Notice Information
Notice Title
Greener Futures Partnership Decarbonisation Delivery Framework
Notice Description
Greener Futures Partnerships (GFP) have procured a National framework of suitably qualified constructors and consultants for the delivery of retrofit works and services. As well as creating a route to market, GFP aspired to create a truly collaborative framework where all parties contribute and continually develop best practice in the field of decarbonisation. The Framework will be for a total of 7 years (4+3) to enable delivery of the works supported by the Social Housing Decarbonisation Fund and will be open to all Contracting Authorities in England and Wales to access. GFP are also procuring a separate Decarbonisation Delivery Framework for the delivery of retrofit works and services in Scotland, which is the subject of a separate Contract Notice and procurement process conducted in accordance with the Public Contracts Regulations (Scotland) 2015. Abri acted as the CA for the purposes of this procurement who will enter into the Framework Agreement with successful Suppliers.
Lot Information
Construction Works (up to PS5m) North England & North Wales
Lot 1a covered Decarbonisation Construction works up to PS5m in North England and North Wales. Work under this Lot 1 could include Solar PV and Battery, Heat Pumps, Electric Heaters, Heat and Hot Water Controller, Mechanical Extract, Solid Floor Insulation, Low Energy, Lighting, Internal Wall Insulation, Suspended Floor Insulation, Loft Insulation, Cavity Wall Insulation, Pitched Roof Insulation, Flat Roof Insulation, Windows, Front Doors, Hydrogen Boilers, Gas Boilers, Biomass, Combined Heating and Power and External Wall Insulation.
Options: The framework includes an option to extend for a further 3 years beyond the initial 4 year term to align with the Government target of 2030 for retrofit and decarbonisation work.
Construction Works (up to PS5m) Midlands and Mid WalesLot 1b covered Decarbonisation Construction works up to PS5m in the Midlands and Central Wales. Work under this could include Solar PV and Battery, Heat Pumps, Electric Heaters, Heat and Hot Water Controller, Mechanical Extract, Solid Floor Insulation, Low Energy, Lighting, Internal Wall Insulation, Suspended Floor Insulation, Loft Insulation, Cavity Wall Insulation, Pitched Roof Insulation, Flat Roof Insulation, Windows, Front Doors, Hydrogen Boilers, Gas Boilers, Biomass, Combined Heating and Power and External Wall Insulation.
Options: The framework includes an option to extend for a further 3 years beyond the initial 4 year term to align with the Government target of 2030 for retrofit and decarbonisation work.
Construction Works (up to PS5m) South West England and South WalesLot 1c covered Decarbonisation Construction works up to PS5m in South West England and South Wales. Work under this could include Solar PV and Battery, Heat Pumps, Electric Heaters, Heat and Hot Water Controller, Mechanical Extract, Solid Floor Insulation, Low Energy, Lighting, Internal Wall Insulation, Suspended Floor Insulation, Loft Insulation, Cavity Wall Insulation, Pitched Roof Insulation, Flat Roof Insulation, Windows, Front Doors, Hydrogen Boilers, Gas Boilers, Biomass, Combined Heating and Power and External Wall Insulation.
Options: The framework includes an option to extend for a further 3 years beyond the initial 4 year term to align with the Government target of 2030 for retrofit and decarbonisation work.
Construction Works (up to PS5m) South and East EnglandLot 1d covered Decarbonisation Construction works up to PS5m in South and East England. Work under this lot could include Solar PV and Battery, Heat Pumps, Electric Heaters, Heat and Hot Water Controller, Mechanical Extract, Solid Floor Insulation, Low Energy, Lighting, Internal Wall Insulation, Suspended Floor Insulation, Loft Insulation, Cavity Wall Insulation, Pitched Roof Insulation, Flat Roof Insulation, Windows, Front Doors, Hydrogen Boilers, Gas Boilers, Biomass, Combined Heating and Power and External Wall Insulation.
Options: The framework includes an option to extend for a further 3 years beyond the initial 4 year term to align with the Government target of 2030 for retrofit and decarbonisation work.
Construction Works (up to PS5m) LondonLot 1e covered Decarbonisation Construction works up to PS5m in London. Work under this Lot could include Solar PV and Battery, Heat Pumps, Electric Heaters, Heat and Hot Water Controller, Mechanical Extract, Solid Floor Insulation, Low Energy, Lighting, Internal Wall Insulation, Suspended Floor Insulation, Loft Insulation, Cavity Wall Insulation, Pitched Roof Insulation, Flat Roof Insulation, Windows, Front Doors, Hydrogen Boilers, Gas Boilers, Biomass, Combined Heating and Power and External Wall Insulation.
Options: The framework includes an option to extend for a further 3 years beyond the initial 4 year term to align with the Government target of 2030 for retrofit and decarbonisation work.
Construction Works (over PS2m) North England and North WalesLot 2a covered Decarbonisation Construction works over PS2m in North England and North Wales. Work under this lot could include Solar PV and Battery, Heat Pumps, Electric Heaters, Heat and Hot Water Controller, Mechanical Extract, Solid Floor Insulation, Low Energy, Lighting, Internal Wall Insulation, Suspended Floor Insulation, Loft Insulation, Cavity Wall Insulation, Pitched Roof Insulation, Flat Roof Insulation, Windows, Front Doors, Hydrogen Boilers, Gas Boilers, Biomass, Combined Heating and Power and External Wall Insulation.
Options: The framework includes an option to extend for a further 3 years beyond the initial 4 year term to align with the Government target of 2030 for retrofit and decarbonisation work.
Construction Works (over PS2m) Midlands and Mid WalesLot 2b covered Decarbonisation Construction works over PS2m in Midlands and Central Wales. Work under this lot could include Solar PV and Battery, Heat Pumps, Electric Heaters, Heat and Hot Water Controller, Mechanical Extract, Solid Floor Insulation, Low Energy, Lighting, Internal Wall Insulation, Suspended Floor Insulation, Loft Insulation, Cavity Wall Insulation, Pitched Roof Insulation, Flat Roof Insulation, Windows, Front Doors, Hydrogen Boilers, Gas Boilers, Biomass, Combined Heating and Power and External Wall Insulation.
Options: The framework includes an option to extend for a further 3 years beyond the initial 4 year term to align with the Government target of 2030 for retrofit and decarbonisation work.
Construction Works (over PS2m) South West England and South WalesLot 2c covered Decarbonisation Construction works over PS2m in South West England and South Wales. Work under this lot could include Solar PV and Battery, Heat Pumps, Electric Heaters, Heat and Hot Water Controller, Mechanical Extract, Solid Floor Insulation, Low Energy, Lighting, Internal Wall Insulation, Suspended Floor Insulation, Loft Insulation, Cavity Wall Insulation, Pitched Roof Insulation, Flat Roof Insulation, Windows, Front Doors, Hydrogen Boilers, Gas Boilers, Biomass, Combined Heating and Power and External Wall Insulation.
Options: The framework includes an option to extend for a further 3 years beyond the initial 4 year term to align with the Government target of 2030 for retrofit and decarbonisation work.
Construction Works (over PS2m) South and East EnglandLot 2d covered Decarbonisation Construction works over PS2m in South and East England. Work under this lot could include Solar PV and Battery, Heat Pumps, Electric Heaters, Heat and Hot Water Controller, Mechanical Extract, Solid Floor Insulation, Low Energy, Lighting, Internal Wall Insulation, Suspended Floor Insulation, Loft Insulation, Cavity Wall Insulation, Pitched Roof Insulation, Flat Roof Insulation, Windows, Front Doors, Hydrogen Boilers, Gas Boilers, Biomass, Combined Heating and Power and External Wall Insulation.
Options: The framework includes an option to extend for a further 3 years beyond the initial 4 year term to align with the Government target of 2030 for retrofit and decarbonisation work.
Construction Works (over PS2m) LondonLot 2e covered Decarbonisation Construction works over PS2m in London. Work under this lot could include Solar PV and Battery, Heat Pumps, Electric Heaters, Heat and Hot Water Controller, Mechanical Extract, Solid Floor Insulation, Low Energy, Lighting, Internal Wall Insulation, Suspended Floor Insulation, Loft Insulation, Cavity Wall Insulation, Pitched Roof Insulation, Flat Roof Insulation, Windows, Front Doors, Hydrogen Boilers, Gas Boilers, Biomass, Combined Heating and Power and External Wall Insulation.
Options: The framework includes an option to extend for a further 3 years beyond the initial 4 year term to align with the Government target of 2030 for retrofit and decarbonisation work.
Consultancy Work - North England and North WalesLot 3a covered Decarbonisation Consultancy work in North England and North Wales. Work under this lot could include provision of Managed Services including Retrofit lead generation and management to deliver eligible Customer referrals, Programme management to deliver eligible installations, Retrofit Advice, Assessment and Coordination Pre-Works, Retrofit Coordination and Evaluation, Deliver air permeability test to a dwelling, Deliver damp survey to a dwelling, Deliver thermographic image survey to a dwelling, Deliver EPR, Air Tightness Test and could also include the provision of interim support in some roles including Retrofit Coordinator, Retrofit Advisor, Retrofit Assessor, Retrofit Designer, Retrofit Evaluator, Project Administrator
Options: The framework includes an option to extend for a further 3 years beyond the initial 4 year term to align with the Government target of 2030 for retrofit and decarbonisation work.
Consultancy Work - Midlands and Mid WalesLot 3b covered Decarbonisation Consultancy work in Midlands and Central Wales. Work under this lot could include provision of Managed Services including Retrofit lead generation and management to deliver eligible Customer referrals, Programme management to deliver eligible installations, Retrofit Advice, Assessment and Coordination Pre-Works, Retrofit Coordination and Evaluation, Deliver air permeability test to a dwelling, Deliver damp survey to a dwelling, Deliver thermographic image survey to a dwelling, Deliver EPR, Air Tightness Test and could also include the provision of interim support in some roles including Retrofit Coordinator, Retrofit Advisor, Retrofit Assessor, Retrofit Designer, Retrofit Evaluator, Project Administrator
Options: The framework includes an option to extend for a further 3 years beyond the initial 4 year term to align with the Government target of 2030 for retrofit and decarbonisation work.
Consultancy Work - South West England and South WalesLot 3c covered Decarbonisation Consultancy work in South West England and South Wales. Work under this lot could include provision of Managed Services including Retrofit lead generation and management to deliver eligible Customer referrals, Programme management to deliver eligible installations, Retrofit Advice, Assessment and Coordination Pre-Works, Retrofit Coordination and Evaluation, Deliver air permeability test to a dwelling, Deliver damp survey to a dwelling, Deliver thermographic image survey to a dwelling, Deliver EPR, Air Tightness Test and could also include the provision of interim support in some roles including Retrofit Coordinator, Retrofit Advisor, Retrofit Assessor, Retrofit Designer, Retrofit Evaluator, Project Administrator
Options: The framework includes an option to extend for a further 3 years beyond the initial 4 year term to align with the Government target of 2030 for retrofit and decarbonisation work.
Consultancy Work - South and East EnglandLot 3d covered Decarbonisation Consultancy work in South and East England. Work under this lot could include provision of Managed Services including Retrofit lead generation and management to deliver eligible Customer referrals, Programme management to deliver eligible installations, Retrofit Advice, Assessment and Coordination Pre-Works, Retrofit Coordination and Evaluation, Deliver air permeability test to a dwelling, Deliver damp survey to a dwelling, Deliver thermographic image survey to a dwelling, Deliver EPR, Air Tightness Test and could also include the provision of interim support in some roles including Retrofit Coordinator, Retrofit Advisor, Retrofit Assessor, Retrofit Designer, Retrofit Evaluator, Project Administrator
Options: The framework includes an option to extend for a further 3 years beyond the initial 4 year term to align with the Government target of 2030 for retrofit and decarbonisation work.
Consultancy Work - LondonLot 3e covered Decarbonisation Consultancy work in North England and North Wales. Work under this lot could include provision of Managed Services including Retrofit lead generation and management to deliver eligible Customer referrals, Programme management to deliver eligible installations, Retrofit Advice, Assessment and Coordination Pre-Works, Retrofit Coordination and Evaluation, Deliver air permeability test to a dwelling, Deliver damp survey to a dwelling, Deliver thermographic image survey to a dwelling, Deliver EPR, Air Tightness Test and could also include the provision of interim support in some roles including Retrofit Coordinator, Retrofit Advisor, Retrofit Assessor, Retrofit Designer, Retrofit Evaluator, Project Administrator
Options: The framework includes an option to extend for a further 3 years beyond the initial 4 year term to align with the Government target of 2030 for retrofit and decarbonisation work.
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-h6vhtk-039a58
- Publication Source
- Find A Tender Service
- Latest Notice
- https://www.find-tender.service.gov.uk/Notice/014420-2023
- Current Stage
- Award
- All Stages
- Tender, Award
Procurement Classification
- Notice Type
- Tender Notice
- Procurement Type
- Framework
- Procurement Category
- Works
- Procurement Method
- Open
- Procurement Method Details
- Open procedure
- Tender Suitability
- Not specified
- Awardee Scale
- Large, SME
Common Procurement Vocabulary (CPV)
- CPV Divisions
09 - Petroleum products, fuel, electricity and other sources of energy
51 - Installation services (except software)
71 - Architectural, construction, engineering and inspection services
-
- CPV Codes
09300000 - Electricity, heating, solar and nuclear energy
09331000 - Solar panels
09332000 - Solar installation
42511110 - Heat pumps
42515000 - District heating boiler
42943210 - Immersion thermostats
44112600 - Sound insulation
44621000 - Radiators and boilers
44621110 - Central-heating radiators
44621200 - Boilers
44621210 - Water boilers
44621220 - Central-heating boilers
45000000 - Construction work
45232141 - Heating works
45261410 - Roof insulation work
45262100 - Scaffolding work
45311100 - Electrical wiring work
45315000 - Electrical installation work of heating and other electrical building-equipment
45321000 - Thermal insulation work
45323000 - Sound insulation work
45331000 - Heating, ventilation and air-conditioning installation work
45331100 - Central-heating installation work
45331110 - Boiler installation work
45331200 - Ventilation and air-conditioning installation work
45331210 - Ventilation installation work
45421100 - Installation of doors and windows and related components
45421110 - Installation of door and window frames
45421112 - Installation of window frames
45421130 - Installation of doors and windows
45421132 - Installation of windows
51000000 - Installation services (except software)
71314300 - Energy-efficiency consultancy services
71315200 - Building consultancy services
71321200 - Heating-system design services
71321400 - Ventilation consultancy services
Notice Value(s)
- Tender Value
- £1,477,600,000 £1B-£10B
- Lots Value
- £1,477,600,000 £1B-£10B
- Awards Value
- Not specified
- Contracts Value
- £1,362,230,000 £1B-£10B
Notice Dates
- Publication Date
- 21 May 20233 years ago
- Submission Deadline
- 28 Feb 2023Expired
- Future Notice Date
- Not specified
- Award Date
- 5 May 20233 years ago
- Contract Period
- Not specified - Not specified
- Recurrence
- Not specified
Notice Status
- Tender Status
- Complete
- Lots Status
- Cancelled
- Awards Status
- Active
- Contracts Status
- Active
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- Abri Group Limited
- Contact Name
- Available with D3 Tenders Premium →
- Contact Email
- Available with D3 Tenders Premium →
- Contact Phone
- Available with D3 Tenders Premium →
Buyer Location
- Locality
- HAMPSHIRE
- Postcode
- SO50 6AD
- Postcode Area
- Southampton
- Country
- England
-
- Major Region (ITL 1)
- TLJ South East (England)
- Basic Region (ITL 2)
- TLJ3 Hampshire and Isle of Wight
- Small Region (ITL 3)
- TLJ35 South Hampshire
- Delivery Location
- TLC North East (England), TLC1 Tees Valley and Durham, TLC2 Northumberland, and Tyne and Wear, TLD North West (England), TLD1 Cumbria, TLD3 Greater Manchester, TLD4 Lancashire, TLD6 Cheshire, TLD7 Merseyside, TLE Yorkshire and The Humber, TLE1 East Yorkshire and Northern Lincolnshire, TLE2 North Yorkshire, TLE3 South Yorkshire, TLE4 West Yorkshire, TLF East Midlands (England), TLF1 Derbyshire and Nottinghamshire, TLF2 Leicestershire, Rutland and Northamptonshire, TLF3 Lincolnshire, TLG West Midlands (England), TLG1 Herefordshire, Worcestershire and Warwickshire, TLG2 Shropshire and Staffordshire, TLG3 West Midlands, TLH East (England), TLH1 East Anglia, TLH2 Bedfordshire and Hertfordshire, TLH3 Essex, TLI London, TLI3 Inner London - West, TLI4 Inner London - East, TLI5 Outer London - East and North East, TLI6 Outer London - South, TLI7 Outer London - West and North West, TLJ South East (England), TLJ1 Berkshire, Buckinghamshire and Oxfordshire, TLJ2 Surrey, East and West Sussex, TLJ3 Hampshire and Isle of Wight, TLJ4 Kent, TLK South West (England), TLK1 Gloucestershire, Wiltshire and Bristol/Bath area, TLK2 Dorset and Somerset, TLK3 Cornwall and Isles of Scilly, TLK4 Devon, TLL11 Isle of Anglesey, TLL12 Gwynedd, TLL13 Conwy and Denbighshire, TLL14 South West Wales, TLL15 Central Valleys, TLL16 Gwent Valleys, TLL17 Bridgend and Neath Port Talbot, TLL18 Swansea, TLL21 Monmouthshire and Newport, TLL22 Cardiff and Vale of Glamorgan, TLL23 Flintshire and Wrexham, TLL24 Powys
-
- Local Authority
- Eastleigh
- Electoral Ward
- Eastleigh North
- Westminster Constituency
- Eastleigh
Supplier Information
- Number of Suppliers
- 43
- Supplier Names
AD Construction Group (Architectural Decorators Ltd)
Correct Contract Services Limited
Kier Services Limited (T/a Kier Places)
Kier Services Limited T/a Kier Places
Liberty Group Investments Ltd.
Morgan Sindall Property Services Ltd.
Osborne Property Services Limited
Further Information
Notice URLs
Open Contracting Data Standard (OCDS)
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.