Notice Information
Notice Title
Court Road Footbridge Refurbishment
Notice Description
Notification of Award of Contract of a previously advertised tender opportunity:The works will involve potential structural steel repairs, preparation to SA2 1/2 standard of cleanliness to bright steel and application of a three/two coat paint system over the entire footbridge and associated access steel rampsRemediation works will comprise either of the following Options individually or a combination of the two;Option 1: Footbridge remediation works as per the scope of works to be undertaken wholly in-situ of the bridge's existing geographical location.The works will involve potential structural steel repairs, preparation to SA2 1/2 standard of cleanliness to bright steel and application of a three/two coat paint system over the entire footbridge and associated access steel rampsRemediation works will comprise either of the following Options individually or a combination of the two;Option 1: Footbridge remediation works as per the scope of works to be undertaken wholly in-situ of the bridge's existing geographical location.Option 2: The steel components of both the superstructure (comprising the main traffic span and access ramp) and substructure pier (if feasible to be removed from site otherwise refurbished insitu), to be wholly removed and transported off site to a convenient location where the remediation works can be undertaken as per the scope of works.If option 2 is taken forward, a site has been identified approximately 1.5 miles east if the site, traveling eastward on the A469, see drawing SO1024-006 for site location where the offsite refurbishment works can be undertaken for the duration of this contract.Working at height and management of traffic will be a specific hazard. Suitable temporary works such as design scaffolds (structural or otherwise) will be required. Suitable planning and precaution required ensuring health and safety especially working at height and protection from hazardous processes of all who may be affected.If Option 2 is employed, suitably designed temporary structurers will be required to support cantilevering access ramps .The structural scaffolding will be designed to support the existing remaining structures and must be installed prior to lifting the main span. The contractor is to ensure any foundations and / or footing's supporting the temporary works is suitable and satisfies the allowable ground bearing capacity. The loosening, lifting and transportation of the main span off site and subsequently returned and reconnecting must be undertaken and managed by a suitably qualified company and personnel. A lifting plan must be developed and submitted for review / comment from the Client / Principal designer.The contract is NEC3 Contract.
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-kuma6s-111111
- Publication Source
- Sell2Wales
- Latest Notice
- https://www.sell2wales.gov.wales/search/search_switch.aspx?ID=111111
- Current Stage
- Award
- All Stages
- Award
Procurement Classification
- Notice Type
- S2W Notice - Website Contract Award Notice
- Procurement Type
- Standard
- Procurement Category
- Works
- Procurement Method
- Not Specified
- Procurement Method Details
- Not specified
- Tender Suitability
- Not specified
- Awardee Scale
- Not specified
Common Procurement Vocabulary (CPV)
- CPV Divisions
45 - Construction work
-
- CPV Codes
45220000 - Engineering works and construction works
45442121 - Painting work of structures
Notice Value(s)
- Tender Value
- Not specified
- Lots Value
- Not specified
- Awards Value
- Not specified
- Contracts Value
- Not specified
Notice Dates
- Publication Date
- 26 Oct 20223 years ago
- Submission Deadline
- Not specified
- Future Notice Date
- Not specified
- Award Date
- 29 Jul 20214 years ago
- Contract Period
- Not specified - Not specified
- Recurrence
- Not specified
Notice Status
- Tender Status
- Not Specified
- Lots Status
- Not Specified
- Awards Status
- Not Specified
- Contracts Status
- Active
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- CAERPHILLY COUNTY BOROUGH COUNCIL
- Contact Name
- Fran Gully
- Contact Email
- gullyf@caerphilly.gov.uk
- Contact Phone
- +44 1495235569
Buyer Location
- Locality
- HENGOED
- Postcode
- CF82 7PG
- Post Town
- Cardiff
- Country
- Wales
-
- Major Region (ITL 1)
- TLL Wales
- Basic Region (ITL 2)
- TLL5 South East Wales
- Small Region (ITL 3)
- TLL53 Gwent Valleys
- Delivery Location
- Not specified
-
- Local Authority
- Caerphilly
- Electoral Ward
- Ystrad Mynach
- Westminster Constituency
- Caerphilly
Further Information
Notice URLs
Open Contracting Data Standard (OCDS)
View full OCDS Record for this contracting process
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.
{
"tag": [
"compiled"
],
"id": "ocds-kuma6s-111111-2022-10-26T10:46:00Z",
"date": "2022-10-26T10:46:00Z",
"ocid": "ocds-kuma6s-111111",
"initiationType": "tender",
"parties": [
{
"id": "org-12",
"name": "Caerphilly County Borough Council",
"address": {
"streetAddress": "Building Consultancy, Penallta House, Tredomen Park, Ystrad Mynach,",
"locality": "Hengoed",
"postalCode": "CF82 7PG"
},
"contactPoint": {
"name": "Fran Gully",
"email": "gullyf@caerphilly.gov.uk",
"telephone": "+44 1495235569",
"url": "https://www.caerphilly.gov.uk"
},
"roles": [
"buyer"
]
},
{
"id": "org-38",
"name": "Taziker Industrial Ltd",
"address": {
"streetAddress": "Levens House, Ackhurst Business Park, Foxhole Road,",
"locality": "Chorley",
"postalCode": "PR71NY"
},
"contactPoint": {
"url": "https://www.taziker.com"
},
"roles": [
"supplier"
]
}
],
"buyer": {
"name": "Caerphilly County Borough Council",
"id": "org-12"
},
"tender": {
"id": "ocds-kuma6s-111111-tender-125959",
"title": "Court Road Footbridge Refurbishment",
"description": "Notification of Award of Contract of a previously advertised tender opportunity:The works will involve potential structural steel repairs, preparation to SA2 1/2 standard of cleanliness to bright steel and application of a three/two coat paint system over the entire footbridge and associated access steel rampsRemediation works will comprise either of the following Options individually or a combination of the two;Option 1: Footbridge remediation works as per the scope of works to be undertaken wholly in-situ of the bridge's existing geographical location.The works will involve potential structural steel repairs, preparation to SA2 1/2 standard of cleanliness to bright steel and application of a three/two coat paint system over the entire footbridge and associated access steel rampsRemediation works will comprise either of the following Options individually or a combination of the two;Option 1: Footbridge remediation works as per the scope of works to be undertaken wholly in-situ of the bridge's existing geographical location.Option 2: The steel components of both the superstructure (comprising the main traffic span and access ramp) and substructure pier (if feasible to be removed from site otherwise refurbished insitu), to be wholly removed and transported off site to a convenient location where the remediation works can be undertaken as per the scope of works.If option 2 is taken forward, a site has been identified approximately 1.5 miles east if the site, traveling eastward on the A469, see drawing SO1024-006 for site location where the offsite refurbishment works can be undertaken for the duration of this contract.Working at height and management of traffic will be a specific hazard. Suitable temporary works such as design scaffolds (structural or otherwise) will be required. Suitable planning and precaution required ensuring health and safety especially working at height and protection from hazardous processes of all who may be affected.If Option 2 is employed, suitably designed temporary structurers will be required to support cantilevering access ramps .The structural scaffolding will be designed to support the existing remaining structures and must be installed prior to lifting the main span. The contractor is to ensure any foundations and / or footing's supporting the temporary works is suitable and satisfies the allowable ground bearing capacity. The loosening, lifting and transportation of the main span off site and subsequently returned and reconnecting must be undertaken and managed by a suitably qualified company and personnel. A lifting plan must be developed and submitted for review / comment from the Client / Principal designer.The contract is NEC3 Contract.",
"mainProcurementCategory": "works",
"additionalClassifications": [
{
"id": "45220000",
"description": "Engineering works and construction works",
"scheme": "CPV"
},
{
"id": "45442121",
"description": "Painting work of structures",
"scheme": "CPV"
}
]
},
"awards": [
{
"id": "ocds-kuma6s-111111-award-125959-26",
"suppliers": [
{
"id": "org-38",
"name": "Taziker Industrial Ltd"
}
],
"items": [
{
"id": "ocds-kuma6s-111111-awarditem-125959-26"
}
]
}
],
"contracts": [
{
"id": "ocds-kuma6s-111111-award-125959-26",
"awardID": "ocds-kuma6s-111111-award-125959-26",
"status": "active",
"dateSigned": "2021-07-29T00:00:00Z"
}
],
"bids": {
"statistics": [
{
"id": "ocds-kuma6s-111111-bidsstatistic-125959-26",
"measure": "bids",
"value": 4
}
]
},
"noticetype": "S2W Notice - Website Contract Award Notice"
}