Notice Information
Notice Title
TfW Core Valley Lines Transformation - Rhymney Valley, Coryton and Bay Lines Electrification
Notice Description
The CVL Transformation programme of works forms an important part of the South Wales Metro and includes an ambitious and extensive range of rail works including electrification of circa 170km of track, new stations, major refurbishment / extension of stations and associated ancillary works. The overarching deliverables for the works are: - Establish and manage a materials distribution center (MDC) within a locality of the works which facilitates storage and expeditious delivery of materials to the worksites. - Provision of a comprehensive materials quality control & material management system which can, but not be limited to the following functions: receive inputs (AFC designs, bills of materials, programme dates, track all stages of installation and associated quality checks and the like), take cognisance of stock levels, produce outputs (material order details) and align material allocations to site locations. - Establish and provide a team of subject matter experts to undertake detailed design and manage the works from works delivery and contract administration standpoint. - Procurement of materials required for construction of OLE system. - Delivery of a full OLE system from foundations to final registration for 13.205 single track kilometers (STK) on the Queen Street North route section, 1.5 STK on the Bay route section, and 45.555 STK on the Rhymney route section. The works that form the basis of this procurement event are partly funded by European Regional Development Funds (ERDF) resulting in prescriptive dates by which the ERDF monies must be expended. This therefore dictates the following completion dates for the works: - Final Registration of Queen Street North route section by 23/10/2023 - Final Registration of Bay route section by 15/06/2023 - Final Registration of Rhymney route section by 01/05/24 Specific OLE deliverables include, but are not limited to the design and construction of: - Foundation Installation - Circular Hollow Sections (CHS) piles, auger piles, concrete pads, plunge piles. - Mast Installation - single track cantilever masts, self-supporting anchor masts, twin track cantilever masts, portal masts. - Booms. - Ties, struts and small part steel including tensioning system etc - Switching including platforms as required - Wiring. - Final registration.
Lot Information
Lot 1
Design and installation of Overhead Line Equipment for the electrification of rail lines in Wales.
Notice Details
Publication & Lifecycle
- Open Contracting ID
- ocds-kuma6s-131228
- Publication Source
- Sell2Wales
- Latest Notice
- https://www.sell2wales.gov.wales/search/search_switch.aspx?ID=131228
- Current Stage
- Award
- All Stages
- Award
Procurement Classification
- Notice Type
- OJEU - F3 - Contract Award Notice
- Procurement Type
- Standard
- Procurement Category
- Works
- Procurement Method
- Open
- Procurement Method Details
- Open procedure
- Tender Suitability
- Not specified
- Awardee Scale
- Large
Common Procurement Vocabulary (CPV)
- CPV Divisions
45 - Construction work
-
- CPV Codes
45234100 - Railway construction works
Notice Value(s)
- Tender Value
- Not specified
- Lots Value
- Not specified
- Awards Value
- Not specified
- Contracts Value
- £38,000,000 £10M-£100M
Notice Dates
- Publication Date
- 3 May 20232 years ago
- Submission Deadline
- Not specified
- Future Notice Date
- Not specified
- Award Date
- 31 Mar 20232 years ago
- Contract Period
- Not specified - Not specified
- Recurrence
- Not specified
Notice Status
- Tender Status
- Complete
- Lots Status
- Complete
- Awards Status
- Not Specified
- Contracts Status
- Active
Buyer & Supplier
Contracting Authority (Buyer)
- Main Buyer
- TRANSPORT FOR WALES
- Contact Name
- Not specified
- Contact Email
- tfw.procurement@tfwrail.wales
- Contact Phone
- +44 2921673434
Buyer Location
- Locality
- PONTYPRIDD
- Postcode
- CF37 4TH
- Post Town
- Cardiff
- Country
- Wales
-
- Major Region (ITL 1)
- TLL Wales
- Basic Region (ITL 2)
- TLL5 South East Wales
- Small Region (ITL 3)
- TLL51 Central Valleys and Bridgend
- Delivery Location
- TLL Wales
-
- Local Authority
- Rhondda Cynon Taf
- Electoral Ward
- Pontypridd Town
- Westminster Constituency
- Pontypridd
Further Information
Notice Documents
-
https://www.sell2wales.gov.wales/search/show/search_view.aspx?ID=MAY436513
TfW Core Valley Lines Transformation - Rhymney Valley, Coryton and Bay Lines Electrification - The CVL Transformation programme of works forms an important part of the South Wales Metro and includes an ambitious and extensive range of rail works including electrification of circa 170km of track, new stations, major refurbishment / extension of stations and associated ancillary works. The overarching deliverables for the works are: - Establish and manage a materials distribution center (MDC) within a locality of the works which facilitates storage and expeditious delivery of materials to the worksites. - Provision of a comprehensive materials quality control & material management system which can, but not be limited to the following functions: receive inputs (AFC designs, bills of materials, programme dates, track all stages of installation and associated quality checks and the like), take cognisance of stock levels, produce outputs (material order details) and align material allocations to site locations. - Establish and provide a team of subject matter experts to undertake detailed design and manage the works from works delivery and contract administration standpoint. - Procurement of materials required for construction of OLE system. - Delivery of a full OLE system from foundations to final registration for 13.205 single track kilometers (STK) on the Queen Street North route section, 1.5 STK on the Bay route section, and 45.555 STK on the Rhymney route section. The works that form the basis of this procurement event are partly funded by European Regional Development Funds (ERDF) resulting in prescriptive dates by which the ERDF monies must be expended. This therefore dictates the following completion dates for the works: - Final Registration of Queen Street North route section by 23/10/2023 - Final Registration of Bay route section by 15/06/2023 - Final Registration of Rhymney route section by 01/05/24 Specific OLE deliverables include, but are not limited to the design and construction of: - Foundation Installation - Circular Hollow Sections (CHS) piles, auger piles, concrete pads, plunge piles. - Mast Installation - single track cantilever masts, self-supporting anchor masts, twin track cantilever masts, portal masts. - Booms. - Ties, struts and small part steel including tensioning system etc - Switching including platforms as required - Wiring. - Final registration.
Open Contracting Data Standard (OCDS)
View full OCDS Record for this contracting process
The Open Contracting Data Standard (OCDS) is a framework designed to increase transparency and access to public procurement data in the public sector. It is widely used by governments and organisations worldwide to report on procurement processes and contracts.
{
"tag": [
"compiled"
],
"id": "ocds-kuma6s-131228-2023-05-03T00:00:00Z",
"date": "2023-05-03T00:00:00Z",
"ocid": "ocds-kuma6s-131228",
"initiationType": "tender",
"parties": [
{
"id": "org-86",
"name": "Transport for Wales",
"identifier": {
"legalName": "Transport for Wales"
},
"address": {
"streetAddress": "3 Llys Cadwyn, Taff Street",
"locality": "Pontypridd",
"region": "UKL",
"postalCode": "CF37 4TH"
},
"contactPoint": {
"email": "TFW.Procurement@tfwrail.wales",
"telephone": "+44 2921673434"
},
"roles": [
"buyer",
"centralPurchasingBody"
],
"details": {
"classifications": [
{
"id": "Body governed by public law",
"scheme": "TED_CA_TYPE"
},
{
"description": "Rail",
"scheme": "COFOG"
},
{
"description": "Transport Related Services",
"scheme": "COFOG"
}
],
"url": "http://www.tfwrail.wales"
}
},
{
"id": "org-87",
"name": "Amey Rail Limited",
"identifier": {
"legalName": "Amey Rail Limited"
},
"address": {
"streetAddress": "10 Furnival Street",
"locality": "London",
"region": "UK",
"postalCode": "EC4A1AB"
},
"contactPoint": {
"telephone": "+44 7718168421"
},
"roles": [
"supplier"
],
"details": {
"scale": "large"
}
},
{
"id": "org-5",
"name": "High Court",
"identifier": {
"legalName": "High Court"
},
"address": {
"streetAddress": "Royal Courts of Justice, The Strand",
"locality": "London",
"postalCode": "WC2A 2LL"
},
"contactPoint": {
"telephone": "+44 2079477501"
},
"roles": [
"reviewBody"
]
}
],
"buyer": {
"name": "Transport for Wales",
"id": "org-86"
},
"tender": {
"id": "ocds-kuma6s-131228-tender-131228",
"title": "TfW Core Valley Lines Transformation - Rhymney Valley, Coryton and Bay Lines Electrification",
"description": "The CVL Transformation programme of works forms an important part of the South Wales Metro and includes an ambitious and extensive range of rail works including electrification of circa 170km of track, new stations, major refurbishment / extension of stations and associated ancillary works. The overarching deliverables for the works are: - Establish and manage a materials distribution center (MDC) within a locality of the works which facilitates storage and expeditious delivery of materials to the worksites. - Provision of a comprehensive materials quality control & material management system which can, but not be limited to the following functions: receive inputs (AFC designs, bills of materials, programme dates, track all stages of installation and associated quality checks and the like), take cognisance of stock levels, produce outputs (material order details) and align material allocations to site locations. - Establish and provide a team of subject matter experts to undertake detailed design and manage the works from works delivery and contract administration standpoint. - Procurement of materials required for construction of OLE system. - Delivery of a full OLE system from foundations to final registration for 13.205 single track kilometers (STK) on the Queen Street North route section, 1.5 STK on the Bay route section, and 45.555 STK on the Rhymney route section. The works that form the basis of this procurement event are partly funded by European Regional Development Funds (ERDF) resulting in prescriptive dates by which the ERDF monies must be expended. This therefore dictates the following completion dates for the works: - Final Registration of Queen Street North route section by 23/10/2023 - Final Registration of Bay route section by 15/06/2023 - Final Registration of Rhymney route section by 01/05/24 Specific OLE deliverables include, but are not limited to the design and construction of: - Foundation Installation - Circular Hollow Sections (CHS) piles, auger piles, concrete pads, plunge piles. - Mast Installation - single track cantilever masts, self-supporting anchor masts, twin track cantilever masts, portal masts. - Booms. - Ties, struts and small part steel including tensioning system etc - Switching including platforms as required - Wiring. - Final registration.",
"status": "complete",
"items": [
{
"id": "1",
"additionalClassifications": [
{
"id": "45234100",
"scheme": "CPV"
}
],
"deliveryAddresses": [
{
"region": "UKL"
}
],
"relatedLot": "1"
}
],
"procurementMethod": "open",
"procurementMethodDetails": "Open procedure",
"mainProcurementCategory": "works",
"documents": [
{
"id": "MAY436513",
"documentType": "awardNotice",
"title": "TfW Core Valley Lines Transformation - Rhymney Valley, Coryton and Bay Lines Electrification",
"description": "The CVL Transformation programme of works forms an important part of the South Wales Metro and includes an ambitious and extensive range of rail works including electrification of circa 170km of track, new stations, major refurbishment / extension of stations and associated ancillary works. The overarching deliverables for the works are: - Establish and manage a materials distribution center (MDC) within a locality of the works which facilitates storage and expeditious delivery of materials to the worksites. - Provision of a comprehensive materials quality control & material management system which can, but not be limited to the following functions: receive inputs (AFC designs, bills of materials, programme dates, track all stages of installation and associated quality checks and the like), take cognisance of stock levels, produce outputs (material order details) and align material allocations to site locations. - Establish and provide a team of subject matter experts to undertake detailed design and manage the works from works delivery and contract administration standpoint. - Procurement of materials required for construction of OLE system. - Delivery of a full OLE system from foundations to final registration for 13.205 single track kilometers (STK) on the Queen Street North route section, 1.5 STK on the Bay route section, and 45.555 STK on the Rhymney route section. The works that form the basis of this procurement event are partly funded by European Regional Development Funds (ERDF) resulting in prescriptive dates by which the ERDF monies must be expended. This therefore dictates the following completion dates for the works: - Final Registration of Queen Street North route section by 23/10/2023 - Final Registration of Bay route section by 15/06/2023 - Final Registration of Rhymney route section by 01/05/24 Specific OLE deliverables include, but are not limited to the design and construction of: - Foundation Installation - Circular Hollow Sections (CHS) piles, auger piles, concrete pads, plunge piles. - Mast Installation - single track cantilever masts, self-supporting anchor masts, twin track cantilever masts, portal masts. - Booms. - Ties, struts and small part steel including tensioning system etc - Switching including platforms as required - Wiring. - Final registration.",
"url": "https://www.sell2wales.gov.wales/search/show/search_view.aspx?ID=MAY436513",
"format": "text/html"
}
],
"lots": [
{
"id": "1",
"description": "Design and installation of Overhead Line Equipment for the electrification of rail lines in Wales.",
"status": "complete",
"awardCriteria": {
"criteria": [
{
"type": "quality",
"name": "Quality",
"description": "35%"
},
{
"type": "price",
"description": "65%"
}
]
},
"hasOptions": false
}
],
"coveredBy": [
"GPA"
],
"classification": {
"id": "45234100",
"scheme": "CPV"
},
"legalBasis": {
"id": "32014L0024",
"scheme": "CELEX"
}
},
"awards": [
{
"id": "ocds-kuma6s-131228-award-131228-55",
"suppliers": [
{
"id": "org-87",
"name": "Amey Rail Limited"
}
],
"relatedLots": [
"1"
]
}
],
"contracts": [
{
"id": "ocds-kuma6s-131228-award-131228-55",
"awardID": "ocds-kuma6s-131228-award-131228-55",
"status": "active",
"value": {
"amount": 38000000,
"currency": "GBP"
},
"dateSigned": "2023-03-31T00:00:00Z"
}
],
"language": "EN",
"relatedProcesses": [
{
"id": "1",
"relationship": [
"planning"
],
"scheme": "EU-OJ",
"identifier": "2022/S 180-510896"
}
],
"description": "(WA Ref:131228)",
"bids": {
"statistics": [
{
"id": "ocds-kuma6s-131228-bidsstatistic-131228-206",
"measure": "bids",
"value": 1,
"relatedLot": "1"
},
{
"id": "ocds-kuma6s-131228-bidsstatistic-131228-207",
"measure": "smeBids",
"value": 0,
"relatedLot": "1"
},
{
"id": "ocds-kuma6s-131228-bidsstatistic-131228-208",
"measure": "foreignBidsFromEU",
"value": 0,
"relatedLot": "1"
},
{
"id": "ocds-kuma6s-131228-bidsstatistic-131228-209",
"measure": "foreignBidsFromNonEU",
"value": 1,
"relatedLot": "1"
},
{
"id": "ocds-kuma6s-131228-bidsstatistic-131228-210",
"measure": "electronicBids",
"value": 1,
"relatedLot": "1"
}
]
},
"links": [
{
"rel": "canonical",
"href": "https://api.sell2wales.gov.wales/v1?lang=cy/Notice?id=ocds-kuma6s-131228"
}
],
"noticetype": "OJEU - F3 - Contract Award Notice"
}