30mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
40. Construction - South West - PS30m+Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
41. Decarbonisation and Retrofit - North East - PS50k to PS1mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
42. Decarbonisation and Retrofit - North East - PS1m to PS5mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
43. Decarbonisation and Retrofit - North East - PS5m to PS15mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
44. Decarbonisation and Retrofit - North East - PS15m+Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
45. Decarbonisation and Retrofit - Yorkshire - PS50k to PS1mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
46. Decarbonisation and Retrofit - Yorkshire - PS1m to PS5mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
47. Decarbonisation and Retrofit - Yorkshire - PS5m to PS15mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
48. Decarbonisation and Retrofit - Yorkshire - PS15m+Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
49. Decarbonisation and Retrofit - North West - PS50k to PS1mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
50. Decarbonisation and Retrofit - North West - PS1m to PS5mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
51. Decarbonisation and Retrofit - North West - PS5m to PS15mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
52. Decarbonisation and Retrofit - North West - PS15m+Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
53. Decarbonisation and Retrofit - West Midlands - PS50k to PS1mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
54. Decarbonisation and Retrofit - West Midlands - PS1m to PS5mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
55. Decarbonisation and Retrofit - West Midlands - PS5m to PS15mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
56. Decarbonisation and Retrofit - West Midlands - PS15m+Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
57. Decarbonisation and Retrofit - East Midlands - PS50k to PS1mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
58. Decarbonisation and Retrofit - East Midlands - PS1m to PS5mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
59. Decarbonisation and Retrofit - East Midlands - PS5m to PS15mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
60. Decarbonisation and Retrofit - East Midlands - PS15m+Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
61. Decarbonisation and Retrofit - East of England - PS50k to PS1mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
62. Decarbonisation and Retrofit - East of England - PS1m to PS5mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
63. Decarbonisation and Retrofit - East of England - PS5m to PS15mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
64. Decarbonisation and Retrofit - East of England - PS15m+Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
65. Decarbonisation and Retrofit - South East - PS50k to PS1mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
66. Decarbonisation and Retrofit - South East - PS1m to PS5mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
67. Decarbonisation and Retrofit - South East - PS5m to PS15mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
68. Decarbonisation and Retrofit - South East - PS15m+Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
69. Decarbonisation and Retrofit - London - PS50k to PS1mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
70. Decarbonisation and Retrofit - London - PS1m to PS5mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
71. Decarbonisation and Retrofit - London - PS5m to PS15mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
72. Decarbonisation and Retrofit - London - PS15m+Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
73. Decarbonisation and Retrofit - South West - PS50k to PS1mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
74. Decarbonisation and Retrofit - South West - PS1m to PS5mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
75. Decarbonisation and Retrofit - South West - PS5m to PS15mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
76. Decarbonisation and Retrofit - South West - PS15m+Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
77. Demolition and Site Preparation - North East - PS50k to PS1mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
78. Demolition and Site Preparation - North East - PS1m to PS5mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
79. Demolition and Site Preparation - North East - PS5m to PS15mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
80. Demolition and Site Preparation - North East - PS15m+Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
81. Demolition and Site Preparation - Yorkshire - PS50k to PS1mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
82. Demolition and Site Preparation - Yorkshire - PS1m to PS5mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
83. Demolition and Site Preparation - Yorkshire - PS5m to PS15mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
84. Demolition and Site Preparation - Yorkshire - PS15m+Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
85. Demolition and Site Preparation - North West - PS50k to PS1mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
86. Demolition and Site Preparation - North West - PS1m to PS5mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
87. Demolition and Site Preparation - North West - PS5m to PS15mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
88. Demolition and Site Preparation - North West - PS15m+Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
89. Demolition and Site Preparation - West Midlands - PS50k to PS1mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
90. Demolition and Site Preparation - West Midlands - PS1m to PS5mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
91. Demolition and Site Preparation - West Midlands - PS5m to PS15mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
92. Demolition and Site Preparation - West Midlands - PS15m+Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
93. Demolition and Site Preparation - East Midlands - PS50k to PS1mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
94. Demolition and Site Preparation - East Midlands - PS1m to PS5mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
95. Demolition and Site Preparation - East Midlands - PS5m to PS15mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
96. Demolition and Site Preparation - East Midlands - PS15m+Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
97. Demolition and Site Preparation - East of England - PS50k to PS1mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
98. Demolition and Site Preparation - East of England - PS1m to PS5mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
99. Demolition and Site Preparation - East of England - PS5m to PS15mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
100. Demolition and Site Preparation - East of England - PS15m+Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
101. Demolition and Site Preparation - South East - PS50k to PS1mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
102. Demolition and Site Preparation - South East - PS1m to PS5mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
103. Demolition and Site Preparation - South East - PS5m to PS15mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
104. Demolition and Site Preparation - South East - PS15m+Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
105. Demolition and Site Preparation - London - PS50k to PS1mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
106. Demolition and Site Preparation - London - PS1m to PS5mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
107. Demolition and Site Preparation - London - PS5m to PS15mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
108. Demolition and Site Preparation - London - PS15m+Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
109. Demolition and Site Preparation - South West - PS50k to PS1mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
110. Demolition and Site Preparation - South West - PS1m to PS5mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
111. Demolition and Site Preparation - South West - PS5m to PS15mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
112. Demolition and Site Preparation - South West - PS15m+Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
113. Housing - North East - PS1m to PS5mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
114. Housing - North East - PS5m to PS15mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
115. Housing - North East - PS15m+Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
116. Housing - Yorkshire - PS1m to PS5mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
117. Housing - Yorkshire - PS5m to PS15mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
118. Housing - Yorkshire - PS15m+Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
119. Housing - North West - PS1m to PS5mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
120. Housing - North West - PS5m to PS15mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
121. Housing - North West - PS15m+Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
122. Housing - West Midlands - PS1m to PS5mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
123. Housing - West Midlands - PS5m to PS15mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
124. Housing - West Midlands - PS15m+Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
125. Housing - East Midlands - PS1m to PS5mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
126. Housing - East Midlands - PS5m to PS15mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
127. Housing - East Midlands - PS15m+Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
128. Housing - East of England - PS1m to PS5mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
129. Housing - East of England - PS5m to PS15mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
130. Housing - East of England - PS15m+Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
131. Housing - South East - PS1m to PS5mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
132. Housing - South East - PS5m to PS15mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
133. Housing - South East - PS15m+Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
134. Housing - London - PS1m to PS5mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
135. Housing - London - PS5m to PS15mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
136. Housing - London - PS15m+Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
137. Housing - South West - PS1m to PS5mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
138. Housing - South West - PS5m to PS15mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
139. Housing - South West - PS15m+Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
140. Infrastructure - North East - PS1m to PS5mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
141. Infrastructure - North East - PS5m to PS15mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
142. Infrastructure - North East - PS15m to PS30mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
143. Infrastructure - North East - PS30m+Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
144. Infrastructure - Yorkshire - PS1m to PS5mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
145. Infrastructure - Yorkshire - PS5m to PS15mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
146. Infrastructure - Yorkshire - PS15m to PS30mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
147. Infrastructure - Yorkshire - PS30m+Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
148. Infrastructure - West Midlands - PS1m to PS5mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
149. Infrastructure - West Midlands - PS5m to PS15mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
150. Infrastructure - West Midlands - PS15m to PS30mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
151. Infrastructure - West Midlands - PS30m+Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
152. Infrastructure - East Midlands - PS1m to PS5mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
153. Infrastructure - East Midlands - PS5m to PS15mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
154. Infrastructure - East Midlands - PS15m to PS30mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
155. Infrastructure - East Midlands - PS30m+Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
156. Infrastructure - East of England - PS1m to PS5mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
157. Infrastructure - East of England - PS5m to PS15mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
158. Infrastructure - East of England - PS15m to PS30mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
159. Infrastructure - East of England - PS30m+Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
160. Infrastructure - South East - PS1m to PS5mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
161. Infrastructure - South East - PS5m to PS15mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
162. Infrastructure - South East- PS15m to PS30mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
163. Infrastructure - South East- PS30m+Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
164. Infrastructure - London - PS1m to PS5mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
165. Infrastructure - London - PS5m to PS15mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
166. Infrastructure - London - PS15m to PS30mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
167. Infrastructure - London - PS30m+Potential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
168. Infrastructure - South West - PS1m to PS5mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
169. Infrastructure - South West - PS5m to PS15mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
170. Infrastructure - South West - PS15m to PS30mPotential Framework users will define the nature and scope of the call-off within the parameters of the Framework / Lot.
171. Infrastructure - South West - PS30m+Users of the Framework will be able to procure works with associated services (e.g.,new build, refurbishment, fit out, single site/project works or multi site projects/programmes of works) thereunder on the basis of established fixed Contractor overhead and profit rates, and hourly rates. Projects may be of Design and Build or Build Only in nature, under a Direct Award, Two Stage or Single Stage procurement route, embracing both NEC and JCT forms of contract, in compliance with the restrictions on and full freedoms for the range of works and building types provided by the CPV codes referenced. Public sector clients / Framework users will define the nature and scope of each call-off within the parameters of the Framework lot. No guarantees can be provided as to the quantity of call-off s which may utilise this Lot for the duration of the framework. Potential Framework users may include Schools, Academies, Colleges, Universities, Blue Light/Emergency Services, NHS Bodies, Local Authorities, Health and Social Care Bodies, Housing Associations, Libraries and Museums, Registered Charities, Government Departments, Leisure Providers, Clinical Commissioning Groups; as more particularly set out in the Contract Notice 2023/S 000-010899 and the subsequent corrigendum notice ref: 2023/S 000-014178 published on 18th May 2023. Due to the size of this contract award notice and some technical difficulties with publishing it, the successful suppliers by lot and region can be found here - www.procurepartnerships.co.uk For the avoidance of doubt and as previously communicated, the contract will be concluded in the name of Alder Hey Children's NHS Foundation Trust. Alder Hey is the public sector legal entity responsible for hosting the tender process related to the framework award and, on behalf of Alder Hey, Procure Partnerships will manage the operational running of the framework.
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-h6vhtk-038daf
- Publication Source
- Find A Tender Service
- Latest Notice
- https://www.find-tender.service.gov.uk/Notice/026092-2023
- Current Stage
- Award
- All Stages
- Planning, Tender, Award
Procurement Classification
- Notice Type
- Planning Notice
- Procurement Type
- Framework
- Procurement Category
- Works
- Procurement Method
- Open
- Procurement Method Details
- Open procedure
- Tender Suitability
- Not specified
- Awardee Scale
- Large, SME
Common Procurement Vocabulary (CPV)
- CPV Divisions
71 - Architectural, construction, engineering and inspection services
-
- CPV Codes
44000000 - Construction structures and materials; auxiliary products to construction (except electric apparatus)
45000000 - Construction work
45100000 - Site preparation work
45112730 - Landscaping work for roads and motorways
45210000 - Building construction work
45213312 - Car park building construction work
45220000 - Engineering works and construction works
45221000 - Construction work for bridges and tunnels, shafts and subways
45223000 - Structures construction work
45230000 - Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
45243000 - Coastal-defence works
45246000 - River regulation and flood control works
45260000 - Roof works and other special trade construction works
45300000 - Building installation work
45316000 - Installation work of illumination and signalling systems
45400000 - Building completion work
45500000 - Hire of construction and civil engineering machinery and equipment with operator
70112000 - Development of non-residential real estate
70120000 - Buying and selling of real estate
70322000 - Vacant-land rental or sale services
71000000 - Architectural, construction, engineering and inspection services
Notice Value(s)
- Tender Value
- £8,000,000,000 £1B-£10B
- Lots Value
- Not specified
- Awards Value
- Not specified
- Contracts Value
- £8,000,000,000 £1B-£10B
Notice Dates
- Publication Date
- 4 Sep 20232 years ago
- Submission Deadline
- 6 Jun 2023Expired
- Future Notice Date
- 20 Mar 2023Expired
- Award Date
- 8 Aug 20233 years ago
- Contract Period
- Not specified - Not specified
- Recurrence
- Estimated timing for further notices to be published: Activity for the re-procurement of the framework is likely to commence 12 months prior to the framework expiry.
Notice Status
- Tender Status
- Complete
- Lots Status
- Active, Cancelled
- Awards Status
- Active
- Contracts Status
- Active
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- Alder Hey Children's NHS Foundation Trust
- Contact Name
- Available with D3 Tenders Premium →
- Contact Email
- Available with D3 Tenders Premium →
- Contact Phone
- Available with D3 Tenders Premium →
Buyer Location
- Locality
- LIVERPOOL
- Postcode
- L12 2AP
- Postcode Area
- Liverpool
- Country
- England
-
- Major Region (ITL 1)
- TLD North West (England)
- Basic Region (ITL 2)
- TLD7 Merseyside
- Small Region (ITL 3)
- TLD72 Liverpool
- Delivery Location
- TLC North East (England), TLD North West (England), TLE Yorkshire and The Humber, TLF East Midlands (England), TLG West Midlands (England), TLH East (England), TLI London, TLJ South East (England), TLK South West (England)
-
- Local Authority
- Liverpool
- Electoral Ward
- Sandfield Park
- Westminster Constituency
- Liverpool West Derby
Supplier Information
- Number of Suppliers
- 87
- Supplier Names
Buxton Building Contractors Ltd
Cheetham Hill Construction Ltd
City Demolition Contractors (Birmingham) Limited
Compass Developments (NE) Limited
Concept Interiors Management Ltd
Danaher & Walsh (Civil Engineering) Ltd
Eric Wright Civil Engineering Ltd
G F Tomlinson Building Limited
GRAHAM Asset Management Ltd t/a GRAHAM Facilities Management
Henry Boot Construction Limited
Illingworth and Gregory Ltd (sewell)
John Graham Construction Limited
Key Construction (Midlands) Limited
Kind & Company (Builders) Limited
Morris and Spottiswood Limited
P Casey (Land Reclamation) Limited
Rhodar Industrial Services Limited
Robertson Construction Group Limited
Speller Metcalfe Malvern Limited
Further Information
Open Contracting Data Standard (OCDS)
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.