Notice Information
Notice Title
Isolation & Associated Services
Notice Description
The supply of Isolation & Associated Services to Lot 1 Eastern Region, Lot 2 North West and Central Region and Lot 3 Wales and Western Region. The framework will be available for any Network Rail (NR) national function to use. This sourcing activity will provide Network Rail with a comprehensive call-off isolation and construction services for 25kV AC, 750V DC, and 1500V DC Overhead Line (OLE) and 3rd and 4th rail DC conductor rail equipment (CRE) systems within the Service Areas covered by the regions listed above.
Lot Information
Isolation & Associated Services Lot 1 Eastern
Isolation & Associated Services Lot 1 Eastern
Isolation & Associated Services - Eastern RegionThe services could comprise of professional services, technical solutions, labour, and tools and equipment to deliver planning, design, delivery, hand back and maintenance in relation to isolation and construction services as outlined in the applicable standards. The framework suppliers shall undertake activities including, but not limited to, the following: a. Plan and implement an electrical safe system of work (isolation) taking account of the task(s), task delivery method(s), OLE/CRE infrastructure, the presence of residual electrical hazards and the required control measures, b. Review isolation diagrams and instructions, c. Plan and carry out pre-isolation walkouts as required by the relevant standards, d. Attendance, by competent persons, at interface meetings including Network Rail Possession meetings, isolation interface meetings and 'white board' reviews as required by The Service Manager, e. Liaison with third party isolation planners including Network Rail and its Principal Contractors, f. Liaison with, and co-ordination of, Network Rail and other isolation service providers where the Consultant is identified as the 'lead' isolation provider - this includes the management and submission of all paperwork required to implement the electrical safe system of work, g. Plan, complete and submit Isolation Details Forms (IDF) in accordance with the Service Area's published timescales, h. Identify earthing/shorting requirements, in accordance with the relevant standards, to provide safe working arrangements matched to the proposed task and task delivery activities and methodologies, i. Identify and facilitate the management of traction power electrical hazards, in addition to OLE/CRE, affecting work activities (e.g. traction return bonding; red bonds; nearby distribution feeders or equipment; outside parties' HV electrical supplies crossing the railway, etc.), j. Identify and record all residual electrical hazards that will remain on site after isolation and earthing/shorting has been completed, and provide control measures e.g., RoLE equipment devices, as required by standards, k. Where required, plan and undertake briefing of site personnel as required, permit work activities near OLE and CRE, and manage permit to work documentation until cancellation, l. Where required, produce Work Package Plans (WPP), m. Resource all isolation staffing requirements by provision of sufficient competent resources to meet the Service Area's / Service Manager's target timescales for implementation / removal of an isolation, n. Provide all requisite Road Rail Vehicles (RRVs) to expedite isolation delivery, o. Produce walk-out packs as defined by the client, p. Provide approved isolation equipment to enable the safe isolation of OLE / CRE and be fully compliant with Network Rail's Life Saving Rules, q. Provide and check all task-specific equipment is fit for use and, where required, fully calibrated and registered, r. Produce methodologies and task briefings, s. Carry out the requisite Safe System of Work Pack planning in accordance with the relevant standards, t. Carry out electrical risk assessments, u. Maintain isolation diagrams and instructions up to date, v. Compliance with the provision of periodic (four weekly) Key Performance Indicator data and other data to support the monitoring of leading and lagging performance indicators linked to Network Rail's Electrical Safety Strategy, w. Provide on-site messing facilities where agreed with the Service Manager, x. Provide suitable and sufficient transport, y. Liaise with the Network Rail Electrical Control Room, z. Design, Planning and Installation of Permanent Earth Sections, aa. Where required, plan and implement Return Conductor (RC) Isolations, bb. Temporary Works Bonding, cc. Heights and Staggers Survey, dd. Condition Survey, ee. Structure Bonding Works. The above list is subject to change, e.g. legislation or NR standards or systems changes. Additional information: Please contact Suzanne.hall@networkrail.co.uk for further information.
Renewal: Three optional 12 month extensions
Isolation & Associated Services - North West & Central RegionThe services could comprise of professional services, technical solutions, labour, and tools and equipment to deliver planning, design, delivery, hand back and maintenance in relation to isolation and construction services as outlined in the applicable standards. The framework suppliers shall undertake activities including, but not limited to, the following: a. Plan and implement an electrical safe system of work (isolation) taking account of the task(s), task delivery method(s), OLE/CRE infrastructure, the presence of residual electrical hazards and the required control measures, b. Review isolation diagrams and instructions, c. Plan and carry out pre-isolation walkouts as required by the relevant standards, d. Attendance, by competent persons, at interface meetings including Network Rail Possession meetings, isolation interface meetings and 'white board' reviews as required by The Service Manager, e. Liaison with third party isolation planners including Network Rail and its Principal Contractors, f. Liaison with, and co-ordination of, Network Rail and other isolation service providers where the Consultant is identified as the 'lead' isolation provider - this includes the management and submission of all paperwork required to implement the electrical safe system of work, g. Plan, complete and submit Isolation Details Forms (IDF) in accordance with the Service Area's published timescales, h. Identify earthing/shorting requirements, in accordance with the relevant standards, to provide safe working arrangements matched to the proposed task and task delivery activities and methodologies, i. Identify and facilitate the management of traction power electrical hazards, in addition to OLE/CRE, affecting work activities (e.g. traction return bonding; red bonds; nearby distribution feeders or equipment; outside parties' HV electrical supplies crossing the railway, etc.), j. Identify and record all residual electrical hazards that will remain on site after isolation and earthing/shorting has been completed, and provide control measures e.g., RoLE equipment devices, as required by standards, k. Where required, plan and undertake briefing of site personnel as required, permit work activities near OLE and CRE, and manage permit to work documentation until cancellation, l. Where required, produce Work Package Plans (WPP), m. Resource all isolation staffing requirements by provision of sufficient competent resources to meet the Service Area's / Service Manager's target timescales for implementation / removal of an isolation, n. Provide all requisite Road Rail Vehicles (RRVs) to expedite isolation delivery, o. Produce walk-out packs as defined by the client, p. Provide approved isolation equipment to enable the safe isolation of OLE / CRE and be fully compliant with Network Rail's Life Saving Rules, q. Provide and check all task-specific equipment is fit for use and, where required, fully calibrated and registered, r. Produce methodologies and task briefings, s. Carry out the requisite Safe System of Work Pack planning in accordance with the relevant standards, t. Carry out electrical risk assessments, u. Maintain isolation diagrams and instructions up to date, v. Compliance with the provision of periodic (four weekly) Key Performance Indicator data and other data to support the monitoring of leading and lagging performance indicators linked to Network Rail's Electrical Safety Strategy, w. Provide on-site messing facilities where agreed with the Service Manager, x. Provide suitable and sufficient transport, y. Liaise with the Network Rail Electrical Control Room, z. Design, Planning and Installation of Permanent Earth Sections, aa. Where required, plan and implement Return Conductor (RC) Isolations, bb. Temporary Works Bonding, cc. Heights and Staggers Survey, dd. Condition Survey, ee. Structure Bonding Works. The above list is subject to change, e.g., legislation or NR standards or systems changes. Additional information: Please contact Suzanne.hall@networkrail.co.uk for further information.
Renewal: Three optional 12 month extensions.
Isolation & Associated Services - Wales & Western RegionThe services could comprise of professional services, technical solutions, labour, and tools and equipment to deliver planning, design, delivery, hand back and maintenance in relation to isolation and construction services as outlined in the applicable standards. The framework suppliers shall undertake activities including, but not limited to, the following: a. Plan and implement an electrical safe system of work (isolation) taking account of the task(s), task delivery method(s), OLE/CRE infrastructure, the presence of residual electrical hazards and the required control measures, b. Review isolation diagrams and instructions, c. Plan and carry out pre-isolation walkouts as required by the relevant standards, d. Attendance, by competent persons, at interface meetings including Network Rail Possession meetings, isolation interface meetings and 'white board' reviews as required by The Service Manager, e. Liaison with third party isolation planners including Network Rail and its Principal Contractors, f. Liaison with, and co-ordination of, Network Rail and other isolation service providers where the Consultant is identified as the 'lead' isolation provider - this includes the management and submission of all paperwork required to implement the electrical safe system of work, g. Plan, complete and submit Isolation Details Forms (IDF) in accordance with the Service Area's published timescales, h. Identify earthing/shorting requirements, in accordance with the relevant standards, to provide safe working arrangements matched to the proposed task and task delivery activities and methodologies, i. Identify and facilitate the management of traction power electrical hazards, in addition to OLE/CRE, affecting work activities (e.g. traction return bonding; red bonds; nearby distribution feeders or equipment; outside parties' HV electrical supplies crossing the railway, etc.), j. Identify and record all residual electrical hazards that will remain on site after isolation and earthing/shorting has been completed, and provide control measures e.g., RoLE equipment devices, as required by standards, k. Where required, plan and undertake briefing of site personnel as required, permit work activities near OLE and CRE, and manage permit to work documentation until cancellation, l. Where required, produce Work Package Plans (WPP), m. Resource all isolation staffing requirements by provision of sufficient competent resources to meet the Service Area's / Service Manager's target timescales for implementation / removal of an isolation, n. Provide all requisite Road Rail Vehicles (RRVs) to expedite isolation delivery, o. Produce walk-out packs as defined by the client, p. Provide approved isolation equipment to enable the safe isolation of OLE / CRE and be fully compliant with Network Rail's Life Saving Rules, q. Provide and check all task-specific equipment is fit for use and, where required, fully calibrated and registered, r. Produce methodologies and task briefings, s. Carry out the requisite Safe System of Work Pack planning in accordance with the relevant standards, t. Carry out electrical risk assessments, u. Maintain isolation diagrams and instructions up to date, v. Compliance with the provision of periodic (four weekly) Key Performance Indicator data and other data to support the monitoring of leading and lagging performance indicators linked to Network Rail's Electrical Safety Strategy, w. Provide on-site messing facilities where agreed with the Service Manager, x. Provide suitable and sufficient transport, y. Liaise with the Network Rail Electrical Control Room, z. Design, Planning and Installation of Permanent Earth Sections, aa. Where required, plan and implement Return Conductor (RC) Isolations, bb. Temporary Works Bonding, cc. Heights and Staggers Survey, dd. Condition Survey, ee. Structure Bonding Works. The above list is subject to change, e.g. legislation or NR standards or systems changes. Additional information: Please contact Suzanne.hall@networkrail.co.uk for further information.
Renewal: Three optional 12 month extensions
Lot 2 North West and Central RegionIsolation and associated services
Lot 3 Wales and Western RegionIsolation and associated services
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-h6vhtk-03df0e
- Publication Source
- Find A Tender Service
- Latest Notice
- https://www.find-tender.service.gov.uk/Notice/067465-2026
- Current Stage
- Award
- All Stages
- Planning, Tender, Award
Procurement Classification
- Notice Type
- Planning Notice
- Procurement Type
- Framework
- Procurement Category
- Services
- Procurement Method
- Selective
- Procurement Method Details
- Negotiated procedure with prior call for competition
- Tender Suitability
- Not specified
- Awardee Scale
- Not specified
Common Procurement Vocabulary (CPV)
- CPV Divisions
50 - Repair and maintenance services
71 - Architectural, construction, engineering and inspection services
-
- CPV Codes
50532400 - Repair and maintenance services of electrical distribution equipment
65320000 - Operation of electrical installations
71314100 - Electrical services
71334000 - Mechanical and electrical engineering services
Notice Value(s)
- Tender Value
- £376,000,000 £100M-£1B
- Lots Value
- Not specified
- Awards Value
- Not specified
- Contracts Value
- Not specified
Notice Dates
- Publication Date
- 16 Jul 20261 months ago
- Submission Deadline
- 27 Nov 2024Expired
- Future Notice Date
- 20 Oct 2023Expired
- Award Date
- 1 May 20263 months ago
- Contract Period
- Not specified - Not specified
- Recurrence
- Not specified
Notice Status
- Tender Status
- Complete
- Lots Status
- Active, Cancelled
- Awards Status
- Active
- Contracts Status
- Active
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- Network Rail Infrastructure Ltd
- Contact Name
- Available with D3 Tenders Premium →
- Contact Email
- Available with D3 Tenders Premium →
- Contact Phone
- Available with D3 Tenders Premium →
Buyer Location
- Locality
- LONDON
- Postcode
- SE1 8SW
- Postcode Area
- South East London
- Country
- England
-
- Major Region (ITL 1)
- TLI London
- Basic Region (ITL 2)
- TLI4 Inner London - East
- Small Region (ITL 3)
- TLI45 Lambeth
- Delivery Location
- Not specified
-
- Local Authority
- Lambeth
- Electoral Ward
- Waterloo & South Bank
- Westminster Constituency
- Vauxhall and Camberwell Green
Further Information
Open Contracting Data Standard (OCDS)
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.