Planning

KINGSWAY TUNNEL REFURBISHMENT (DADO PANELS)

MERSEYTRAVEL

This public procurement record has 1 release in its history.

Planning

01 May 2026 at 13:01

Summary of the contracting process

The procurement process involves Merseytravel, a sub-central government public authority, seeking a contractor for the refurbishment of dado panels within the Kingsway Tunnel in Liverpool. This project falls under the 'works' procurement category and is currently in the planning stage. The refurbishment aims to ensure compliance with safety standards and improve operational performance. The planned contract is valued at £3,800,000, with a gross amount of £4,750,000, and uses a competitive flexible procurement procedure. The project communication indicates a future notice date of 1st June 2026, with work scheduled to commence on 1st December 2026 and end by 30th November 2027.

This tender poses a significant opportunity for businesses specialising in tunnel refurbishment, highway infrastructure, and panel system installation. Companies with expertise in managing environmental impacts, health and safety in confined spaces, and traffic management will be well-suited to compete. Small and medium enterprises are encouraged to apply, given the suitability criteria outlined. The successful contractor will play a vital role in enhancing the safety and efficiency of a critical transport infrastructure, which can substantially bolster a business's portfolio in high-profile civic projects.

Find more tenders on our Open Data Platform.
How relevant is this notice?

Notice Title

KINGSWAY TUNNEL REFURBISHMENT (DADO PANELS)

Notice Description

The contracting authority intends to procure a suitably qualified contractor to undertake refurbishment and/or replacement works to the dado panel system within the Kingsway Tunnel. The Kingsway Tunnel is a critical piece of transport infrastructure, and the existing dado panels-forming part of the tunnel lining and safety system-require upgrade to ensure continued compliance with current safety standards, durability requirements, and operational performance. The appointed contractor will be responsible for delivering a comprehensive programme of works, which is expected to include, but not be limited to: Condition Assessment and Surveys: Detailed inspection of existing dado panels, fixings, and supporting structures to determine extent of deterioration, defects, and required interventions. Design Development: Finalisation of design solutions for refurbishment and/or replacement, including materials selection, fire resistance, impact resistance, and compliance with relevant UK and EU tunnel safety standards. Removal and Installation Works: Safe removal of existing panels where required and installation of new or refurbished dado panels, including all associated fixings, supports, and interfaces with tunnel systems. Integration with Tunnel Systems: Coordination with existing tunnel infrastructure, including drainage, ventilation, lighting, and emergency systems, ensuring no adverse impact on operations or safety. Traffic and Operational Management: Planning and implementation of works to minimise disruption, including phased delivery, night-time or partial closures, and coordination with tunnel operations. Health, Safety, and Compliance: Adherence to all relevant health and safety legislation, including working in confined spaces and live highway environments, with robust risk management procedures. Environmental Considerations: Management of waste, materials, and environmental impacts in line with applicable regulations and sustainability objectives. Testing, Commissioning, and Handover: Inspection and verification of installed systems, ensuring compliance with specifications and provision of as-built documentation. The works will be delivered in a highly constrained operational environment, requiring careful planning, stakeholder coordination, and experience in similar tunnel or highway infrastructure projects. This procurement seeks to appoint a contractor with proven expertise in tunnel refurbishment, highway infrastructure works, and installation of specialist panel systems. The project outputs will contribute to the long-term safety, resilience, and operational efficiency of the Kingsway Tunnel.

Publication & Lifecycle

Open Contracting ID
ocds-h6vhtk-06905f
Publication Source
Find A Tender Service
Latest Notice
https://www.find-tender.service.gov.uk/Notice/040553-2026
Current Stage
Planning
All Stages
Planning

Procurement Classification

Notice Type
UK1 - Pipeline Notice
Procurement Type
Standard
Procurement Category
Works
Procurement Method
Not Specified
Procurement Method Details
Competitive flexible procedure
Tender Suitability
SME
Awardee Scale
Not specified

Common Procurement Vocabulary (CPV)

CPV Divisions

45 - Construction work


CPV Codes

45262660 - Asbestos-removal work

Notice Value(s)

Tender Value
£3,800,000 £1M-£10M
Lots Value
Not specified
Awards Value
Not specified
Contracts Value
Not specified

Notice Dates

Publication Date
1 May 20262 days ago
Submission Deadline
Not specified
Future Notice Date
1 Jun 20265 weeks to go
Award Date
Not specified
Contract Period
1 Dec 2026 - 30 Nov 2027 6-12 months
Recurrence
Not specified

Notice Status

Tender Status
Planned
Lots Status
Planned
Awards Status
Not Specified
Contracts Status
Not Specified

Contracting Authority (Buyer)

Main Buyer
MERSEYTRAVEL
Contact Name
Available with D3 Tenders Premium →
Contact Email
Available with D3 Tenders Premium →
Contact Phone
Available with D3 Tenders Premium →

Buyer Location

Locality
LIVERPOOL
Postcode
L3 1BP
Post Town
Liverpool
Country
England

Major Region (ITL 1)
TLD North West (England)
Basic Region (ITL 2)
TLD7 Merseyside
Small Region (ITL 3)
TLD72 Liverpool
Delivery Location
TLD72 Liverpool

Local Authority
Liverpool
Electoral Ward
Waterfront South
Westminster Constituency
Liverpool Riverside

Further Information

Open Contracting Data Standard (OCDS)

View full OCDS Record for this contracting process

Download

The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.

{
    "tag": [
        "compiled"
    ],
    "id": "ocds-h6vhtk-06905f-2026-05-01T14:01:37+01:00",
    "date": "2026-05-01T14:01:37+01:00",
    "ocid": "ocds-h6vhtk-06905f",
    "initiationType": "tender",
    "planning": {
        "documents": [
            {
                "id": "040553-2026",
                "documentType": "plannedProcurementNotice",
                "noticeType": "UK1",
                "description": "Pipeline notice on Find a Tender",
                "url": "https://www.find-tender.service.gov.uk/Notice/040553-2026",
                "datePublished": "2026-05-01T14:01:37+01:00",
                "format": "text/html"
            }
        ]
    },
    "parties": [
        {
            "id": "GB-PPON-PJQR-8469-DXQD",
            "name": "Merseytravel",
            "identifier": {
                "scheme": "GB-PPON",
                "id": "PJQR-8469-DXQD"
            },
            "address": {
                "streetAddress": "1 Mann Island",
                "locality": "Liverpool",
                "postalCode": "L3 1BP",
                "country": "GB",
                "countryName": "United Kingdom",
                "region": "UKD72"
            },
            "contactPoint": {
                "email": "Procurement@liverpoolcityregion-ca.gov.uk"
            },
            "roles": [
                "buyer"
            ],
            "details": {
                "url": "http://www.merseytravel.gov.uk",
                "classifications": [
                    {
                        "id": "publicAuthoritySubCentralGovernment",
                        "scheme": "UK_CA_TYPE",
                        "description": "Public authority - sub-central government"
                    }
                ]
            }
        }
    ],
    "buyer": {
        "id": "GB-PPON-PJQR-8469-DXQD",
        "name": "Merseytravel"
    },
    "tender": {
        "id": "ocds-h6vhtk-06905f",
        "legalBasis": {
            "id": "2023/54",
            "scheme": "UKPGA",
            "uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents"
        },
        "title": "KINGSWAY TUNNEL REFURBISHMENT (DADO PANELS)",
        "description": "The contracting authority intends to procure a suitably qualified contractor to undertake refurbishment and/or replacement works to the dado panel system within the Kingsway Tunnel. The Kingsway Tunnel is a critical piece of transport infrastructure, and the existing dado panels-forming part of the tunnel lining and safety system-require upgrade to ensure continued compliance with current safety standards, durability requirements, and operational performance. The appointed contractor will be responsible for delivering a comprehensive programme of works, which is expected to include, but not be limited to: Condition Assessment and Surveys: Detailed inspection of existing dado panels, fixings, and supporting structures to determine extent of deterioration, defects, and required interventions. Design Development: Finalisation of design solutions for refurbishment and/or replacement, including materials selection, fire resistance, impact resistance, and compliance with relevant UK and EU tunnel safety standards. Removal and Installation Works: Safe removal of existing panels where required and installation of new or refurbished dado panels, including all associated fixings, supports, and interfaces with tunnel systems. Integration with Tunnel Systems: Coordination with existing tunnel infrastructure, including drainage, ventilation, lighting, and emergency systems, ensuring no adverse impact on operations or safety. Traffic and Operational Management: Planning and implementation of works to minimise disruption, including phased delivery, night-time or partial closures, and coordination with tunnel operations. Health, Safety, and Compliance: Adherence to all relevant health and safety legislation, including working in confined spaces and live highway environments, with robust risk management procedures. Environmental Considerations: Management of waste, materials, and environmental impacts in line with applicable regulations and sustainability objectives. Testing, Commissioning, and Handover: Inspection and verification of installed systems, ensuring compliance with specifications and provision of as-built documentation. The works will be delivered in a highly constrained operational environment, requiring careful planning, stakeholder coordination, and experience in similar tunnel or highway infrastructure projects. This procurement seeks to appoint a contractor with proven expertise in tunnel refurbishment, highway infrastructure works, and installation of specialist panel systems. The project outputs will contribute to the long-term safety, resilience, and operational efficiency of the Kingsway Tunnel.",
        "items": [
            {
                "id": "1",
                "additionalClassifications": [
                    {
                        "scheme": "CPV",
                        "id": "45262660",
                        "description": "Asbestos-removal work"
                    }
                ],
                "deliveryAddresses": [
                    {
                        "region": "UKD72",
                        "country": "GB",
                        "countryName": "United Kingdom"
                    }
                ],
                "relatedLot": "1"
            }
        ],
        "value": {
            "amountGross": 4750000,
            "amount": 3800000,
            "currency": "GBP"
        },
        "procurementMethodDetails": "Competitive flexible procedure",
        "mainProcurementCategory": "works",
        "aboveThreshold": true,
        "lots": [
            {
                "id": "1",
                "suitability": {
                    "sme": true
                },
                "contractPeriod": {
                    "startDate": "2026-12-01T00:00:00Z",
                    "endDate": "2027-11-30T23:59:59Z"
                },
                "status": "planned"
            }
        ],
        "communication": {
            "futureNoticeDate": "2026-06-01T23:59:59+01:00"
        },
        "status": "planned"
    },
    "language": "en"
}